MANGALAM APARTMENT

By AARYA IMEX

RG-MH-83382 · RERA P51600054413 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
19 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

MANGALAM APARTMENT is a Others project by AARYA IMEX in Nashik, Maharashtra, registered with MahaRERA as P51600054413 on 19 Jan 2024. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 7 months from the original filing. 7 of the 26 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameMANGALAM APARTMENT
  • TypeOthers
  • Location
    • JALALPUR SHIWAR
    • NASHIK
    • JALALPUR
    • 422222
  • Pincode422222
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600054413
  • ReraGenie IDRG-MH-83382

Builder

  • NameAARYA IMEX
  • Entity typePartnership
  • PartnerANUPA YOGESH PAREEK

Key dates

7 months past promisethis monthRegisteredJan 2024First promiseAug 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Jan 2024
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed71 files

Current status

27%7 of 26 units booked
107.7%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANGALAMNA7520626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MANGALAM: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area623 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Aug 2025

Approvals and building plan

Sanctioning authorityNASHIK MUNCIPAL CORPORATION
Permissible FSI1745.67
Proposed, not sanctioned1,746 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJEHAN CIRCLE NASHIK
Estimated costRs 5.50 cr
Cost incurredRs 5.92 cr
Work done107.73%
BuildingWingEstimatedIncurred
MANGALAMNARs 3.00 crRs 3.40 cr
-NARs 2.50 crRs 2.52 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMOL KHARDE
EngineerSUDARSHAN ANAWADE
Chartered AccountantPRATIK P BHANSALI
Chartered AccountantKBS AND COMPANY
PartnerRole in project
AARYA IMEX-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18092502633Aug 2025 → Mar 2026

Reason as filed by the promoterRespecte Sir We, Aarya Impex, hereby request an extension for the completion of our project. The project could not be completed within the stipulated time due to financial constraints and lack of booking response. We humbly request to grant us extension till 31/03/2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT_CERTIFICATE_Mar 26.pdf12 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate mar 2026.pdf12 Jun 2026
Withdrawal Update Form 3File: RERA C A Certificate MAR 2026.pdf12 Jun 2026
Withdrawal Update Form 1File: ARCHITECT_CERTIFICATE_dec 25.pdf20 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf20 May 2026
Withdrawal Update Form 3File: Arya Imex CA CERTIFICATE DEC25.pdf20 May 2026
Withdrawal Update Form 1File: ARCHITECT_CERTIFICATE_dec 25.pdf18 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf18 May 2026
Withdrawal Update Form 3File: Arya Imex CA CERTIFICATE DEC25.pdf18 May 2026
Form 1File: ARCHITECT_CERTIFICATE_SEPT_25.pdf29 Nov 2025
Form 2File: Engineer Certificate Sept 25.pdf29 Nov 2025
Form 3File: Aarya Imex Form 3[1].pdf29 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold sept 2025.pdf29 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A new ..pdf10 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A new ..pdf10 Sep 2025
Form 1File: Architect’s Certificate (Form 1).pdf2 Sep 2025
Form 2File: Engineer’s Certificate (Form 2).pdf2 Sep 2025
Form 3File: CA Certificate (Form 3).pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mar 24 sold unsold.pdf2 Sep 2025
Form 1File: Architect’s Certificate (Form 1).pdf2 Sep 2025
Form 2File: Engineer’s Certificate (Form 2).pdf2 Sep 2025
Form 3File: CA Certificate (Form 3).pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: june 24 sold unsold.pdf2 Sep 2025
Form 1File: Form 1 sept 24.pdf2 Sep 2025
Form 2File: 2 SEPT24.pdf2 Sep 2025
Form 3File: Form 3 Sept 24.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sept 24 sold unsold.pdf2 Sep 2025
Form 1File: Form 1 Dec 24.pdf2 Sep 2025
Form 2File: 2 DEC24.pdf2 Sep 2025
Form 3File: Dec 24 form 3.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Dec24 sold unsold.pdf2 Sep 2025
Form 1File: Form 1 Mar 25.pdf2 Sep 2025
Form 2File: 2MAR 25.pdf2 Sep 2025
Form 3File: March 25 form 3.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mar 25 sold unsold.pdf2 Sep 2025
Withdrawal Update Form 1File: Form 1 June 25.pdf2 Sep 2025
Withdrawal Update Form 2File: 2 JUNE 25.pdf2 Sep 2025
Withdrawal Update Form 3File: June 25 form 3.pdf2 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate _MAR.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -JUNE.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MAR-24.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JUNE-24.pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE- FINAL.pdf31 Dec 2024
Other - TechnicalFile: NMRDA Mail Screeshot.pdf10 Jan 2024
CERSAI detailsFile: CERSAI Undertaking.pdf20 Dec 2023
Copy of the legal title reportFile: Title search report.pdf13 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Legal.pdf13 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Legal.pdf13 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-AYP.pdf13 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-YOP-new.pdf13 Dec 2023
Proforma of Allotment letterFile: Model allotment letter.pdf13 Dec 2023
CERSAI detailsFile: CERSAI_Search_Report_200286518409_For_Asset_Based_Search_11_11_2023_13_00_46_364.pdf11 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Aarya IMEX_compressed.pdf11 Nov 2023
Proforma of Agreement for saleFile: Draft agreement to sale-Aarya IMEX_compressed.pdf11 Nov 2023
Layout approvalFile: Sancationed Building plan -Mangalam_compressed.pdf3 Oct 2023
Building plan approvalFile: Sancationed Building plan -Mangalam_compressed.pdf3 Oct 2023
Building plan approvalFile: NA Order.pdf3 Oct 2023
PAN CardFile: Aarya IMEX-PAN.pdf3 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance certificate-Aarya IMEX.pdf3 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance certificate-Aarya IMEX.pdf3 Oct 2023
Copy of Layout Approval (in case of layout)File: Sancationed Building plan -Mangalam_compressed.pdf3 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sancationed Building plan -Mangalam_compressed.pdf3 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf3 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: NMRDA_CC.pdf3 Oct 2023
Declaration about Commencement CertificateFile: Form D -Aarya IMEX RERA.pdf3 Oct 2023
Declaration in FORM BFile: Form B.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Cert.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-aarya imex.pdf3 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A- Seperate Bank ac- aarya imex.pdf3 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation -Aarya IMEX.pdf3 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation -Aarya IMEX.pdf3 Oct 2023

How this compares with Nashik

27%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 7 months
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANGALAM APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmMANGALAM APARTMENTCompleted 37Lapsed / revoked 14Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 79 registered projects within 2 km.

Builder: AARYA IMEX

AARYA IMEX has 1 registration on MahaRERA, including MANGALAM APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that MANGALAM APARTMENT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MANGALAM APARTMENT is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANGALAM APARTMENT?

The registered promoter entity is AARYA IMEX, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANGALAM APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANGALAM APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANGALAM APARTMENT?

The professionals named in the filing: Architect: AMOL KHARDE; Engineer: SUDARSHAN ANAWADE; Chartered Accountant: PRATIK P BHANSALI; Chartered Accountant: KBS AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANGALAM APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANGALAM APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANGALAM APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.