Home / Browse projects / Thane, Maharashtra / MANNAT

Completed No litigation declared Others project

MANNAT

By Jayshree Builders

RG-MH-56004 · RERA P51700014298 · Last updated on MahaRERA portal: 13 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

MANNAT is a Others project by Jayshree Builders in Thane, Maharashtra, registered with MahaRERA as P51700014298 on 20 Nov 2017. The registration is recorded completed; possession was promised by 30 Dec 2021.

At a glance

Project

  • NameMANNAT
  • TypeOthers
  • Location
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700014298
  • ReraGenie IDRG-MH-56004

Builder

  • NameJayshree Builders
  • Entity typePartnership
  • PartnersRamesh Amrutlal Mehta, Jayshree Ramesh Mehta, Mallika Deepak Mehta, Alpa Ketan Mehta
  • Other registrations6 more →
  • Completed6 of 7
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Nov 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANNATNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MANNAT: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area995 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1201.47
Proposed, not sanctioned1,201 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHARAD KUNJ, DR MOOSE ROAD, OPP GADKARI RANGAYATAN, TALAO PALI, THANE WEST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRACHANA SHILP
EngineerKHASNIS AND ASSOCIATES
PartnerRole in project
Jayshree Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jun 2023

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: Details Of Encumbrances Legal.pdf13 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Mannat.pdf13 Nov 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf13 Nov 2024
CERSAI detailsFile: CERSAI.pdf13 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf13 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf13 Nov 2024
Details of encumbrances concerned to LegalFile: Details Of Encumbrances Legal.pdf13 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf13 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Ramesh Mehta.pdf13 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Jayshree Mehta.pdf13 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Deepak Mehta.pdf13 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Alpa Mehta.pdf13 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Mallika Mehta.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annexure A Ramesh Mehta.pdf13 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 20.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 21.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 21.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 20.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 20.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 20.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 19.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 19.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 19.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June19.pdf8 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Mannat.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) June 2019.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) June 2021.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) March 2021.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) Dec 2020.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) Sept 2020.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) June 2020.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) March 2020.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) Dec 2019.pdf8 Nov 2024
Certificates of CA (Form 3)File: Jayshree Builders (Mannat) Sept 2019.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2021.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2019.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2021.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2020.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2020.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2020.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2019.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2019.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2020.pdf8 Nov 2024
Proforma of Agreement for saleFile: AFS.pdf8 Nov 2024
PAN CardFile: Jayshree Builders Pan Card.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: rera apr19-mar 20.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: rera apr20-mar 21.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: rera apr 21-jun 21.pdf24 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Mannat CC.PDF27 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: form 4 mannat.pdf12 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 23-12-2017.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 09-04-2018.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 13-07-2018.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 11-10-2018.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 08-01-2019.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 13-04-2019.pdf2 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 05-01-2018.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 31-03-2018.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 10-07-2018.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 15-10-2018.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 28-12-2018.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 23-03-2019.pdf29 Apr 2023
Certificates of CA (Form 3)File: Form 3 -Oct to Dec 17.pdf13 Apr 2023
Certificates of CA (Form 3)File: March 18 Mannat.pdf13 Apr 2023
Certificates of CA (Form 3)File: June 18.pdf13 Apr 2023
Certificates of CA (Form 3)File: Sept 18.pdf13 Apr 2023
Certificates of CA (Form 3)File: Form 3 Oct - Dec 18.pdf13 Apr 2023
Certificates of CA (Form 3)File: Form 3 Mar 19.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: jayshree builders FY 17-18 form 5.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: JB Mannat Form 5 FY 18-19.pdf13 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Mannat OC.pdf25 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Mannat.pdf5 Aug 2021
Certificates of CA (Form 5)File: jayshree builders 7.pdf15 Oct 2018
Details of encumbrancesFile: encumbrance-certificate.pdf9 Mar 2018
Building plan approvalFile: 11-Building-Plan-Approval-(IOD).pdf13 Nov 2017
Layout approvalFile: 14-Copy of Layout Approval (in case of layout).pdf13 Nov 2017
Copy of the legal title reportFile: 8-Copy-of-the-legal-title-report.pdf13 Nov 2017
Details of encumbrancesFile: 3-Details of encumbrances.pdf13 Nov 2017
Copy of Layout Approval (in case of layout)File: 14-Copy of Layout Approval (in case of layout).pdf13 Nov 2017
Building Plan Approval (IOD)File: 11-Building-Plan-Approval-(IOD).pdf13 Nov 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
AMRUT HEAVENAMRUT HEAVEN GODREJ HILL KHADAKPADA KALYAN-421301252CompletedDec 2011Late, Jun 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANNAT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan7,600+ in Thane

2 kmMANNATCompleted 93Lapsed / revoked 54Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: Jayshree Builders

Jayshree Builders has 7 registrations on MahaRERA, including LILIUM and Amrut Siddhi. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MANNAT is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANNAT?

The registered promoter entity is Jayshree Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANNAT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANNAT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANNAT?

The professionals named in the filing: Architect: RACHANA SHILP; Engineer: KHASNIS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANNAT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANNAT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANNAT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.