Red flags
- Rs 25.00 crore secured on the land, in favour of PIRAMAL ENERRISES LTD
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MANGESH RESIDENCY is a Residential / Group Housing project by TENDULKAR AND ASSOCIATES in DADAR WEST, 400028, registered with MahaRERA as P51900052706 on 22 Sep 2023. Possession is promised by 31 Dec 2027. 3 of the 51 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameMANGESH RESIDENCY
- TypeResidential / Group Housing
- Location
- SARASWATIBAI JOSHI MARG
- DADAR WEST
- 400028
- Pincode400028
- RERA no.P51900052706
- ReraGenie IDRG-MH-06439
Builder
- NameTENDULKAR AND ASSOCIATES
- Entity typePartnership
- PartnersSUNANDA SUBHASH TENDULKAR, SIDDHESH SUBHASH TENDULKAR
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Sep 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Current status
Figures as on 26 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MANGESH RESIDENCY | MANGESH RESIDENCY | 23 | 23 | 51 | 0 | 51 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.
MANGESH RESIDENCY · wing MANGESH RESIDENCY : 41% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| UMA WAGLE | Borivali | Mumbai Suburban |
| VISHVESH WAGLE | Borivali | Mumbai Suburban |
| RAMA GAJANAN NABAR | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MANGESH RESIDENCY | MANGESH RESIDENCY | Rs 33.82 cr | Rs 26.59 cr |
| - | NA | Rs 33.82 cr | Rs 26.59 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DEONATH KURMI |
| Engineer | A D SHINTRE CONSULTANTS |
| Chartered Accountant | R A V & CO |
| Chartered Accountant | RAV AND CO |
| Partner | Role in project |
|---|---|
| TENDULKAR AND ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jan 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Approved Drawing dec241225--rera.pdf | 26 Jun 2026 |
| Building plan approvalFile: 2502969_FurtherCC_signed.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate-- sept 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - 2.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: form 3 Mangesh Residency dec final.pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate-- sept 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate-- sept 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate-- juNE 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate-- juNE 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate-- sept 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - 2.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - 2.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - 1.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - 1.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - 2.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: form 3 Mangesh Residency 29th Dec.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: form 3 Mangesh Residency 29th Dec.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: Mangesh Residency June 2025 Form 3.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: Mangesh Residency June 2025 Form 3.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: form 3 Mangesh Residency 29th Dec.pdf | 2 Jan 2026 |
| Building plan approvalFile: Approved Drawing dec241225.pdf | 26 Dec 2025 |
| Building plan approvalFile: Amended Letter DEC241225.pdf | 26 Dec 2025 |
| Building plan approvalFile: approved last amended plans up to 22nd floor_FINAL.pdf | 21 Nov 2025 |
| Form 3File: Form 3 Mangesh Residency SEPT_final.pdf | 24 Jul 2025 |
| Form 1File: Architect Certificate.pdf | 24 Jul 2025 |
| Form 2File: ENG CERTIFICATE.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf | 24 Jul 2025 |
| Form 1File: march24 Architect Certificate form 1.pdf | 24 Jul 2025 |
| Form 2File: Engineer certificate--March-24 form2.pdf | 24 Jul 2025 |
| Form 3File: Mangesh Residency Form 3 dated MARCH24-final.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf | 24 Jul 2025 |
| Form 1File: MARCH25 Architect Certificate.pdf | 24 Jul 2025 |
| Form 2File: MARCH25 Engineer certificate.pdf | 24 Jul 2025 |
| Form 3File: FORM 3 MANGESH RESIDENCY 31ST MARCH 2025.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf | 24 Jul 2025 |
| Withdrawal Update Form 1File: Architect Certificate FOR RERA.pdf | 24 Jul 2025 |
| Withdrawal Update Form 2File: ENG CERTIFICATE.pdf | 24 Jul 2025 |
| Withdrawal Update Form 3File: FORM 3 MANGESH RESIDENCY 31ST MARCH 2025.pdf | 24 Jul 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 MANGESH RESIDENCY 31ST MARCH 2025 SINGED.pdf | 24 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3-Saraswati-December 2024.pdf | 7 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 10 Feb 2025 |
| Building plan approvalFile: AMEND-drawing approved-09-01-2025.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: AMEND-drawing approved-09-01-2025.pdf | 9 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC upto 14th floor.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march24 Architect Certificate.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept24 Architect Certificate(1).pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate--March-24.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate--sept-24.pdf | 8 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Mangesh Residency DEC23.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mangesh Residency Form 3 dated MARCH24.pdf | 5 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mangesh Residency Form 5 for 23-24.pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FOR RERA.pdf | 1 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mangesh Residency SEPT_compressed (1).pdf | 20 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Tendulkar and Associates.pdf | 20 Mar 2024 |
| Proforma of Agreement for saleFile: AFS_ Tendulkar_Mangesh Residency_11092023.pdf | 12 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT --AFS_11zon (1).pdf | 12 Sep 2023 |
| Declaration about Commencement CertificateFile: FORMAT- D.pdf | 11 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 11 Sep 2023 |
| Proforma of Allotment letterFile: Final Allotment Letter 04092023.pdf | 5 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 31 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 29 Aug 2023 |
| Layout approvalFile: IOD PLANS--349.pdf | 28 Aug 2023 |
| PAN CardFile: TENDULKAR ASSOCIATES-PANCARD.pdf | 28 Aug 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 28 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: IOD PLANS--349.pdf | 28 Aug 2023 |
| CERSAI detailsFile: declaration for cersai.pdf | 18 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf | 18 Aug 2023 |
| Declaration in FORM BFile: Affidavit Cum Declaration --FINAL.pdf | 14 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: declaration for no deviation in draft allotment letter.pdf | 10 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: declaration on no encumbrances.pdf | 8 Aug 2023 |
| Details of encumbrances concerned to LegalFile: declaration on no encumbrances.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE.pdf | 8 Aug 2023 |
| Building plan approvalFile: IOD.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf | 7 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC.pdf | 7 Aug 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHRI PRASANNA | OFF BHAVANI SHANKAR ROAD DADAR WEST | 15 | Completed | Apr 2020 | Late, Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- All 77 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MANGESH RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DADAR WEST
Kohinoor Square Phase 1
Kohinoor CTNL Infrastructure Company Priva
Sigma Garnet
COLO COLOR PRIVATE LIMITED
PALETTE
SURAJ ESTATE DEVELOPERS LTD
Eon One
Firstlight Properties Private Limited
Ratan Address
Shri Nakoda Enterprises
Promesa West End
M/s. virtue Enterprises
Builder: TENDULKAR AND ASSOCIATES
TENDULKAR AND ASSOCIATES has 1 registration on MahaRERA, including MANGESH RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if MANGESH RESIDENCY is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MANGESH RESIDENCY?
The registered promoter entity is TENDULKAR AND ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MANGESH RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MANGESH RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MANGESH RESIDENCY?
The professionals named in the filing: Architect: DEONATH KURMI; Engineer: A D SHINTRE CONSULTANTS; Chartered Accountant: R A V & CO; Chartered Accountant: RAV AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANGESH RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback