ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Mangeshi Neptune

Registered No litigation declared Residential / Group Housing project

Mangeshi Neptune

By Mangesh Dashrath Gaikar

RG-MH-95432 · RERA P51700049741 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 13 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 18 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
129 of 129Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Mangeshi Neptune is a Residential / Group Housing project by Mangesh Dashrath Gaikar in Thane, Maharashtra, registered with MahaRERA as P51700049741 on 24 Feb 2023. Possession is promised by 31 Dec 2027. 0 of the 129 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameMangeshi Neptune
  • TypeResidential / Group Housing
  • Location
    • Kalyan
    • Ambivali
    • Vadavali Kh.
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049741
  • ReraGenie IDRG-MH-95432

Builder

  • NameMangesh Dashrath Gaikar
  • Entity typeIndividual
  • GSTIN27AFAPG5995H1Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations18 more →
  • Completed8 of 19
  • No longer live2 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects13 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Current status

0%0 of 129 units booked
1.5%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA202011910129

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

1: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered33
Open Space44

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,330 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jul 2025

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municiple Corporation
Permissible FSI9337.0
Proposed, not sanctioned1,743 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivaji Chowk Kalyan West
Estimated costRs 22.50 cr
Cost incurredRs 34.72 lakh
Work done1.54%
BuildingWingEstimatedIncurred
1NARs 22.50 crRs 34.72 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Insight
EngineerDipali Patil
EngineerPratik Deepak Patil
EngineerAnuj Sharma
Chartered AccountantINS And Associates
Chartered AccountantSantosh Kumar Padhi
Chartered AccountantK P Kapadia & Co
Chartered AccountantKirti N Shah & Co.
PartnerRole in project
Mangesh Dashrath Gaikar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Neptune - March 2026.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 - Neptune - March 26.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 - Neptune - March 26.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 - Neptune - March 26.pdf12 May 2026
Withdrawal Update Form 1File: Form 1 - Neptune - Dec 25.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 - Neptune - Dec 25.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3 - Neptune - Dec 25.pdf2 Feb 2026
Withdrawal Update Form 1File: Form 1 - Sept 25.pdf25 Dec 2025
Withdrawal Update Form 2File: Form 2 - Sept 25.pdf25 Dec 2025
Withdrawal Update Form 3File: Form 3 - Sept 25.pdf25 Dec 2025
Withdrawal Update Form 1File: Form 1 - New.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf29 Oct 2025
Withdrawal Update Form 3File: Neptune CA Certificate Form 3 June 25 final.pdf29 Oct 2025
Form 1File: Declaration Q4 24-25 final.pdf22 Jul 2025
Form 2File: fORM 2.pdf22 Jul 2025
Form 3File: Neptune CA Certificate Form 3 Mar 25 Final.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sales MIS.pdf22 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Q4 24-25 final.pdf22 Jul 2025
Form 1File: Declaration.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3 30-06-2024_Final.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf20 Jul 2025
Form 1File: declaration.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form -3 30-09-2024_Final.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: declaration.pdf20 Jul 2025
Form 1File: Declaration.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3 31-12-2024-Final.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold details_compressed.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf20 Jul 2025
Form 1File: Declaration.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 31-03-2023_Final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold details.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf19 Jul 2025
Form 1File: Declaration.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 30-06-2023_Final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold details.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf19 Jul 2025
Form 1File: Declaration.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 30-09-2023_Final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold details.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf19 Jul 2025
Form 1File: Declaration.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 31-12-2023_Final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf19 Jul 2025
Form 1File: Declaration.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 31-03-2024_Final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory Mar 24.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf19 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf16 Jul 2025
Form 2A (FY 2022-2023)File: Form 2A.pdf15 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf15 Jul 2025
Form 5 (FY 2022-2023)File: Form 5.pdf15 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 2024-25 Final.pdf15 Jul 2025
Disclosure of sold/ booked inventoryFile: Sales MIS.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory Mar 24.pdf23 Apr 2024
Other - FinanceFile: Declaration.pdf23 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Neptune.pdf23 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf16 Jan 2024
Other - FinanceFile: Declaration.pdf16 Jan 2024
Other - FinanceFile: Declaration.pdf19 Oct 2023
Other - FinanceFile: Declaration.pdf19 Oct 2023
Other - FinanceFile: Declaration.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: sold unsold details.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold details.pdf10 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold details.pdf10 Sep 2023
Details of encumbrances concerned to FinanceFile: neptune bw.pdf15 Feb 2023
Details of encumbrances concerned to LegalFile: neptune bw.pdf15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 sign.pdf6 Feb 2023

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MANGESHI CRYSTALP51700009923Kalyan, Thane39Aug 2017CompletedJun 2018Sep 2017
Mangeshi FlooraRambaug Lane No.4 end Chikanghar Kalyan West110-CompletedSep 2015Jun 2015
Mangeshi EliteRambag Lane No.4 end Chikanghar Kalyan West175-CompletedDec 2014Oct 2014
Chandrabhaga-IIShree Complex Chowk Kolivali Kalyan West63-CompletedJun 2014Jan 2014
VishnukunjAdharwadi Chowk Kalyan West15-CompletedSep 2013May 2013
Mangeshi ViharShree Complex Chowk Wadeghar Kalyan West66-CompletedJun 2013Mar 2013
Mangeshi City-IIShree Complex Chowk Kolivali Kalyan West130-CompletedJun 2013Feb 2013
Mangeshi City-IShree Complex Chowk Kolivali Kalyan West395-CompletedMar 2013Oct 2012
Appaji DhamShree Complex Chowk Wadeghar Kalyan West94-CompletedSep 2012Mar 2012
Mangeshi Srushti-IIKhadakpada Nr. Vasantvally Kalyan West179-CompletedMar 2012Mar 2012
Mangeshi Srushti-IKhadakpada Nr. Vasantvali Gandhare Kalyan West154-CompletedDec 2010Nov 2010
Mangeshi SaharaChikanghar Kalyan West193-CompletedDec 2010Nov 2010
Chandrabhaga TowerShree Complex Chowk Kolivali Kalyan West53-CompletedAug 2010Mar 2010

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mangeshi Neptune on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambivali7,600+ in Thane

2 kmMangeshi NeptuneCompleted 175Lapsed / revoked 64Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: Mangesh Dashrath Gaikar

Mangesh Dashrath Gaikar has 19 registrations on MahaRERA, including USSH KIRAN and MANGESHI CRYSTAL. Its filings disclose 13 earlier MahaRERA projects: declares 13 of 13 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Mangeshi Neptune is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mangeshi Neptune?

The registered promoter entity is Mangesh Dashrath Gaikar, an individual as per the filing. Its GSTIN 27AFAPG5995H1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mangeshi Neptune?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mangeshi Neptune?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mangeshi Neptune?

The professionals named in the filing: Architect: Space Insight; Engineer: Dipali Patil; Engineer: Pratik Deepak Patil; Engineer: Anuj Sharma; Chartered Accountant: INS And Associates; Chartered Accountant: Santosh Kumar Padhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mangeshi Neptune?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mangeshi Neptune. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mangeshi Neptune to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.