Home / Browse projects / Pune, Maharashtra / MANORAMA

Registered No litigation declared Residential / Group Housing project

MANORAMA

By PANDIT JAVDEKAR ASSOCIATES

RG-MH-98898 · RERA P52100049035 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 3 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
0 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

MANORAMA is a Residential / Group Housing project by PANDIT JAVDEKAR ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100049035 on 30 Jan 2023. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 1 of the 1 unit on this registration is recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMANORAMA
  • TypeResidential / Group Housing
  • Location
    • PRABHART ROAD
    • ERANDWANE
    • Peth
    • Haveli
    • Pune
    • 411004
  • Pincode411004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049035
  • ReraGenie IDRG-MH-98898

Builder

  • NamePANDIT JAVDEKAR ASSOCIATES
  • Entity typePartnership
  • GSTIN27AAPFK0643Q1ZP
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSHIVKUMAR ARVIND JAVDEKAR, RAHUL ARUNKUMAR PANDIT, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR
  • Other registrations35 more →
  • Completed24 of 36
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

3 months past promisethis monthRegisteredJan 2023PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jan 2023
  • Promised completion31 Jul 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed151 files

Current status

100%1 of 1 units booked
86.1%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANORAMANA2020101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

MANORAMA: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Closed/Covered69

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,808 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
PANDIT JAVDEKAR ASSOCIATESPune (M Corp.)Pune
SMT. SHEELA MADHAV APTEMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI9495.0
Proposed, not sanctioned8,164 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE
Estimated costRs 44.00 cr
Cost incurredRs 37.89 cr
Work done86.12%
BuildingWingEstimatedIncurred
MANORAMANARs 40.50 crRs 34.73 cr
-NARs 3.50 crRs 3.17 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch. Sandeep Hardikar
ArchitectAbhiraj Mahadik
EngineerMr. Uday Aradhye
EngineerNiranjan Oak
Chartered AccountantM/s. V. A. Dudhedia & Associate Partner Mr Vatsal Daga
Chartered AccountantD G Kango
PartnerRole in project
PANDIT JAVDEKAR ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Manorama 2A 2025-26.PDF30 Jun 2026
Withdrawal Update Form 1File: Form 1 Manorama - 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Manorama From 2.PDF20 Apr 2026
Withdrawal Update Form 3File: Manorama From 3.PDF20 Apr 2026
Withdrawal Update Form 1File: Form 1 Manorama.PDF20 Jan 2026
Withdrawal Update Form 2File: Form 2 Manorama.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Manorama.pdf20 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A Manorama -31.3.2023.PDF19 Nov 2025
Form 2A (FY 2023-2024)File: Manorama Form 2A 31-03-2024.PDF19 Nov 2025
Form 5 (FY 2022-2023)File: Manorama - Form 5 2022-23.PDF19 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 Manorama 31-03-2024.PDF19 Nov 2025
Withdrawal Update Form 1File: Manorama Form 1 30-9-25.PDF16 Oct 2025
Withdrawal Update Form 2File: Form 2 Manorama-30-9-25.PDF16 Oct 2025
Withdrawal Update Form 3File: Form-3 Manorama 30-9-25.PDF16 Oct 2025
Form 2A (FY 2024-2025)File: Manorama 2A 31.3.2025.PDF6 Oct 2025
Form 5 (FY 2024-2025)File: Manorama Form 5.PDF1 Oct 2025
Form 1File: Form 1.pdf12 Aug 2025
Form 2File: Form 2A Manorama.PDF12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.PDF12 Aug 2025
Form 3File: Form 3 CA Certificate.pdf12 Aug 2025
Form 1File: FORM 1 MANORAMA.pdf12 Aug 2025
Form 2File: Manorama Form 2 (2).PDF12 Aug 2025
Form 3File: Form 3 CA Certificate.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Manorama Sale.PDF12 Aug 2025
Form 1File: Form 1 Manorama 30092023.pdf12 Aug 2025
Form 2File: Manorama Form 2 30092023.pdf12 Aug 2025
Form 3File: Manorama Form - 3 30-09-23.PDF12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Manorama Sold Inventory 30092023.pdf12 Aug 2025
Form 1File: FORM 1.PDF12 Aug 2025
Form 2File: FORM 2.PDF12 Aug 2025
Form 3File: FORM 3 DEC 23.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: SALES DISCLOSURE.PDF12 Aug 2025
Form 1File: Manorama Form - 1 31-12-2024.PDF12 Aug 2025
Form 2File: Form-2 Manorama 31-12-24.PDF12 Aug 2025
Form 3File: Form -3 Manorama(upto Dec,2024).pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sales Disclosure Manorama 31-12-24.PDF12 Aug 2025
