Home / Browse projects / Pune, Maharashtra / MANORAMA
MANORAMA
RG-MH-98898 · RERA P52100049035 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 3 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MANORAMA is a Residential / Group Housing project by PANDIT JAVDEKAR ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100049035 on 30 Jan 2023. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 1 of the 1 unit on this registration is recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameMANORAMA
- TypeResidential / Group Housing
- Location
- PRABHART ROAD
- ERANDWANE
- Peth
- Haveli
- Pune
- 411004
- Pincode411004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049035
- ReraGenie IDRG-MH-98898
Builder
- NamePANDIT JAVDEKAR ASSOCIATES
- Entity typePartnership
- GSTIN27AAPFK0643Q1ZP
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSHIVKUMAR ARVIND JAVDEKAR, RAHUL ARUNKUMAR PANDIT, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR
- Other registrations35 more →
- Completed24 of 36
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Jan 2023
- Promised completion31 Jul 2026
- Revised completionNone
- Buildings1 building record
- Documents filed151 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MANORAMA | NA | 20 | 20 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
MANORAMA: 69% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed69
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PANDIT JAVDEKAR ASSOCIATES | Pune (M Corp.) | Pune |
| SMT. SHEELA MADHAV APTE | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MANORAMA | NA | Rs 40.50 cr | Rs 34.73 cr |
| - | NA | Rs 3.50 cr | Rs 3.17 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arch. Sandeep Hardikar |
| Architect | Abhiraj Mahadik |
| Engineer | Mr. Uday Aradhye |
| Engineer | Niranjan Oak |
| Chartered Accountant | M/s. V. A. Dudhedia & Associate Partner Mr Vatsal Daga |
| Chartered Accountant | D G Kango |
| Partner | Role in project |
|---|---|
| PANDIT JAVDEKAR ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 May 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed151
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Manorama 2A 2025-26.PDF | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Manorama - 31-03-2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Manorama From 2.PDF | 20 Apr 2026 |
| Withdrawal Update Form 3File: Manorama From 3.PDF | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Manorama.PDF | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Manorama.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Manorama.pdf | 20 Jan 2026 |
| Form 2A (FY 2022-2023)File: Form 2A Manorama -31.3.2023.PDF | 19 Nov 2025 |
| Form 2A (FY 2023-2024)File: Manorama Form 2A 31-03-2024.PDF | 19 Nov 2025 |
| Form 5 (FY 2022-2023)File: Manorama - Form 5 2022-23.PDF | 19 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5 Manorama 31-03-2024.PDF | 19 Nov 2025 |
| Withdrawal Update Form 1File: Manorama Form 1 30-9-25.PDF | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Manorama-30-9-25.PDF | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form-3 Manorama 30-9-25.PDF | 16 Oct 2025 |
| Form 2A (FY 2024-2025)File: Manorama 2A 31.3.2025.PDF | 6 Oct 2025 |
| Form 5 (FY 2024-2025)File: Manorama Form 5.PDF | 1 Oct 2025 |
| Form 1File: Form 1.pdf | 12 Aug 2025 |
| Form 2File: Form 2A Manorama.PDF | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.PDF | 12 Aug 2025 |
| Form 3File: Form 3 CA Certificate.pdf | 12 Aug 2025 |
| Form 1File: FORM 1 MANORAMA.pdf | 12 Aug 2025 |
| Form 2File: Manorama Form 2 (2).PDF | 12 Aug 2025 |
| Form 3File: Form 3 CA Certificate.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Manorama Sale.PDF | 12 Aug 2025 |
| Form 1File: Form 1 Manorama 30092023.pdf | 12 Aug 2025 |
| Form 2File: Manorama Form 2 30092023.pdf | 12 Aug 2025 |
| Form 3File: Manorama Form - 3 30-09-23.PDF | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Manorama Sold Inventory 30092023.pdf | 12 Aug 2025 |
| Form 1File: FORM 1.PDF | 12 Aug 2025 |
| Form 2File: FORM 2.PDF | 12 Aug 2025 |
| Form 3File: FORM 3 DEC 23.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SALES DISCLOSURE.PDF | 12 Aug 2025 |
| Form 1File: Manorama Form - 1 31-12-2024.PDF | 12 Aug 2025 |
| Form 2File: Form-2 Manorama 31-12-24.PDF | 12 Aug 2025 |
| Form 3File: Form -3 Manorama(upto Dec,2024).pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sales Disclosure Manorama 31-12-24.PDF | 12 Aug 2025 |
| Form 1File: Manorama Form 1 31-03-2024.PDF | 12 Aug 2025 |
| Form 2File: Manorama Form 2 31-03-2024.PDF | 12 Aug 2025 |
| Form 3File: Manorama Form3 31-03-2024_compressed.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure.PDF | 12 Aug 2025 |
