Home / Browse projects / Pune, Maharashtra / Mango Tree Villa Phase 2

Registered Litigation declared Residential / Group Housing project

Mango Tree Villa Phase 2

By Palchin Real Estates Private Limited

RG-MH-95014 · RERA P52100053927 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 26 months
  • 1 extension taken
  • Rs 2,400.00 crore secured on the land, in favour of HDFC Capital

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedmoved 26 months from the original
0 of 11Construction stages donefurthest along: Excavation, 5%
5 of 5Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Mango Tree Villa Phase 2 is a Residential / Group Housing project by Palchin Real Estates Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100053927 on 11 Dec 2023. Possession is promised by 30 Jun 2029. The completion date has moved by 26 months from the original filing. 0 of the 5 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameMango Tree Villa Phase 2
  • TypeResidential / Group Housing
  • Location
    • Pune Solapur Road
    • Shewalwadi
    • Shewalewadi
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053927
  • ReraGenie IDRG-MH-95014

Builder

  • NamePalchin Real Estates Private Limited
  • Entity typeCompany
  • DirectorsSunita Khanna, Neerav Parmar, Viral Thakkar
  • Other registrations6 more →

Key dates

this monthRegisteredDec 2023First promiseApr 2027Revised toJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion30 Jun 2029
  • Revised completionRevised to 30 Jun 2029 (originally 30 Apr 2027)
  • Buildings1 building record
  • Documents filed95 files

Current status

0%0 of 5 units booked
0.0%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row House R9 to R13NA22505

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 5%.

Row House R9 to R13: 0% average across the applicable activities

ActivityProgress
Excavation5%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered15
Open Space15

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,463 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC Capital
Secured amountRs 2,400.00 crore
CERSAI search filedYes
Declared on17 Feb 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI4317.64
Proposed, not sanctioned1,318 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 12,13,14, SUKHWANI PACIFIC PHASE2, S NO 31 OPP ADITYA BIRLA HOSPITAL,PUNE 411033
Estimated costRs 12.20 cr
Work done0.0%
BuildingWingEstimatedIncurred
Row House R9 to R13NARs 10.73 cr-
-NARs 1.47 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFourth Dimension Architects Private Limited
EngineerER. Ambadas T Kharatmol
EngineerRahul Krishna Singh Revulagadda
Chartered AccountantB R Nagda & Co
Chartered AccountantHarshad Doshi & Co
PartnerRole in project
Palchin Real Estates Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02072621654Apr 2027 → Jun 2029

Reason as filed by the promoterAs per reasons of delay and other documents enclosed.

