ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MALHAR RESIDENCY

Completed No litigation declared Residential / Group Housing project

MALHAR RESIDENCY

By RANJEET DEVELOPERS

RG-MH-08919 · RERA P52100003817 · Last updated on MahaRERA portal: 21 Jul 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 25 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2021Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

MALHAR RESIDENCY is a Residential / Group Housing project by RANJEET DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100003817 on 6 Aug 2017. The registration is recorded completed; possession was promised by 31 Jan 2021. The completion date has moved by 25 months from the original filing.

At a glance

Project

  • NameMALHAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Wadagaon (CT)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003817
  • ReraGenie IDRG-MH-08919

Builder

  • NameRANJEET DEVELOPERS
  • Entity typePartnership
  • PartnersKIRANSINGH ASHOKSINGH PARDESHI, CHANDRASHEKAR TUKARAM BHOSALE

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toJan 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion31 Jan 2021
  • Revised completionRevised to 31 Jan 2021 (originally 30 Dec 2018)
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Malhar ResidencyNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Malhar Residency: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Open Space7

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,880 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2891.77
Proposed, not sanctioned2,883 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDatta Nagari, Near Potoba Mandir, Vadgaon Maval, Tal Maval, Dist Pune -412106

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH CHANDRASHEKHAR MOHILE
EngineerRAJESH BALASAHEB NIGADE
PartnerRole in project
RANJEET DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001421Dec 2018 → Jul 2020

Reason as filed by the promoterWEATHER : WE STARTED PROJECT IN VADGAON MAVAL AREA . THIS AREA UNDER HEAVY RAIN . DUE TO THE HEAVY RAIN WE FACE MANY PROBLEMS . UNEXPECTED CHANGES ; AS PER CLIENT REQUEST, IN SOLD FLATS MADE VARIOUS INTERNAL CHANGES . SOMETIMES THE CLIENT SIMPLY CANNOT MAKE UP THEIR MINDS ON WHAT THEY WANT OR DOESN'T HAVE A GOOD IDEA OF WHERE THEY WANT THE PROJECT TO GO.

EXT52100005560Dec 2018 → Jul 2020

Reason as filed by the promoterAlmost 95% work is completed & final work will be completed 6 in month span. Delay of the project was due to some unavoidable environmental events due to the change of seasons throughout the year

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Oct 2020

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: SOCIETY REGISTRATION CERTIFICATE.pdf21 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: final OC Malhar Residency (1).pdf23 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA form 5 FY 1819.pdf29 Sep 2020
Architect’s Certificate on Completion of Project (Form 4)File: architect form 4.pdf29 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form I for Q3 19-20.pdf27 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Q4 2020.pdf27 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q3 fy 19-20_compressed.pdf27 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engeener Certificate q4 19-20_compressed.pdf27 Aug 2020
Certificates of CA (Form 3)File: CA Form-3 Q3 19-20_compressed.pdf27 Aug 2020
Certificates of CA (Form 3)File: CA Form-3 Q4 19-20_compressed.pdf27 Aug 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE.pdf24 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate 2A.pdf1 Jan 2020
Certificates of CA (Form 3)File: ca form -3 q- 2 fy 19-20.pdf1 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect Certificate.pdf30 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf30 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate JUNE 2019.pdf18 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificare june19.pdf18 Oct 2019
Certificates of CA (Form 3)File: CA certificate june 19_compressed.pdf18 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architct certificate fy 18-19 Q 4.pdf5 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate fy 18-19 Q4.pdf5 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate fy 18-19 Q4.pdf5 Sep 2019
Certificates of CA (Form 3)File: CA Certificate Q4 18-19 Ranjeet D_compressed.pdf5 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate fy1819 Q2.pdf4 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate FY 1819 Q3.pdf4 Feb 2019
Certificates of CA (Form 3)File: Q1.pdf4 Feb 2019
Certificates of CA (Form 3)File: Q2.pdf4 Feb 2019
Certificates of CA (Form 3)File: Q3.pdf4 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certifiate fy1819 Q1-.pdf30 Jan 2019
Certificates of CA (Form 5)File: Form-5.pdf15 Oct 2018
Certificates of CA (Form 5)File: Form-5.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-ilovepdf-compressed.pdf14 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate march 18.pdf14 Jul 2018
Certificates of CA (Form 3)File: CA Certificate Form-3-ilovepdf-compressed.pdf14 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect's certificate.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Mar 2018
Certificates of CA (Form 3)File: CA CERTIFICATE MARCH18.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate form 2 29092017.pdf29 Sep 2017
Certificates of CA (Form 3)File: CA Certificate form 3 29092017-.pdf29 Sep 2017
Certificates of CA (Form 3)File: CA FORM - 3.pdf26 Aug 2017
Layout approvalFile: Sanctioned Plans pdf.pdf30 Jul 2017
Layout approvalFile: Sanctioned Plans pdf.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanctioned Plans pdf.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanctioned Plans pdf.pdf30 Jul 2017
Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf30 Jul 2017
Building plan approvalFile: Sanctioned Plans pdf.pdf28 Jul 2017
Copy of the legal title reportFile: search and title report2017.pdf28 Jul 2017
Details of encumbrancesFile: Decleration form B-.pdf28 Jul 2017
Details of encumbrancesFile: search and title report2017.pdf28 Jul 2017
Building Plan Approval (IOD)File: Sanctioned Plans pdf.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1(2)compressed.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: Allotment Letter Proforma.pdf28 Jul 2017
Proforma of Allotment letterFile: agreemeant to sale.pdf28 Jul 2017
Proforma of Allotment letterFile: 7 12.pdf28 Jul 2017
Declaration in FORM BFile: Decleration form B-compressed.pdf26 Jul 2017
PAN CardFile: Ranjeet DEVELOPERS-PAN original.pdf15 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 25 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MALHAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadagaon (CT)13,700+ in Pune

2 kmMALHAR RESIDENCYCompleted 29Lapsed / revoked 13Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: RANJEET DEVELOPERS

RANJEET DEVELOPERS has 1 registration on MahaRERA, including MALHAR RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MALHAR RESIDENCY is delayed beyond 31 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MALHAR RESIDENCY?

The registered promoter entity is RANJEET DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MALHAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MALHAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MALHAR RESIDENCY?

The professionals named in the filing: Architect: GIRISH CHANDRASHEKHAR MOHILE; Engineer: RAJESH BALASAHEB NIGADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MALHAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MALHAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MALHAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.