Mangalam
By Mangalam
RG-MH-07638 · RERA P50500034916 · Last updated on MahaRERA portal: 13 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mangalam is a Plotted project by Mangalam in Nagpur, Maharashtra, registered with MahaRERA as P50500034916 on 28 Apr 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 13 of the 13 units on this registration are recorded sold or booked.
At a glance
Project
- NameMangalam
- TypePlotted
- Location
- P.H. No. 20
- Khasra No. 81(Part)
- Kapsi bk
- Kamptee
- Nagpur
- 440008
- Pincode440008
- RERA no.P50500034916
- ReraGenie IDRG-MH-07638
Builder
- NameMangalam
- Entity typePartnership
- PartnersShravan Ratankar Nerkar, Neha Shravan Nerkar
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on28 Apr 2022
- Promised completion31 Mar 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed67 files
Current status
Figures as on 13 Dec 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | B P Gohar |
| Engineer | B P Gohar |
| Chartered Accountant | Devendra B Taori |
| Partner | Role in project |
|---|---|
| Mangalam | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Nov 2024
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Kapsi 81.pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 1.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase I.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Inventary.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase I_11zon.pdf | 21 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NOC 1.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 1.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase I_11zon.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase I.pdf | 21 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NOC 1.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Inventary.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Phase -1 Q4.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase - 1 Q1.pdf | 10 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Phase -1 Q4.pdf | 10 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase - 1 Q1.pdf | 10 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A Phase -1.pdf | 10 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Stock Phase -1 Q4.pdf | 10 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Stock Phase - 1 Q1.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Phase -1 Q4.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase - 1 Q1.pdf | 10 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Phase -1.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1 Form 1 Quarter 3_compressed.pdf | 17 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 Form 2 Quarter 3_11zon.pdf | 17 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Inventary Q3 Phase 1.pdf | 17 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1 Form 3 Quarter 3_11zon.pdf | 17 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 mangalam.pdf | 21 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Mangalam Q4 Fy 22-23.pdf | 9 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Mangalam Q 1 FY 23-24.pdf | 9 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Mangalam Q 2 FY 23-24.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERRIFICATE Q4 FY 22-23.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFIACTE Q 1 FY 23-24.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Q2 FY 23-24.pdf | 9 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q 1 FY 22-23.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q-2 FY 22-23.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q-3 FY 22-23.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 FY-22-23.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-1 Fy 2023-24.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q-2 FY 2023-24.pdf | 8 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-4 FY 22-23.pdf | 8 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q 1 FY 23-24.pdf | 8 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q-2 FY 23-24.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1-Qtr-1-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1-Qtr-2-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1-Qtr-3-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2-Qtr-1-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2-Qtr-2-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2-Qtr-3-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: 7 Disclosure of Sold-Booked Inventory-Qtr-1-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: 7 Disclosure of Sold-Booked Inventory-Qtr-2-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: 7 Disclosure of Sold-Booked Inventory-Qtr-3-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3-Qtr-1-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3-Qtr-2-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3-Qtr-3-FY 2022-23-Mangalam-P-I.pdf | 31 Mar 2023 |
| Copy of the legal title reportFile: Legal Report.pdf | 18 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-CA-Certificate.pdf | 18 Apr 2022 |
| Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf | 18 Apr 2022 |
| Layout approvalFile: Sanctioned Map-Comp.pdf | 12 Apr 2022 |
| Building plan approval or NA orderFile: NA Certificate.pdf | 12 Apr 2022 |
| PAN CardFile: Mangalam-PAN.pdf | 12 Apr 2022 |
| Details of encumbrancesFile: Certificate of Encumbrances.pdf | 12 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Sanctioned Map-Comp.pdf | 12 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Certificate.pdf | 12 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-NMRDA.pdf | 12 Apr 2022 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf | 12 Apr 2022 |
| Declaration in FORM BFile: Form-B-Comp.pdf | 12 Apr 2022 |
| CERSAI detailsFile: CERSAI-Search-Report.pdf | 12 Apr 2022 |
| Proforma of Allotment letterFile: Proforma of Agreement to Sell.pdf | 12 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Mangalam on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Khasra No. 81(Part)2,800+ in Nagpur
KUKREJA PARIS CITY-WING C & D
KUKREJA INFRASTRUCTURES
kASTURI HEIGHT
SKY DEVELOPERS AND PROMOTERS INDIA PVT. LT
EASTORIA GRACE
EASTORIA BUILDERS AND DEVLOPERS LLP
SDPL Om
SANDEEP DWELLERS PVT. LTD.
UDYOG VIHAR
ALLIANCE REALITIES
KUKREJA INFINITY EAST
KUKREJA INFRASTRUCTURES
See every Nagpur project, with the district possession charts
Builder: Mangalam
Mangalam has 2 registrations on MahaRERA, including Mangalam and Mangalam-Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that Mangalam shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Mangalam is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mangalam?
The registered promoter entity is Mangalam, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mangalam?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mangalam?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mangalam?
The professionals named in the filing: Architect: B P Gohar; Engineer: B P Gohar; Chartered Accountant: Devendra B Taori. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mangalam?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback