ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MANTRA PARKVIEW COMMERCIAL

Completed No litigation declared Commercial project

MANTRA PARKVIEW COMMERCIAL

By MANTRA EARTH LLP

RG-MH-16493 · RERA P52100026142 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 60%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

MANTRA PARKVIEW COMMERCIAL is a Commercial project by MANTRA EARTH LLP in Pune, Maharashtra, registered with MahaRERA as P52100026142 on 21 Aug 2020. The registration is recorded completed; possession was promised by 30 Apr 2024.

At a glance

Project

  • NameMANTRA PARKVIEW COMMERCIAL
  • TypeCommercial
  • Location
    • DHAYARI
    • Dhayari (Part)
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • RERA no.P52100026142
  • ReraGenie IDRG-MH-16493

Builder

  • NameMANTRA EARTH LLP
  • Entity typePartnership
  • PartnerVISHAL NANDLAL GUPTA
  • Other registrations3 more →
  • Completed4 of 4

Key dates

this monthRegisteredAug 2020PromisedApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Aug 2020
  • Promised completion30 Apr 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMMERCIAL B3NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 60%.

COMMERCIAL B3: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Open Space6

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area158 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PRAVIN UTTAM BHINTADEDhayari (Part)Pune

Approvals and building plan

Permissible FSI249.19
Proposed, not sanctioned249 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSENAPATI BAPAT ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectmitesh Sidhpura & Associates
EngineerDesign Werkz
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
MANTRA EARTH LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jan 2024

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: mantra earth ph 3 commercial.pdf27 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B3 RES and Comm COMPLETION.pdf12 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Parkview Comm.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert B3 Comm.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert B3 Comm.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph B3 Comm.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert B3 COMM.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Parkview Comm_17-18 19-20.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Parkview Comm_17-18 19-20.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Parkview Comm_17-18 19-20.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Parkview_FORM 5_Phase III Comm.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ph 3 Comm.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Ph 3 Comm.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert B3 Comm.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert B3 Comm.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert B3 Comm.pdf17 Jul 2023
Details of encumbrancesFile: Earth_Parkview_Phase Commercial_Finance encumbrances.pdf15 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 3 Comm.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3 Comm.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Earth Ph 3 Comm_compressed.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 3 Comm.pdf13 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf17 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Earth Ph 3 Comm compressed.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certi Phase 3 Commercial.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certi Phase 3 Commercial.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Phase 3 Commercial.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Parkview_Phase 3 Comm.pdf6 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Park View Phase 3 Premises.pdf8 Nov 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold_Ph 3_Comm.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Earth Ph 3 Comm_compressed.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Mantra Earth Ph 3 Comm.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_ph 3_B3 Comm.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_ph 3_B3.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Ph 3_B3 Comm.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC_CERT_PH3-B3 COMMERCIAL BUIL.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_PH3 B3 COMMERCIAL.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_PH3_COMMERCIAL.pdf11 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate P2100026142.pdf11 Jan 2022
CERSAI detailsFile: CERSAI_REPORT.pdf11 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PH3-1-3_compressed.pdf11 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng commercial_compressed.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Park view B3 commercial QA.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Park view B3 commercial QA.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Park view B3 commercial QA.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: eng commercial_compressed.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: commercial_compressed.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: mantra earth llp form 5 phase 3 comm 20-21.pdf6 Oct 2021
Declaration about Commencement CertificateFile: PARKVIEW 2.pdf4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mantra Earth LLP Architect Certificate COMMERCIAL.pdf18 Aug 2021
Disclosure of sold/ booked inventoryFile: Earth Commercial.pdf27 Jul 2021
Disclosure of sold/ booked inventoryFile: Mantra Parkview Commercial.pdf2 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC .pdf20 Aug 2020
Building plan approvalFile: BUILDING PLANS.pdf18 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLANS.pdf18 Aug 2020
Proforma of Allotment letterFile: ATS.pdf18 Aug 2020
Layout approvalFile: LAYOUT.pdf17 Aug 2020
PAN CardFile: PAN.pdf17 Aug 2020
Copy of the legal title reportFile: LEGAL TITLE.pdf17 Aug 2020
Details of encumbrancesFile: DECLARATION.pdf17 Aug 2020
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf17 Aug 2020
Declaration in FORM BFile: Form - B promotor.pdf17 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for RERA park view commercial .pdf17 Aug 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANTRA PARKVIEW COMMERCIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAYARI13,700+ in Pune

Builder: MANTRA EARTH LLP

MANTRA EARTH LLP has 4 registrations on MahaRERA, including PARK VIEW PHASE 1 BUILDING A1 A2 and PARK VIEW PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANTRA PARKVIEW COMMERCIAL is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA PARKVIEW COMMERCIAL?

The registered promoter entity is MANTRA EARTH LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA PARKVIEW COMMERCIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANTRA PARKVIEW COMMERCIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA PARKVIEW COMMERCIAL?

The professionals named in the filing: Architect: mitesh Sidhpura & Associates; Engineer: Design Werkz; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA PARKVIEW COMMERCIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA PARKVIEW COMMERCIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA PARKVIEW COMMERCIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.