Home / Browse projects / Thane, Maharashtra / MAN RESIDENCES

De-registered No litigation declared Residential / Group Housing project

MAN RESIDENCES

By MERINO SHELTERS PRIVATE LIMITED

RG-MH-85777 · RERA P51700008980 · Last updated on MahaRERA portal: 11 Nov 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
1 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 95%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

MAN RESIDENCES is a Residential / Group Housing project by MERINO SHELTERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700008980 on 19 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameMAN RESIDENCES
  • TypeResidential / Group Housing
  • Location
    • SION PANVEL NATIONAL HIGHWAY
    • NERUL
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008980
  • ReraGenie IDRG-MH-85777

Builder

  • NameMERINO SHELTERS PRIVATE LIMITED
  • Entity typeCompany
  • ChairpersonRAMESHCHANDRA JHAMAKLAL MANSUKHANI
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on19 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAN RESIDENCES - INA320000
MAN RESIDENCES - IINA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 95%.

MAN RESIDENCES - I63%
ActivityProgress
Excavation95%
Basement (if any)80%
Podiums (if any)25%
Plinth80%
Stilt Floor100%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MAN RESIDENCES - II0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes10%
Street LightingYes25%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed222

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots222
Closed/Covered168
Open Space54
BuildingClosed/CoveredOpen SpaceTotal
MAN RESIDENCES - I10827135
MAN RESIDENCES - II602787

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area984 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13853.4
Proposed, not sanctioned8,314 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVILE PARLE WEST MUMBAI - 400056

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPOSITRON ARCHITECTS
ArchitectCHANDRASHEKHAR ARCHITECTS PVT LTD
EngineerH M RAJE
PartnerRole in project
MERINO SHELTERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Man Intelli Park-Mar-24 (Form5).pdf11 Nov 2024
OtherFile: IMG-20200316-WA0034 FORCE MAJEUR.pdf20 Mar 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Man Residencies.pdf21 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Man Residencies.pdf4 Feb 2020
Layout approvalFile: APPROVED PLAN 2.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 3.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 4.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 5.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 6.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 7.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 8.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 9.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 10.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 11.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 12.pdf23 Sep 2019
Layout approvalFile: APPROVED PLAN 1.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 1.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 2.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 3.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 4.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 5.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 6.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 7.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 8.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 9.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 10.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 11.pdf23 Sep 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN 12.pdf23 Sep 2019
OtherFile: Man Residencies.pdf23 Sep 2019
Details of encumbrancesFile: Encumbrance Certificate MAN Resi- DHFL RERA Account.pdf13 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Man Residences.pdf7 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER-CERTIFICATE - RESI.pdf28 Mar 2018
Certificates of CA (Form 3)File: CA Cert Man_Residencies.pdf28 Mar 2018
Building plan approvalFile: Res - Sections.pdf9 Aug 2017
Building plan approvalFile: Res Basement.pdf9 Aug 2017
Building plan approvalFile: Res Elevation.pdf9 Aug 2017
Building plan approvalFile: Res Penthouse Plan.pdf9 Aug 2017
Building plan approvalFile: Res Stilt and Typical Flr Plan.pdf9 Aug 2017
Building plan approvalFile: Res- Typical 2nd and 4th Flr.pdf9 Aug 2017
Copy of the legal title reportFile: Title Report - Apex.pdf9 Aug 2017
Building Plan Approval (IOD)File: Res - Sections.pdf9 Aug 2017
Building Plan Approval (IOD)File: Res Basement.pdf9 Aug 2017
Building Plan Approval (IOD)File: Res Elevation.pdf9 Aug 2017
Building Plan Approval (IOD)File: Res Penthouse Plan.pdf9 Aug 2017
Building Plan Approval (IOD)File: Res Stilt and Typical Flr Plan.pdf9 Aug 2017
Building Plan Approval (IOD)File: Res- Typical 2nd and 4th Flr.pdf9 Aug 2017
Declaration in FORM BFile: Form B- Residences.pdf9 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER-CERTIFICATE man residences.pdf9 Aug 2017
Certificates of CA (Form 3)File: Form 3 -MAN_Residences_opt.pdf9 Aug 2017
Proforma of Allotment letterFile: Allotmnt Decl - Res.pdf9 Aug 2017
Proforma of Allotment letterFile: Allot-Man Residences.pdf9 Aug 2017
Proforma of Allotment letterFile: App - Man Residences.pdf9 Aug 2017
OtherFile: Declaration - Res.pdf9 Aug 2017
OtherFile: Proposed Layout Plan_001.pdf9 Aug 2017
Layout approvalFile: Layout copy.pdf8 Aug 2017
Building plan approvalFile: Latest LOI 1.pdf8 Aug 2017
Building plan approvalFile: Latest LOI 2.pdf8 Aug 2017
PAN CardFile: PAN Registraion.pdf8 Aug 2017
Details of encumbrancesFile: MAN Residences-Encumbrances.pdf8 Aug 2017
Details of encumbrancesFile: Encumbrances - IF.pdf8 Aug 2017
Copy of Layout Approval (in case of layout)File: Layout copy.pdf8 Aug 2017
Building Plan Approval (IOD)File: Latest LOI 1.pdf8 Aug 2017
Building Plan Approval (IOD)File: Latest LOI 2.pdf8 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: scan copy of CC.pdf8 Aug 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAN RESIDENCES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NERUL7,600+ in Thane

2 kmMAN RESIDENCESCompleted 36Lapsed / revoked 14Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 94 registered projects within 2 km.

Builder: MERINO SHELTERS PRIVATE LIMITED

MERINO SHELTERS PRIVATE LIMITED has 3 registrations on MahaRERA, including MAN BUSINESS SPACES and MAN ITELLIPARK - IT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that MAN RESIDENCES shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MAN RESIDENCES is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAN RESIDENCES?

The registered promoter entity is MERINO SHELTERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAN RESIDENCES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAN RESIDENCES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAN RESIDENCES?

The professionals named in the filing: Architect: POSITRON ARCHITECTS; Architect: CHANDRASHEKHAR ARCHITECTS PVT LTD; Engineer: H M RAJE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAN RESIDENCES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAN RESIDENCES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAN RESIDENCES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.