Home / Browse projects / Solapur, Maharashtra / MALAPE PRIDE
MALAPE PRIDE
By BAGAL NARSALE AND MALAPE DEVELOPERS
RG-MH-21548 · RERA P52600029792 · Last updated on MahaRERA portal: 11 Dec 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 15 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MALAPE PRIDE is a Residential / Group Housing project by BAGAL NARSALE AND MALAPE DEVELOPERS in Solapur, Maharashtra, registered with MahaRERA as P52600029792 on 4 Jul 2021. The registration is recorded completed; possession was promised by 30 Jun 2024. The completion date has moved by 15 months from the original filing.
At a glance
Project
- NameMALAPE PRIDE
- TypeResidential / Group Housing
- Location
- PUNE PANDHARPUR ROAD
- ISBAVI
- Pandharpur
- Solapur
- 413304
- Pincode413304
- RERA no.P52600029792
- ReraGenie IDRG-MH-21548
Builder
- NameBAGAL NARSALE AND MALAPE DEVELOPERS
- Entity typePartnership
- PartnersNIKHIL HANMANT BAGAL, RUSHABH RAJENDRA NARSALE, VISHAL DAGADU MALAPE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Jul 2021
- Promised completion30 Jun 2024
- Revised completionRevised to 30 Jun 2024 (originally 3 Mar 2023)
- Buildings1 building record
- Documents filed61 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MALAPE PRIDE | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
MALAPE PRIDE: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed71
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KHAMITKAR AND ASSOCIATES |
| Engineer | NIKHIL HANMANT BAGAL |
| Chartered Accountant | A B BHALERAO & CO |
| Partner | Role in project |
|---|---|
| BAGAL NARSALE AND MALAPE DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRESPECTED SIR/MADAM, DUE TO PANDAMIC OF COVIDE-19 WE WERE UNABLE TO START AND COMPLETE OUR PROJECT IN TIME, THEREFORE WE ARE APPLYING HERE FOR EXTENTION OF DATE OF COMPLETION OF PROJECT UP TO 02/03/2024. SIR/MADAM, WE ASSURE YOU THAT WE WILL COMPLETE OUR PROJECT BEFORE THE EXPIRY OF EXTENDED DATE OF COMPLETION OF PROJECT. SO, WE REQUEST YOUR HONUR AGAIN, PLEASE ACCEPT OUR REQUEST AND EXTEND THE PROPOSED DATE OF COMPLETION OF PROJECT. THANKING YOU, YOURS FAITHFULLY.
Reason as filed by the promoterRESPECTED SIR, DUE TO SOME UNAVOIDABLE REASONE, WE REQUIRE AN ADDITIONAL TIME PERIOD UP TO 30/06/2024 TO COMPLETE THE PROJECT. CONSENT FORM THE SOLD UNITS WITH OTHER DOCUMENTS REQUIRED IS ATTACHED HERE.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jun 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Dec 2024
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 11 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC.pdf | 11 Dec 2024 |
| Declaration in FORM BFile: 8 FOMR B PROMOTOR.pdf | 25 Mar 2024 |
| Declaration in FORM BFile: 9 FOMR B CO PROMOTOR.pdf | 25 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DECLARATION ABOUT SOLD AND UNSOLD INVETORY UP TO 29 FEB 2024.pdf | 8 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021 22.pdf | 8 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022 23.pdf | 8 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022 23.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DECLARATION ABOUT SOLD AND UNSOLD INVETORY - UP TO 300623.pdf | 22 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 MARCH 23.pdf | 22 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 JUNE 23.pdf | 22 Aug 2023 |
| Declaration in FORM BFile: 8 FOMR B PROMOTOR.pdf | 20 Aug 2023 |
| Declaration in FORM BFile: 9 FOMR B COPROMOTOR.pdf | 20 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 MARCH 23.pdf | 20 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 JUNE 23.pdf | 20 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 01 01 22.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 01 04 22.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 01 07 22.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 01 10 22.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 01 01 23.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate April 2023 (1).pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate July 2023 (1).pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 01 10 21.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 10 2021.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 01 2022.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 04 2022.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 07 2022.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 10 2022.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 01 2023.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31 MARCH 23.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30 JUNE 23.pdf | 8 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Engineer 2223.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 SEP 2021.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 certificate 31 DEC 21.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 certificate 31 MARCH 22.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 JUNE 22.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 SEP 22.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 DEC 22.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 MARCH 23.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 JUNE 23.pdf | 8 Aug 2023 |
| Declaration about Commencement CertificateFile: 24 DECLARATION IN FORM D.pdf | 29 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 29 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: DECLARATION ABOUT SOLD AND UNSOLD INVENTORY 1.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf | 29 Mar 2023 |
| Proforma of Allotment letterFile: 20 Allotment letter and sample agreement of sales.pdf | 24 Jun 2021 |
| Proforma of Allotment letterFile: 26 ALLOTMENT LETTER FORMAT-1.pdf | 24 Jun 2021 |
| Proforma of Allotment letterFile: 16 Sample Agreement to Sale.pdf | 24 Jun 2021 |
| Declaration about Commencement CertificateFile: 25 FORM D ALONGWITH COMMENCEMENT CERTIFICATE.pdf | 21 Jun 2021 |
| PAN CardFile: 1 Pan Firm.pdf | 18 Jun 2021 |
| Copy of the legal title reportFile: 22 LEGAL REPORT IN FORM A.pdf | 18 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 14 Commencement Certificate and Building permission.pdf | 18 Jun 2021 |
| Layout approvalFile: 17 Sanction Layout Plan.pdf | 13 Jun 2021 |
| Building plan approvalFile: 13 sanction Building pLAN.pdf | 13 Jun 2021 |
| Details of encumbrancesFile: 8 Encumbrance Certificate.pdf | 13 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: 17 Sanction Layout Plan.pdf | 13 Jun 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 13 sanction Building pLAN.pdf | 13 Jun 2021 |
| Declaration in FORM BFile: 7 Form B CO Promoter.pdf | 13 Jun 2021 |
| Declaration in FORM BFile: 7 Form B Promote.pdf | 13 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 ARCHITECTS CERTIFICATE.pdf | 13 Jun 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineers Certificate.pdf | 13 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 CA CERTIFICATE.pdf | 13 Jun 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 61 filed documents as one ZIP, foldered, with a manifest
Keep MALAPE PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ISBAVI550+ in Solapur
CHHORIYA TOWNSHIP WAKHARI PANDHARPUR PHASE 3
Chhoriya Properties And Development Compan
Chhoriya Township Wakhari Pandharpur Phase 2
Chhoriya Properties And Development Compan
Chhoriya Residency - Pandharpur
Dhariwal And Chhoriya Developers LLP
CENTER-PRIDE
AMOL DATTATRAY NAGTILAK
Aarambha Residency
Aarambha Residency
TIRUPATI PURAM
TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELO
See every Solapur project, with the district possession charts
Builder: BAGAL NARSALE AND MALAPE DEVELOPERS
BAGAL NARSALE AND MALAPE DEVELOPERS has 1 registration on MahaRERA, including MALAPE PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if MALAPE PRIDE is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MALAPE PRIDE?
The registered promoter entity is BAGAL NARSALE AND MALAPE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MALAPE PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MALAPE PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MALAPE PRIDE?
The professionals named in the filing: Architect: KHAMITKAR AND ASSOCIATES; Engineer: NIKHIL HANMANT BAGAL; Chartered Accountant: A B BHALERAO & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MALAPE PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback