Home / Browse projects / Pune, Maharashtra / MANTRA MONARCH PHASE 2

Completed No litigation declared Residential / Group Housing project

MANTRA MONARCH PHASE 2

By MANTRA KINGDOM PRIVATE LIMITED

RG-MH-15926 · RERA P52100024453 · Last updated on MahaRERA portal: 25 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

MANTRA MONARCH PHASE 2 is a Residential / Group Housing project by MANTRA KINGDOM PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100024453 on 13 Feb 2020. The registration is recorded completed; possession was promised by 30 Jun 2026.

At a glance

Project

  • NameMANTRA MONARCH PHASE 2
  • TypeResidential / Group Housing
  • Location
    • BALEWADI INTERNAL ROAD
    • BALEWADI
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100024453
  • ReraGenie IDRG-MH-15926

Builder

  • NameMANTRA KINGDOM PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsROHIT GHANSHYAM GUPTA, ASHISH SATISH GUPTA
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2020PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Feb 2020
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A3NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BUILDING A3: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered62
Open Space8

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
ISHAYU VENTURES-Pune
RAKESH MOTILAL SHARMAParvatiPune
NILESH MOHANDAS NAVLAKHAGultekadiPune

Approvals and building plan

Permissible FSI6903.86
Proposed, not sanctioned5,000 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS B ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMITESH SIDHPURA
EngineerDESIGN WORKZ
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
MANTRA KINGDOM PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Apr 2025

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Phase 2.pdf25 Jul 2025
Form 2File: Engineer Phase 2.pdf25 Jul 2025
Form 3File: CA Certificate Monarch Ph 2_compressed.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ph 2.pdf25 Jul 2025
Form 1File: Archi Ph 2 - Copy.pdf10 Jun 2025
Form 2File: Eng Ph 2.pdf10 Jun 2025
Form 3File: CA Certificate_MOnarch ph 2.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ph 2.pdf10 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Monarch Phase 2.pdf10 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Phase 2 completion and form 4.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Ph 2.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MOnarch ph 2_compressed.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Ph 2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT MONARCH PHASE 2.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Monarch Phase 2.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG MONARCH PHASE 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PHASE 2.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: monarch ph 2.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ph 2.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 2.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Ph 2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 KINGDOM PH 2.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Monarch ph 2 Sold Unsold.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Monarch ph 2 Sold Unsold.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 KINGDOM PH 2.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: monarch form 1 ph 2.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Mantra Kingdom Ph-2.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 2.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ph 2.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 2.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eng Cert Ph 2.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_pHASE 2.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 2.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Kingdom_Phase 2_17-18 18-19.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kingdom_Phase 2_17-18 18-19.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Monarch_FORM 5_Phase 2.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ph 2.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 2.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf17 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MONARCH PH 2.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MOnarch ph 2_compressed.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf14 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration Phase 2.pdf20 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MOnarch ph 2_compressed.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kingdom_Phase 2.pdf6 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MOnarch ph 2_compressed.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Mantra Kingdom Ph 2.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArcCert_ph 2.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_ph 2.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MOnarch ph 2_compressed.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold_Ph 2.pdf13 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archiect Kingdom_ph 2.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARC CERT_PHASE 2_A3 RESIDENTIAL BUIL.pdf5 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Eng Cert_Phase 2_A3 Wing.pdf5 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Eng Cert_Phase 2_A3 Wing.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PHASE 2_A3,A4,A5_compressed.pdf5 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA CERT_Ph2.pdf5 Apr 2022
Layout approvalFile: Layout Plan_compressed (3).pdf16 Mar 2022
Building plan approvalFile: Wing- A2-A3_compressed.pdf16 Mar 2022
Copy of Layout Approval (in case of layout)File: Layout Plan_compressed (3).pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Wing- A2-A3_compressed.pdf16 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed (2).pdf16 Mar 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANTRA MONARCH PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALEWADI13,700+ in Pune

Builder: MANTRA KINGDOM PRIVATE LIMITED

MANTRA KINGDOM PRIVATE LIMITED has 3 registrations on MahaRERA, including MANTRA MONARCH PHASE 1 and MANTRA MONARCH PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANTRA MONARCH PHASE 2 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA MONARCH PHASE 2?

The registered promoter entity is MANTRA KINGDOM PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA MONARCH PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANTRA MONARCH PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA MONARCH PHASE 2?

The professionals named in the filing: Architect: MITESH SIDHPURA; Engineer: DESIGN WORKZ; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA MONARCH PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA MONARCH PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA MONARCH PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.