Litigation declared1

CaseCourtStatus
CAA/3377/MB/2019/2019NCLT MumbaiClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Villa 2- Form 1- June 2026.pdf21 Jul 2026
Withdrawal Update Form 2File: Villa 2- Form 2- June 2026.pdf21 Jul 2026
Withdrawal Update Form 3File: Villa 2- Form 3- June 2026.pdf21 Jul 2026
Form 1File: Villa 2- Form 1- March 2025.pdf3 Jul 2026
Form 2File: Villa 2- Form 2- March 2025.pdf3 Jul 2026
Form 3File: Villa 2- Form 3- March 2025.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Villa 2- Inventory Report- March 2025.pdf3 Jul 2026
Form 5 (FY 2024-2025)File: Villa 2- Form 5- FY 24-25.pdf30 Jun 2026
Form 2A (FY 2024-2025)File: Villa 2- Form 2A- March 2025.pdf29 Jun 2026
Form 2A (FY 2025-2026)File: Villa 2- Form 2A (FY 25-26).pdf29 Jun 2026
Layout approvalFile: Villa Phase 2 Plans_ S4.pdf29 May 2026
Layout approvalFile: Villa Phase 2_ S12.pdf29 May 2026
Building plan approvalFile: Commencement Certificate.pdf29 May 2026
Withdrawal Update Form 1File: Villa Phase 2- Form 1- March 2026.pdf28 May 2026
Withdrawal Update Form 2File: Villa 2- Form 2- March 2026.pdf28 May 2026
Withdrawal Update Form 3File: 202603 RERA Certificate MTV Villa Phase 2 - RERA.pdf28 May 2026
Withdrawal Update Form 1File: Villa 2- Form 1- Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Villa 2- Form 1- June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Villa 2- Form 1- Sept 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Villa 2- Form 2- Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Villa 2- Form 2- June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Villa 2- Form 2- Sept 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: Villa 2- Form 3- Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: Villa 2- Form 3- June 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: FORM3_VILLA Phase2_Sept-25.pdf17 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Villa 2- PPR- Sept 2024.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Villa 2- Form 1- Sept 2024.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Villa 2- PPR- Dec 2024.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Villa 2- Form 1- Dec 2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- No Withdrawal- Sept 2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- Form 3- Sept 2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- No Withdrawal- Dec 2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- Form 3- Dec 2024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villa 2- Form 2- Sept 2024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villa 2- Form 2- Dec 2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- No Withdrawal- Sept 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- No Withdrawal- Dec 2024.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Villa 2- Form 5- FY 23-24.pdf20 Jan 2025
Proforma of Agreement for saleFile: AFS Mrunmai Villa 2 (for RERA) 19-12-2023 (20-08-2024).pdf20 Aug 2024
Proforma of Allotment letterFile: Allotment letter Villa 2 (for RERA) 21-11-2023 (20-08-2024).pdf20 Aug 2024
Other - LegalFile: Palchin Regd Scheme Part 1.pdf20 Aug 2024
Other - LegalFile: Palchin Regd Scheme Part 2.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MTV Villa 2- Form 1- June 2024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MTV Villa 2- Physical Progress- June 2024.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MTV Villa 2- Form 2- June 2024.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: MTV Villa 2- Inventory Report- June 2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MTV Villa 2- Form 3- June 2024 (reduced).pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MTV Villa 2- No Withdrawals- June 2024.pdf13 Aug 2024
Copy of the legal title reportFile: Palchin- Title Report (MTV Project).pdf6 Aug 2024
PAN CardFile: Palchin PAN.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Villa 2- Physical Progress Declaration- Mar'24.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villa 2- Physical Progress Declaration- Mar'24.pdf25 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Villa 2- Form 2A Declaration- Mar'24.pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- No Withdrawals- Mar 2024.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Villa 2- No Progress Declaration- Dec'23_signed.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villa 2- No Progress Declaration- Dec'23_signed.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa 2- No Withdrawals- Dec 2023_signed.pdf12 Mar 2024
Other - TechnicalFile: Mrunmai BR- Statutory.pdf8 Dec 2023
Details of encumbrances concerned to FinanceFile: V2- Mrunmai- Legal Encumbrance 04122023.pdf4 Dec 2023
Details of encumbrances concerned to LegalFile: V2- Mrunmai- Legal Encumbrance 04122023.pdf4 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villa Phase 2- Form 3- Oct 23.pdf4 Dec 2023
Proforma of Allotment letterFile: Draft Allotment letter Villa Phase 2 (21112023).pdf4 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation Report- Allotment Letter- Villas Phase 2 (21112023).pdf4 Dec 2023
Other - LegalFile: V2- Declaration on Survey (legal) 04122023.pdf4 Dec 2023
Other - LegalFile: (2) NCLT Order- 17th Feb 2020.pdf4 Dec 2023
Other - LegalFile: (1) Mrunmai- Palchin Scheme.pdf4 Dec 2023
Other - LegalFile: (3) NCLT Order dtd 10th July 2023.pdf4 Dec 2023
Other - LegalFile: Villa 2- Declaration for 2012 Demerger.pdf4 Dec 2023
Other - LegalFile: Part 1.pdf4 Dec 2023
Other - LegalFile: Part 2.pdf4 Dec 2023
Other - LegalFile: Part 3.pdf4 Dec 2023
Other - FinanceFile: V2- Declaration for Separate Bank Account 04122023.pdf4 Dec 2023
Declaration in FORM BFile: Villa Phase 2- Form B.pdf4 Nov 2023
Proforma of Agreement for saleFile: Draft AFS- Villa Phase 2.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: V2- Mrunmai- Financial Encumbrance.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: V2- Mrunmai- Financial Encumbrance.pdf2 Nov 2023
Declaration about Commencement CertificateFile: V2- CC Declaration.pdf2 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: V2- Declaration for Separate Bank Account.pdf2 Nov 2023
Deviation Report with respect to model copy of AgreementFile: V2- Deviation Report for AFS.pdf2 Nov 2023
Other - TechnicalFile: V2- Declaration on Survey (technical).pdf2 Nov 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 26 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mango Tree Villa Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shewalwadi13,700+ in Pune

2 kmMango Tree Villa Phase 2Completed 39Lapsed / revoked 14Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 94 registered projects within 2 km.

Builder: Palchin Real Estates Private Limited

Palchin Real Estates Private Limited has 7 registrations on MahaRERA, including Mango Tree Villa Tower 3 and Mango Tree Villa Tower 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mango Tree Villa Phase 2 is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mango Tree Villa Phase 2?

The registered promoter entity is Palchin Real Estates Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mango Tree Villa Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mango Tree Villa Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mango Tree Villa Phase 2?

The professionals named in the filing: Architect: Fourth Dimension Architects Private Limited; Engineer: ER. Ambadas T Kharatmol; Engineer: Rahul Krishna Singh Revulagadda; Chartered Accountant: B R Nagda & Co; Chartered Accountant: Harshad Doshi & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mango Tree Villa Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mango Tree Villa Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mango Tree Villa Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.