Home / Browse projects / Aurangabad, Maharashtra / Manali Park

Completed No litigation declared Residential / Group Housing project

Manali Park

By Manali Builders And Developers

RG-MH-84981 · RERA P51500023838 · Last updated on MahaRERA portal: 13 Apr 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Feb 2023Possession promisedregistration recorded completed
18 of 66Construction stages doneacross 6 buildings; furthest along: Basement (if any), 80%
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

Manali Park is a Residential / Group Housing project by Manali Builders And Developers in Aurangabad, Maharashtra, registered with MahaRERA as P51500023838 on 7 Jan 2020. The registration is recorded completed; possession was promised by 26 Feb 2023.

At a glance

Project

  • NameManali Park
  • TypeResidential / Group Housing
  • Location
    • New NH 211 - Dhule High Way
    • Waluj Mahanagar -1
    • Tisgaon
    • Aurangabad
    • 431102
  • Pincode431102
  • RERA no.P51500023838
  • ReraGenie IDRG-MH-84981

Builder

  • NameManali Builders And Developers
  • Entity typePartnership
  • PartnersMahesh Dyandeo Damale, Rahul Bhagwanrao Satarkar, Pramod Vinod Gulecha

Key dates

this monthRegisteredJan 2020PromisedFeb 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Jan 2020
  • Promised completion26 Feb 2023
  • Revised completionNone
  • Buildings6 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Type BuildingNA40000
B Type BuildingNA40000
C Type BuildingNA20000
E Type BuildingNA40000
F Type BuildingNA40000
G Type BuildingNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 13 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Basement (if any), at 80%.

A Type Building38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Type Building58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Type Building29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor10%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E Type Building24%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F Type Building63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G Type Building5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered48
Open Space3
BuildingClosed/CoveredOpen SpaceTotal
A Type Building12012
B Type Building11011
C Type Building033
E Type Building808
F Type Building909
G Type Building808

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,732 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Manali Builders And DevelopersAurangabad (M Corp.)Aurangabad
Ramesh Devidas KasureTisgaonAurangabad
Chandulal Devidas KasureAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI3688.0
Proposed, not sanctioned3,688 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor, Renuka Commercial Complex, Nirala Bazar, Aurangabad , 431001, Maharashtra

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB V RAUT
EngineerPRADEEP MOTE
Chartered AccountantCA GOPAL MALPANI
PartnerRole in project
Manali Builders And Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Nov 2022

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 MANALI park(new) Manali Builders.pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: Manali Builders.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23_compressed.pdf9 Mar 2024
Other - TechnicalFile: Manali Park Registration Certificate.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2A FY 2020-21 Manali Builders.pdf1 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: From 2A FY 2021-22 Manali Builders.pdf1 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-04 (24-06-2022)MANALI PARK.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22_compressed.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022-23_compressed.pdf9 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C- Manali Park Completion Chandulala Certificate_compressed.pdf9 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C-Ramesh Kasure Completion certificate_compressed.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Manali Builders 19-20.pdf22 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Manali Builders 20-21.pdf22 Mar 2022
Disclosure of sold/ booked inventoryFile: manali builders.pdf2 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT-161_Reduce Final.pdf11 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER CERTIFICATE-161_Reduce final.pdf11 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certificate for CA -161_Reduce Final.pdf11 Oct 2020
Details of encumbrancesFile: encumbrances.pdf28 Dec 2019
Declaration in FORM BFile: Form B.pdf28 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca CERTIFICATE nvm.pdf28 Dec 2019
Proforma of Allotment letterFile: Allotment letter.pdf28 Dec 2019
Layout approvalFile: Lay out permission manali park_compressed.pdf27 Dec 2019
Building plan approvalFile: Chandulal Kasure Sanction letter.pdf27 Dec 2019
Layout approvalFile: N A order 161 Manali Park_compressed.pdf27 Dec 2019
Building plan approvalFile: Building plan E Type.pdf27 Dec 2019
Building plan approvalFile: Building plan F type.pdf27 Dec 2019
Building plan approvalFile: Building plan G type.pdf27 Dec 2019
Building plan approvalFile: Ramesh Kasure Sanction letter.pdf27 Dec 2019
Building plan approvalFile: Building plan A type.pdf27 Dec 2019
Building plan approvalFile: Building B type.pdf27 Dec 2019
Building plan approvalFile: Building C type.pdf27 Dec 2019
PAN CardFile: Manali pan card.pdf27 Dec 2019
Copy of the legal title reportFile: SEARCH REPORT MANALI BUILDERS AND DEVELOPERS_compressed (1).pdf27 Dec 2019
Copy of Layout Approval (in case of layout)File: Lay out permission manali park_compressed.pdf27 Dec 2019
Copy of Layout Approval (in case of layout)File: N A order 161 Manali Park_compressed.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Chandulal Kasure Sanction letter.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Building plan E Type.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Building plan F type.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Building plan G type.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Ramesh Kasure Sanction letter.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Building plan A type.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Building B type.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Building C type.pdf27 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Chandulal kasure comm certificate.pdf27 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Ramesh Kasure Comm Certificate.pdf27 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: archi certiFICATE.pdf27 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi certiFICATE.pdf27 Dec 2019
Proforma of Allotment letterFile: ATS MANALI PARK CHANDUALAL.pdf27 Dec 2019
Proforma of Allotment letterFile: ATS MANALI PARK RAMESH.pdf27 Dec 2019

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Manali Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Waluj Mahanagar -11,400+ in Aurangabad

Builder: Manali Builders And Developers

Manali Builders And Developers has 1 registration on MahaRERA, including Manali Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Manali Park is delayed beyond 26 Feb 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Manali Park?

The registered promoter entity is Manali Builders And Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Manali Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Manali Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Manali Park?

The professionals named in the filing: Architect: B V RAUT; Engineer: PRADEEP MOTE; Chartered Accountant: CA GOPAL MALPANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Manali Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Manali Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Manali Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.