| Form 1File: Manorama Form 1 30-06-2024.PDF | 12 Aug 2025 |
| Form 2File: Manorama Form 2 30-06-2024.PDF | 12 Aug 2025 |
| Form 3File: Manorama Form 3 30-06-2024.PDF | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure 30-06-2024.PDF | 12 Aug 2025 |
| Form 1File: Manorama Form 1 30-09-2024.PDF | 12 Aug 2025 |
| Form 2File: Manorama Form-2 30-09-24.PDF | 12 Aug 2025 |
| Form 3File: Manorama Form-3 30-09-24.PDF | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure 30-09-2024.PDF | 12 Aug 2025 |
| Form 1File: Manorama Form 1 30-09-2024.PDF | 12 Aug 2025 |
| Form 2File: Manorama Form-2 30-09-24.PDF | 12 Aug 2025 |
| Form 3File: Manorama Form-3 30-09-24.PDF | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure 30-09-2024.PDF | 12 Aug 2025 |
| Building plan approvalFile: 5TH SANCTION PLAN 1 5 MANORAMA.pdf | 9 May 2025 |
| Building plan approvalFile: 5TH SANCTION PLAN 2 5 MANORAMA.pdf | 9 May 2025 |
| Building plan approvalFile: 5TH SANCTION PLAN 3 5 MANORAMA.pdf | 9 May 2025 |
| Building plan approvalFile: 5TH SANCTION PLAN 4 5 MANORAMA.pdf | 9 May 2025 |
| Building plan approvalFile: 5TH SANCTION PLAN 5 5 MANORAMA.pdf | 9 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 5TH SANCTION CC MANORAMA.pdf | 9 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 1 5 MANORAMA.pdf | 9 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 2 5 MANORAMA.pdf | 9 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 3 5 MANORAMA.pdf | 9 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 4 5 MANORAMA.pdf | 9 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 5 5 MANORAMA.pdf | 9 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manorama Form - 1 31-03-2025.PDF | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Manorama Form - 3 31-03-2025_compressed.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manorama Form - 2 31-03-2025.PDF | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Manorma Disclosure of Sold Inventory.PDF | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manoram_Form 1_Engineer Certificate (31-12-2024).PDF | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Manoram_Form 3_CA Certificate (31-12-2024).pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manoram_Form 2_Engineer Certificate (31-12-2024).PDF | 21 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Manoram_Sold Unsold Inventory (31-12-2024).PDF | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manorama Form 1.PDF | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Manorama Form 3.PDF | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manorama Form 2.PDF | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Manorama Sales Disclosure.PDF | 21 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Manorama Form 2A.PDF | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Manorama.PDF | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.PDF | 24 Jul 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ISHKRIPA | FP NO 223 PART 3 A CTS NO 773 PART 6A BHAMBURDA SHIVAJINAGAR PUNE | 10 | Completed | Feb 2015 | Feb 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 35 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 151 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MANORAMA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ERANDWANE13,700+ in Pune
Filed coordinates, straight-line distance. 273 registered projects within 2 km.
VENKATESH ERANDWANE CENTRAL - BUILDING-B1 - PH
SHREE VENKATESH BUILDCON PVT LTD
One Place-F.C. Road Phase 3
PALASH REALTORS LLP
45 NIRVAANA HILL - C2 WING
SINEW DEVELOPERS PRIVATE LIMITED
VENKATESH ERANDWANE CENTRAL - BUILDING-B2 - PH
SHREE VENKATESH BUILDCON PVT LTD
VENKATESH ERANDWANE CENTRAL - BUILDING-B3 - PH
SHREE VENKATESH BUILDCON PVT LTD
One Place-F.C Road Phase 2
PALASH REALTORS LLP
Builder: PANDIT JAVDEKAR ASSOCIATES
PANDIT JAVDEKAR ASSOCIATES has 36 registrations on MahaRERA, including YAMUNA NIWAS and RAJASHREE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MANORAMA is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MANORAMA?
The registered promoter entity is PANDIT JAVDEKAR ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAPFK0643Q1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MANORAMA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MANORAMA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MANORAMA?
The professionals named in the filing: Architect: Arch. Sandeep Hardikar; Architect: Abhiraj Mahadik; Engineer: Mr. Uday Aradhye; Engineer: Niranjan Oak; Chartered Accountant: M/s. V. A. Dudhedia & Associate Partner Mr Vatsal Daga; Chartered Accountant: D G Kango. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANORAMA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback