Home / Browse projects / Pune, Maharashtra / MANTRA CITY 360 PHASE04

Completed No litigation declared Residential / Group Housing project

MANTRA CITY 360 PHASE04

By MANTRA ISLAND HOMES TALEGAON LLP

RG-MH-10643 · RERA P52100001457 · Last updated on MahaRERA portal: 16 Oct 2023

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA
  • Completion date moved by 57 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
5Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

MANTRA CITY 360 PHASE04 is a Residential / Group Housing project by MANTRA ISLAND HOMES TALEGAON LLP in Pune, Maharashtra, registered with MahaRERA as P52100001457 on 28 Jul 2017. The registration is recorded completed; possession was promised by 1 Jul 2024. The completion date has moved by 57 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameMANTRA CITY 360 PHASE04
  • TypeResidential / Group Housing
  • Location
    • TALEGAON
    • Talegaon Dabhade (M Cl)
    • Mawal
    • Pune
    • 410506
  • Pincode410506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001457
  • ReraGenie IDRG-MH-10643

Builder

  • NameMANTRA ISLAND HOMES TALEGAON LLP
  • Entity typePartnership
  • PartnersMANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMMITED THROUGH DIRECTOR ROHIT GHANSHYAM GUPTA, ASHISH SATISH GUPTA
  • Other registrations5 more →
  • Completed4 of 6
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017First promiseOct 2019Revised toJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jul 2017
  • Promised completion1 Jul 2024
  • Revised completionRevised to 1 Jul 2024 (originally 31 Oct 2019)
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A1NA120000
BUILDING B1NA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 16 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
OtherYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28
BuildingClosed/CoveredTotal
BUILDING A11414
BUILDING B11414

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,417 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KHALDE BROTHERSTalegaon Dabhade (M Cl)Pune

Approvals and building plan

Permissible FSI9840.84
Proposed, not sanctioned9,841 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1548 BY A, SADASHIV PETH,OFF TILAK ROAD , PUNE, PIN 411030

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogesh Wakchaure
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
MANTRA ISLAND HOMES TALEGAON LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001507Oct 2019 → Oct 2020

Reason as filed by the promoterdue to slow market conditions we are not able to complete the project within that time

EXT52100011889Oct 2019 → Jul 2024

Reason as filed by the promoterCOVID PANDAMIC

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC005000000022415NILAM NITIN BHAGATMANTRA ISLAND HOME TALEGAON LLP11/01/2019
CC005000000064236Vinod Vilas PatilMantra City 360 (LLP)23/06/2020
CC005000000177655MANTRA ISLAND HOMES TALEGAON LLPMR. KHALIL SHAIKH10/11/2022
CC005000000177676MANTRA ISLAND HOMES TALEGAON LLPMR. DATTATRAY BHOSALE09/11/2022
CC005000000177677MANTRA ISLAND HOMES TALEGAON LLPMR. SUDHIR POOJARI09/11/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jan 2023