Form 1File: Manorama Form 1 31-03-2024.PDF12 Aug 2025
Form 2File: Manorama Form 2 31-03-2024.PDF12 Aug 2025
Form 3File: Manorama Form3 31-03-2024_compressed.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure.PDF12 Aug 2025
Form 1File: Manorama Form 1 30-06-2024.PDF12 Aug 2025
Form 2File: Manorama Form 2 30-06-2024.PDF12 Aug 2025
Form 3File: Manorama Form 3 30-06-2024.PDF12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure 30-06-2024.PDF12 Aug 2025
Form 1File: Manorama Form 1 30-09-2024.PDF12 Aug 2025
Form 2File: Manorama Form-2 30-09-24.PDF12 Aug 2025
Form 3File: Manorama Form-3 30-09-24.PDF12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure 30-09-2024.PDF12 Aug 2025
Form 1File: Manorama Form 1 30-09-2024.PDF12 Aug 2025
Form 2File: Manorama Form-2 30-09-24.PDF12 Aug 2025
Form 3File: Manorama Form-3 30-09-24.PDF12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Manorama Sales Disclosure 30-09-2024.PDF12 Aug 2025
Building plan approvalFile: 5TH SANCTION PLAN 1 5 MANORAMA.pdf9 May 2025
Building plan approvalFile: 5TH SANCTION PLAN 2 5 MANORAMA.pdf9 May 2025
Building plan approvalFile: 5TH SANCTION PLAN 3 5 MANORAMA.pdf9 May 2025
Building plan approvalFile: 5TH SANCTION PLAN 4 5 MANORAMA.pdf9 May 2025
Building plan approvalFile: 5TH SANCTION PLAN 5 5 MANORAMA.pdf9 May 2025
Commencement Certificates / NA Order for plotted developmentFile: 5TH SANCTION CC MANORAMA.pdf9 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 1 5 MANORAMA.pdf9 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 2 5 MANORAMA.pdf9 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 3 5 MANORAMA.pdf9 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 4 5 MANORAMA.pdf9 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 5TH SANCTION PLAN 5 5 MANORAMA.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manorama Form - 1 31-03-2025.PDF21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Manorama Form - 3 31-03-2025_compressed.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manorama Form - 2 31-03-2025.PDF21 Apr 2025
Disclosure of sold/ booked inventoryFile: Manorma Disclosure of Sold Inventory.PDF21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manoram_Form 1_Engineer Certificate (31-12-2024).PDF21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Manoram_Form 3_CA Certificate (31-12-2024).pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manoram_Form 2_Engineer Certificate (31-12-2024).PDF21 Jan 2025
Disclosure of sold/ booked inventoryFile: Manoram_Sold Unsold Inventory (31-12-2024).PDF21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manorama Form 1.PDF21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Manorama Form 3.PDF21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manorama Form 2.PDF21 Oct 2024
Disclosure of sold/ booked inventoryFile: Manorama Sales Disclosure.PDF21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Manorama Form 2A.PDF21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Manorama.PDF21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.PDF24 Jul 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ISHKRIPAFP NO 223 PART 3 A CTS NO 773 PART 6A BHAMBURDA SHIVAJINAGAR PUNE10CompletedFeb 2015Feb 2015

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANORAMA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ERANDWANE13,700+ in Pune

2 kmMANORAMACompleted 88Lapsed / revoked 32Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 273 registered projects within 2 km.

Builder: PANDIT JAVDEKAR ASSOCIATES

PANDIT JAVDEKAR ASSOCIATES has 36 registrations on MahaRERA, including YAMUNA NIWAS and RAJASHREE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANORAMA is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANORAMA?

The registered promoter entity is PANDIT JAVDEKAR ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAPFK0643Q1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANORAMA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANORAMA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANORAMA?

The professionals named in the filing: Architect: Arch. Sandeep Hardikar; Architect: Abhiraj Mahadik; Engineer: Mr. Uday Aradhye; Engineer: Niranjan Oak; Chartered Accountant: M/s. V. A. Dudhedia & Associate Partner Mr Vatsal Daga; Chartered Accountant: D G Kango. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANORAMA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANORAMA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANORAMA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.