Registered No litigation declared Residential / Group Housing project

MALAD SUKH SADAN CHSL

By FERRO BUILD

RG-MH-86044 · RERA P51800049106 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
21 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

MALAD SUKH SADAN CHSL is a Residential / Group Housing project by FERRO BUILD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049106 on 30 Jan 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 7 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameMALAD SUKH SADAN CHSL
  • TypeResidential / Group Housing
  • Location
    • Nadiadwala Colony Road No-1
    • MALAD WEST
    • Pahadi-Goregaon
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • RERA no.P51800049106
  • ReraGenie IDRG-MH-86044

Builder

  • NameFERRO BUILD
  • Entity typePartnership
  • PartnersMILAN ARVIND MEHTA, KEYUR DINKARRAI MEHTA
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed76 files

Current status

25%7 of 28 units booked
96.3%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MALAD SUKH SADAN CHSLNA8428028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

MALAD SUKH SADAN CHSL: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area636 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
FERRO BUILDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1718.06
Proposed, not sanctioned834 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS V ROAD VILE PARLE WEST
Estimated costRs 5.74 cr
Cost incurredRs 5.53 cr
Work done96.26%
BuildingWingEstimatedIncurred
MALAD SUKH SADAN CHSLNARs 4.02 crRs 3.87 cr
-NARs 1.72 crRs 1.66 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectkulin Patrawala
EngineerHiren Tanna
Chartered AccountantMr Nimish Gami
PartnerRole in project
FERRO BUILD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29122519100Dec 2025 → Dec 2026

Reason as filed by the promoterThe construction activity of Malad Sukh Sadan CHSL was started in the month of November 2022. On excavation of the soil we found that the soil strata is very uneven and so Our Structural Engineer advise us either go for piling work or excavate the soil till you find the Solid hard strata which can bear the load of the super structure. In such case we had no other alternative but to go far more deeper in the soil up to the depth of 18 to 20 feet. As a result of it the entire column casting process below ground floor was carried out in two stage. As a result of all the above difficulties, it too