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: TALEGAON_PHASE 4_21-22.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Talegaon_FORM 5_Phase 4.pdf29 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Ph 4.pdf22 Jun 2023
Details of encumbrancesFile: Talegaon_City 360_Phase 4_Finance encumbrances.pdf15 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 4_.pdf20 Mar 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Ph 4 A1 B1.pdf23 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Ph 4 A1 B1.pdf23 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B1 Building Comp Cert.pdf10 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation_A1 building.pdf10 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation_A1 building.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Oct 2022
Certificates of CA (Form 3)File: Ca Cert Ph 4.pdf20 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Cert_ph 4.pdf17 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Cert_Ph 4.pdf20 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_ARC CERT_PH4.pdf25 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_ARC CERT_PH4.pdf23 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_ENG CERT_Phase 4_A1B1.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG CERT_Phase 4_A1 B1 Residential.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_PH4.pdf9 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG PH 4_compressed.pdf10 Jan 2022
CERSAI detailsFile: CERSAI_REPORT.pdf10 Jan 2022
Certificates of CA (Form 3)File: CA ph 4_compressed.pdf10 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4th Phase Mantra city 360.pdf7 Oct 2021
Declaration about Commencement CertificateFile: TALEGAON.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engphase 4_compressed.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Phase 4.pdf6 Oct 2021
Certificates of CA (Form 3)File: ph 4_compressed.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: mantra island homes talegoan phase 04 city 360 19-20.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: mantra island homes talegoan phase 04 city 360 20-21.pdf6 Oct 2021
Certificates of CA (Form 3)File: TALEGAON PH 4 CA CERTIFICATE_compressed.pdf19 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mantra City 360 4th Phase.pdf17 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 -_compressed.pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA Phase 4 01.pdf17 Aug 2021
Disclosure of sold/ booked inventoryFile: phase4_compressed.pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: M City 360 Ph 4_compressed.pdf2 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A1 wing Completion Letter.pdf27 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Mantra Island Phase 4.pdf18 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Mantra Island Phase 4.pdf18 Dec 2019
Certificates of CA (Form 5)File: MS Mantra Island Homes Talegaon LLP phase 4.pdf23 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT phase 4.pdf4 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG Phase 4.pdf4 Apr 2018
Certificates of CA (Form 3)File: CA city phase 4.pdf4 Apr 2018
Certificates of CA (Form 3)File: PHASE 4.PDF28 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 th phase nov.pdf19 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 4th Phase City 360.pdf19 Dec 2017
Certificates of CA (Form 3)File: Certificate - City 360 Phase-04.pdf19 Dec 2017
Declaration in FORM BFile: Promoter Phase 4-ilovepdf-compressed.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase04.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate phase04.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA Phase 4.pdf26 Jul 2017
OtherFile: Enviromental clearance certificate.pdf26 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf25 Jul 2017
Proforma of Allotment letterFile: Building - Residential.pdf25 Jul 2017
Proforma of Allotment letterFile: Allotment letter SP4.pdf25 Jul 2017
OtherFile: mom mantra 360.pdf25 Jul 2017
Copy of the legal title reportFile: legal title report.pdf24 Jul 2017
Layout approvalFile: Master layout A1 B1-ilovepdf-compressed (1).pdf23 Jul 2017
Building plan approvalFile: 1st floor plan.PDF23 Jul 2017
Building plan approvalFile: 10th floor plan.PDF23 Jul 2017
Building plan approvalFile: Odd floor plan.PDF23 Jul 2017
Building plan approvalFile: Terrace floor plan.PDF23 Jul 2017
PAN CardFile: Mantra Island Homes Talegaon LLP.pdf23 Jul 2017
Copy of Layout Approval (in case of layout)File: Master layout A1 B1-ilovepdf-compressed (1).pdf23 Jul 2017
Building Plan Approval (IOD)File: 1st floor plan.PDF23 Jul 2017
Building Plan Approval (IOD)File: 10th floor plan.PDF23 Jul 2017
Building Plan Approval (IOD)File: Odd floor plan.PDF23 Jul 2017
Building Plan Approval (IOD)File: Terrace floor plan.PDF23 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate A1 B1-ilovepdf-compressed.pdf23 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 57 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANTRA CITY 360 PHASE04 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALEGAON13,700+ in Pune

2 kmMANTRA CITY 360 PHASE04Completed 50Lapsed / revoked 38Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: MANTRA ISLAND HOMES TALEGAON LLP

MANTRA ISLAND HOMES TALEGAON LLP has 6 registrations on MahaRERA, including MANTRA CITY 360 PHASE01 and MANTRA CITY 360 PHASE02. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANTRA CITY 360 PHASE04 is delayed beyond 1 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA CITY 360 PHASE04?

The registered promoter entity is MANTRA ISLAND HOMES TALEGAON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA CITY 360 PHASE04?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANTRA CITY 360 PHASE04?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MANTRA CITY 360 PHASE04?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA CITY 360 PHASE04?

The professionals named in the filing: Architect: Yogesh Wakchaure; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA CITY 360 PHASE04?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA CITY 360 PHASE04. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA CITY 360 PHASE04 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.