Home / Browse projects / Pune, Maharashtra / Manorath

Completed No litigation declared Residential / Group Housing project

Manorath

By Samarth Realty

RG-MH-17368 · RERA P52100028793 · Last updated on MahaRERA portal: 22 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 26 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
41 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Manorath is a Residential / Group Housing project by Samarth Realty in Pune, Maharashtra, registered with MahaRERA as P52100028793 on 30 Mar 2021. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 26 months from the original filing. 1 of the 42 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameManorath
  • TypeResidential / Group Housing
  • Location
    • Bhangarwadi - Village Nagargaon
    • Bhangarwadi
    • Lonavala (M Cl)
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • RERA no.P52100028793
  • ReraGenie IDRG-MH-17368

Builder

  • NameSamarth Realty
  • Entity typePartnership
  • PartnersDhaval K Kothari, Chetan J Thakker
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMar 2021First promiseApr 2024Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Mar 2021
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Apr 2024)
  • Buildings1 building record
  • Documents filed123 files

Current status

2%1 of 42 units booked
94.3%Work done, per cost certificate

Figures as on 22 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and Wing BNA4342042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Wing A and Wing B: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Open Space44

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,436 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
Patil and SonsPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityLonavala Muncipal Council
Permissible FSI2740.08
Proposed, not sanctioned2,738 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBundgarden Pune
Estimated costRs 7.00 cr
Cost incurredRs 6.60 cr
Work done94.26%
BuildingWingEstimatedIncurred
Wing A and Wing BNARs 6.90 crRs 6.50 cr
-NARs 10.00 lakhRs 9.80 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKanhaiya Associates
EngineerAMIRALI DAWOODBHAI
Chartered AccountantANJK & Co LLP
Chartered AccountantJayantilal Chimanlal Rathod
PartnerRole in project
Samarth Realty-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017458Apr 2024 → Dec 2025

Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100028793 up to 28/12/2025.As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.

EA03122518519Apr 2024 → Jun 2026

Reason as filed by the promoterWe hereby request an extension of the project timeline under RERA due to unforeseen delays arising from multiple factors beyond our control. As the project is located in Lonavala, Maharashtra, the region experienced unusually heavy and prolonged rainfall, which significantly hampered on-site construction activities and affected the overall pace of work. In addition to the weather-related disruptions, the project also faced a shortage of both skilled labour and essential construction materials. Over the past few months, inconsistent workforce availability and irregular supply of critical raw ma

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf22 Jul 2026
Occupational CertificateFile: OC - 25-06-2026.pdf22 Jul 2026
Occupational CertificateFile: Form 4.pdf22 Jul 2026
Occupational CertificateFile: OC Verification Mail.pdf22 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf18 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate March 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate March 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate March 2026.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate Dec 25.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2 Engineer Certificate Dec 25.pdf14 Jan 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE Dec 25.pdf14 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2A FY 2024-25.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf18 Nov 2025
Withdrawal Update Form 1File: ARCH CERTIFICTE.pdf17 Oct 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf17 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1 ARCHITECT CERTIFICATE june 25.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 ENGINEER CERTIFICATE.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE June 25.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - March 2025 - Signed.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - March 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - March 2025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - December 2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate December 2024 Signed.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - December 2024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - December 24.pdf9 Jan 2025
Proforma of Agreement for saleFile: MASTER DOCUEMNTManorath Sale Agreement Final 01_07_2023 (1).pdf21 Nov 2024
Proforma of Agreement for saleFile: MASTER DOCUEMNTManorath Sale Agreement Final 01_07_2023 (1).pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - Sept 2024 - Sign.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 24.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5_Manorath_FY 2023-24.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory June 24.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate June 2024 - Sign.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FINAL.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY .pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Signed_11zon.pdf29 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration.pdf9 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation report_Allotment.pdf9 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report_Agreement.pdf9 Aug 2023
Details of encumbrances concerned to FinanceFile: Encrumbrance Finance and Legal.pdf15 Jul 2023
Details of encumbrances concerned to FinanceFile: Encrumbrance Finance and Legal.pdf15 Jul 2023
Details of encumbrances concerned to LegalFile: Encrumbrance Finance and Legal.pdf15 Jul 2023
Details of encumbrances concerned to LegalFile: Encrumbrance Finance and Legal.pdf15 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23 Signed_SR.pdf15 Jul 2023
Layout approvalFile: 1_compressed.pdf14 Jul 2023
Building plan approvalFile: 2_compressed.pdf14 Jul 2023
Building plan approvalFile: 3.pdf14 Jul 2023
Copy of the legal title reportFile: Search Title Report.pdf14 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance certificate with legal.pdf14 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrance certificate with legal.pdf14 Jul 2023
Copy of Layout Approval (in case of layout)File: 1_compressed.pdf14 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf14 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf14 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate of Lonavala_compressed.pdf14 Jul 2023
Declaration about Commencement CertificateFile: CC declaration.pdf14 Jul 2023
Declaration in FORM BFile: Form B -Declaration by promoter_compressed.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf14 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ca certificate_compressed.pdf14 Jul 2023
Proforma of Agreement for saleFile: Manorath Sale Agreement Final 01_07_2023.pdf14 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance March 2023.pdf20 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21 Signed.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 Signed.pdf10 May 2023

How this compares with Pune

2%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 26 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Manorath on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhangarwadi13,700+ in Pune

Builder: Samarth Realty

SAMARTH REALTY has 2 registrations on MahaRERA, including SUDHA and Manorath. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Manorath is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Manorath?

The registered promoter entity is Samarth Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Manorath?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Manorath?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Manorath?

The professionals named in the filing: Architect: Kanhaiya Associates; Engineer: AMIRALI DAWOODBHAI; Chartered Accountant: ANJK & Co LLP; Chartered Accountant: Jayantilal Chimanlal Rathod. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Manorath?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Manorath. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Manorath to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.