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: M S S Architect Certi in Form 1 Jan to March 2026 for RERA334.pdf7 May 2026
Withdrawal Update Form 1File: M S S Architect Certi in Form 1 Jan to March 2026 for RERA334.pdf7 May 2026
Withdrawal Update Form 1File: M S S Architect Certi in Form 1 Jan to March 2026 for RERA334.pdf7 May 2026
Withdrawal Update Form 2File: M S S Engineer Certi in Form 2 Jan to March 2026 for RERA335.pdf7 May 2026
Withdrawal Update Form 2File: M S S Engineer Certi in Form 2 Jan to March 2026 for RERA335.pdf7 May 2026
Withdrawal Update Form 2File: M S S Engineer Certi in Form 2 Jan to March 2026 for RERA335.pdf7 May 2026
Withdrawal Update Form 3File: M S S C A Certi in Form 3 Jan to March 2026 for RERA333_compressed.pdf7 May 2026
Withdrawal Update Form 3File: M S S C A Certi in Form 3 Jan to March 2026 for RERA333_compressed.pdf7 May 2026
Withdrawal Update Form 3File: M S S C A Certi in Form 3 Jan to March 2026 for RERA333_compressed.pdf7 May 2026
Withdrawal Update Form 1File: MSS Arch Certi Form 1 Oct -Dec 2025320.pdf4 Feb 2026
Withdrawal Update Form 1File: MSS Arch Certi Form 1 Oct -Dec 2025320.pdf4 Feb 2026
Withdrawal Update Form 1File: MSS Arch Certi Form 1 Oct -Dec 2025320.pdf4 Feb 2026
Withdrawal Update Form 2File: MSS Engineer Certi Form 2 Oct -Dec 2025321.pdf4 Feb 2026
Withdrawal Update Form 2File: MSS Engineer Certi Form 2 Oct -Dec 2025321.pdf4 Feb 2026
Withdrawal Update Form 2File: MSS Engineer Certi Form 2 Oct -Dec 2025321.pdf4 Feb 2026
Withdrawal Update Form 3File: MSS C A Certi Form 3 Oct -Dec 2025322_compressed (1).pdf4 Feb 2026
Withdrawal Update Form 3File: MSS C A Certi Form 3 Oct -Dec 2025322_compressed (1).pdf4 Feb 2026
Withdrawal Update Form 3File: MSS C A Certi Form 3 Oct -Dec 2025322_compressed (1).pdf4 Feb 2026
Withdrawal Update Form 1File: MSS Architect Form No 1 JULY TO SEPTEMBER 25.pdf18 Dec 2025
Withdrawal Update Form 2File: MSS Engineer Form No 2 JULY TO SEPTEMBER 25.pdf18 Dec 2025
Withdrawal Update Form 3File: MSS CA Certificate in Form No 3 JULY TO SEPTEMBER 2025compressed.pdf18 Dec 2025
Form 2A (FY 2024-2025)File: MSS Engineer's Form No 2 A Annual Certificate 2025306.pdf17 Nov 2025
Form 5 (FY 2024-2025)File: MSS CA FORM NO 5 for FY 2024- 2025.pdf12 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS RERA Architect Certificate on Form -1 Jan to March 2025251.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA CA's Certificate on Form -3 Jan to March 2025253_compressed.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS RERA Engineer's Certificate on Form -2 Jan to March 2025252.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: MSS RERA INVENTORY AS ON 31ST MARCH 2025250.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS Architect Certi form 1 for OCT TO DEC 2024240.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA C A Certi on Form No 3 for OCT DEC 2024244_compressed.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS Engineer's Certi form 2 for OCT TO DEC 2024242.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: MSS RERA Sold Flat Inventary for OCT DEC 2024245.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS, C A Form No3 for JULY TO SEPTEMBER 2024233_compressed.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS RERA Archi Certi Form No 1 JULY TO SEPTEMBER 2024230.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS RERA Engineer Certi Form No 2 JULY TO SEPTEMBER 2024231.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: MSS RERA , SOLD INVENTORY, JULY TO SEPTEMBER 2024232.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RRD RERA Form No 5 2023 - 2024228.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MSS RERA Form No 5 2023 - 2024229.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS C A Certificate Form-3 APRIL TO JUNE 2024222_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS Architect Certificate APRIL TO JUNE 2024215.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS Engineer's Certificate APRIL TO JUNE 2024216.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: MSS Sold Flat Inventory APRIL TO JUNE 2024220.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS RERA Architect Certificate Form No 1204.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS RERA Engineer's Certificate Form No 2205.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA C A s Certificate Form No 3207_compressed.pdf16 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MSS RERA Form 5 199.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS RERA Archi Certi Form 1 for Oct - Dec 2023194.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS RERA Engineer's Certi Form 2 for Oct - Dec 2023195.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA C A's Certi Form 3 for Oct - Dec 2023193_compressed.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA C A Form No 3 for JULY TO SEPTEMBER 2023185_compressed.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA C A's Certificate Form 3 APRIL- JUNE 2023169_compressed.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS RERA Architect's Certi APRIL- JUNE 2023166.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS RERA Engineer's Certi APRIL- JUNE 2023165.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA C A's Certificate Jan -March 2023159_compressed.pdf1 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSS RERA Architect Certificate Jan -March 2023157.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSS RERA Engineer's Certificate Jan -March 2023158.pdf29 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSS RERA CA Certificate Form No 3 for CA Parag Shah147_rotated (1).pdf19 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf13 Jan 2023
Proforma of Agreement for saleFile: Draft of Agreement for sale.pdf13 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf13 Jan 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF ALLOTMENT.pdf13 Jan 2023
Deviation Report with respect to model copy of AgreementFile: MSS RERA Deviation in Agreement for CA Parag Shah146_rotated (1).pdf13 Jan 2023
Building plan approvalFile: IOD.pdf3 Jan 2023
Layout approvalFile: PLANS.pdf3 Jan 2023
PAN CardFile: PAN Card.pdf3 Jan 2023
Copy of the legal title reportFile: TITLE REPORT.pdf3 Jan 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE.pdf3 Jan 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE.pdf3 Jan 2023
Copy of Layout Approval (in case of layout)File: PLANS.pdf3 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf3 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Jan 2023
Declaration about Commencement CertificateFile: CC DECLARATION.pdf3 Jan 2023
Declaration in FORM BFile: Declaration in Form B (1).pdf3 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Jan 2023
CERSAI detailsFile: CERSAI DECALARTION.pdf3 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER (1).pdf3 Jan 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAJ NIRMAN CHSLRamchandra cross lane Malad West Mumbai 40006418CompletedJun 2018Apr 2018

How this compares with Mumbai Suburban

25%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MALAD SUKH SADAN CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

Builder: FERRO BUILD

FERRO BUILD has 4 registrations on MahaRERA, including Raj Nirman and RAM RAMESHWAR DARSHAN CHSL. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MALAD SUKH SADAN CHSL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MALAD SUKH SADAN CHSL?

The registered promoter entity is FERRO BUILD, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MALAD SUKH SADAN CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MALAD SUKH SADAN CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MALAD SUKH SADAN CHSL?

The professionals named in the filing: Architect: kulin Patrawala; Engineer: Hiren Tanna; Chartered Accountant: Mr Nimish Gami. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MALAD SUKH SADAN CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MALAD SUKH SADAN CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MALAD SUKH SADAN CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.