Home / Browse projects / Pune, Maharashtra / Malhar Serenity

Registered Litigation declared Residential / Group Housing project

Malhar Serenity

By Malhar Developers AOP

RG-MH-36284 · RERA P52100053237 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 16 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 16 months from the original
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
12 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

Malhar Serenity is a Residential / Group Housing project by Malhar Developers AOP in Pune, Maharashtra, registered with MahaRERA as P52100053237 on 23 Oct 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 16 months from the original filing. 2 of the 14 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameMalhar Serenity
  • TypeResidential / Group Housing
  • Location
    • S.No 32/1A/2
    • Baner Pune
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053237
  • ReraGenie IDRG-MH-36284

Builder

  • NameMalhar Developers AOP
  • Entity typeOthers
  • PromotersMRS. VIJAYA DILIP CHAUDHARI chaudhari, MR. DILIP GANGARAM CHAUDHARI chaudhari, MR. RAHUL DILIP CHAUDHARI chaudhari
  • Authorised SignatoryMR. TEJAS DILIP CHAUDHARI chaudhari

Key dates

this monthRegisteredOct 2023First promiseAug 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed119 files

Current status

14%2 of 14 units booked
50.1%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Malhar SerenityNA8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

Malhar Serenity: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area522 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
Declared on19 Jan 2026
LandownerVillageDistrict
S.B ESTATE THROUGH S D BALTHROUGH RAHUL CHAUDHARYBanerPune

Approvals and building plan

Sanctioning authorityPune municipal corporation
Permissible FSI1719.95
Proposed, not sanctioned1,720 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT 265/2 BANER ROAD OPP BHARAT GAS PETROL PUMP, BANER
Estimated costRs 7.10 cr
Cost incurredRs 3.55 cr
Work done50.06%
BuildingWingEstimatedIncurred
Malhar SerenityNARs 6.60 crRs 3.36 cr
-NARs 50.00 lakhRs 19.11 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajendra Gaikwad
EngineerDipali Ravindra Bharam
EngineerRanjit Abhiman More
Chartered AccountantShriram Somwanshi
Chartered AccountantNikhita Gore
Chartered AccountantPravin Gavane
PartnerRole in project
Malhar Developers AOP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028239Aug 2025 → Dec 2026

Reason as filed by the promoterThe delay in the project’s timeline has been primarily due to unforeseen labour shortages and financial constraints. The shortage of skilled and unskilled labour, caused by challenges in recruitment and retention, has significantly slowed down the construction progress. Additionally, financial difficulties, including issues in securing adequate funding, rising material costs, and higher-than-expected interest rates on loans, have further impacted the project timeline. Despite these challenges, we are actively addressing the issues by streamlining operations, recruiting additional workers, and

Litigation declared2

CaseCourtStatus
-/2015-Ongoing
R.C.A./100006/2015/2015District and Session Court ,PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Main Layout (2).pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 New (1).pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2 New (1).pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 March 2026- Malhar serenity.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 2025-26.pdf18 Apr 2026
Form 2A (FY 2025-2026)File: Form 2 A 2025-26.pdf18 Apr 2026
Form 1File: Q3 25-26 Form 1.pdf18 Jan 2026
Form 2File: Q3 25-26 Form 2.pdf18 Jan 2026
Form 3File: Q3 25-26 Form 3.pdf18 Jan 2026
Disclosure of Sold and Booked InventoryFile: Q3 25 Sold Unsold Inventory.pdf18 Jan 2026
Form 1File: Form 1 Q2 25-26.pdf18 Oct 2025
Form 2File: Form 2 Q2 25-26.pdf18 Oct 2025
Form 3File: Form 3 Q2 25-26.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory Q2 25-26.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf30 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf30 Sep 2025
Form 2A (FY 2023-2024)File: malharserenity form2 24.pdf16 Sep 2025
Form 2A (FY 2024-2025)File: malhar serenity form2A.pdf16 Sep 2025
Form 1File: Architect Letter.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: Form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory.pdf28 Jul 2025
Form 1File: Architect Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: Form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory.pdf28 Jul 2025
Form 1File: Architect letter.pdf28 Jul 2025
Form 2File: Rera Engineer Certificate.pdf28 Jul 2025
Form 3File: Form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q1 2025-26.pdf21 Jul 2025
Form 1File: Form 1 Q1 2025-26.pdf21 Jul 2025
Form 2File: Form 2 Q1 2025-26.pdf21 Jul 2025
Form 3File: DocScanner 17-Jul-2025 08-07 PM.pdf21 Jul 2025
Form 1File: Form 1 Architect.pdf21 Jul 2025
Form 2File: Form 2 Engineer Certificate.pdf21 Jul 2025
Form 3File: Form 3 CA.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold inventory.pdf21 Jul 2025
Form 1File: Architect Letter.pdf21 Jul 2025
Form 2File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: 6 Disclosure of sold_ booked inventory.pdf21 Jul 2025
Form 3File: Form 3 Q3 of FY 2024-25 25-01-2024.pdf21 Jul 2025
Form 1File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf21 Jul 2025
Form 2File: Form 2 Engineer Certificate.pdf21 Jul 2025
Form 3File: Form 3 CA.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Inventory .pdf21 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance.pdf2 May 2025
Declaration in FORM BFile: Form B Notary (2).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm 2 Mar 2024 (1).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf19 Apr 2025
Declaration about Commencement CertificateFile: Declaration Commencement.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold inventory.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Oct Dec 24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Oct-Dec 24.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect OctDec24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory .pdf20 Jan 2025
Other - FinanceFile: Withdrawn declaration Oct Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf25 Oct 2024
Building plan approvalFile: Revised Sanction Plan.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate July- Sep.pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Revised.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Sanction Plan.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Inventory .pdf8 Oct 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf8 Oct 2024
Other - FinanceFile: No Withdrawl From Bank.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kaagaz_20240720_213631633629.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kaagaz_20240717_19225369224.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kaagaz_20240717_194247338535.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Kaagaz_20240717_192059527388.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Kaagaz_20240717_192003397952.pdf17 Jul 2024
Other - FinanceFile: Kaagaz_20240717_191903126621.pdf17 Jul 2024

How this compares with Pune

14%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 16 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Malhar Serenity on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner Pune13,700+ in Pune

2 kmMalhar SerenityCompleted 36Lapsed / revoked 16Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: Malhar Developers AOP

Malhar Developers AOP has 1 registration on MahaRERA, including Malhar Serenity. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Malhar Serenity is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Malhar Serenity?

The registered promoter entity is Malhar Developers AOP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Malhar Serenity?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Malhar Serenity?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Malhar Serenity?

The professionals named in the filing: Architect: Rajendra Gaikwad; Engineer: Dipali Ravindra Bharam; Engineer: Ranjit Abhiman More; Chartered Accountant: Shriram Somwanshi; Chartered Accountant: Nikhita Gore; Chartered Accountant: Pravin Gavane. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Malhar Serenity?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Malhar Serenity. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Malhar Serenity to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.