ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MAJESTIQUE SIGNATURE TOWERS C5

Completed No litigation declared Residential / Group Housing project

MAJESTIQUE SIGNATURE TOWERS C5

By M/s. Samarth Builders

RG-MH-77669 · RERA P52100035139 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1 of 73Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

MAJESTIQUE SIGNATURE TOWERS C5 is a Residential / Group Housing project by M/s. Samarth Builders in Pune, Maharashtra, registered with MahaRERA as P52100035139 on 10 May 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. 72 of the 73 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameMAJESTIQUE SIGNATURE TOWERS C5
  • TypeResidential / Group Housing
  • Location
    • Balewadi
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100035139
  • ReraGenie IDRG-MH-77669

Builder

  • NameM/s. Samarth Builders
  • Entity typePartnership
  • PartnerSANJAY JAGANNATH PATIL
  • Other registrations5 more →
  • Completed3 of 6
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2022PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

99%72 of 73 units booked

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAJESTIQUE SIGNATURE TOWERS C5NA231973073

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

MAJESTIQUE SIGNATURE TOWERS C5: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,608 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jun 2026
LandownerVillageDistrict
MAJESTIQUE HOMES LLPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI7129.55
Proposed, not sanctioned7,130 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE SATARA ROAD PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJay Aeram
EngineerNagnath
EngineerPrakash
Chartered AccountantSanket
PartnerRole in project
M/s. Samarth Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: ST-C5.pdf2 Jun 2026
Form 3File: C5-31032026.pdf2 Jun 2026
Form 1File: C5 FORM 1 UPDATE 22.pdf2 Jun 2026
Form 2File: C5 FORM 1 UPDATE 22.pdf2 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A -1.pdf11 May 2026
Form 2A (FY 2023-2024)File: Form 2A -2.pdf11 May 2026
Form 2A (FY 2024-2025)File: Form 2A -3.pdf11 May 2026
Form 2A (FY 2025-2026)File: Form 2A -4.pdf11 May 2026
Occupational CertificateFile: C5 COMPLETION.pdf16 Mar 2026
Form 1File: C5 FORM 1 UPDATE 21.pdf18 Feb 2026
Form 2File: C5 FORM 2 UPDATE 21.pdf18 Feb 2026
Form 3File: C5 FORM 3 UPDATE 21.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: C5 SOLD UNSOLD.pdf18 Feb 2026
Form 1File: C5 FORM 1 Q1 25-26.pdf4 Nov 2025
Form 2File: C5 FORM 2 Q1 25-26.pdf4 Nov 2025
Form 3File: C5 FORM 3 Q1 25-26_compressed.pdf4 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold S T - C5-June 2025.pdf4 Nov 2025
Form 1File: C5 FORM 1 Q2 25-26.pdf4 Nov 2025
Form 2File: C5 FORM 2 Q2 25-26.pdf4 Nov 2025
Form 3File: C5 FORM 3 Q2 25-26.pdf4 Nov 2025
Disclosure of Sold and Booked InventoryFile: ST-C5.pdf4 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1 UPDATE 16.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C5 _compressed.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2 UPDATE 16.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1 UPDATE 16.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2 UPDATE 16.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: C5.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: C5- ST.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-C5_compressed.pdf11 Mar 2025
Disclosure of sold/ booked inventoryFile: ST - C5.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samarth C5 .pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samarth C5-.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 UPDATE 15.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 UPDATE 15.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: C5- sold unsold.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf25 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser Sanjay Patil.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: C5.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C5-CA CERTIFICATE.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1 UPDATE 2.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 FORM 1.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2 UPDATE 2.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 1.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C5 FORM 2 UPDATE 10.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: C5 FORM 2.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A C5 23 24.pdf4 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C5 Form V.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: C5 21 22.pdf9 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: C5 22 23.pdf9 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3 - C5_compressed.pdf20 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Smarth Builders - Form -3 - C5.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -C5.pdf23 Jan 2023
Copy of the legal title reportFile: STR Balewadi.pdf6 May 2022
Layout approvalFile: 1 LAYOUT--11.pdf5 May 2022
Copy of Layout Approval (in case of layout)File: 1 LAYOUT--11.pdf5 May 2022
Building plan approvalFile: C5-1.pdf2 May 2022
Building plan approvalFile: C5-2.pdf2 May 2022
Building Plan Approval / NA Order for plotted developmentFile: C5-1.pdf2 May 2022
Building Plan Approval / NA Order for plotted developmentFile: C5-2.pdf2 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf2 May 2022
Declaration about Commencement CertificateFile: Declaration cc.pdf27 Apr 2022
Proforma of Allotment letterFile: Samarth Unit Agreement_For all C Bldg_PMC_compressed.pdf27 Apr 2022
PAN CardFile: 1 PAN Card.pdf22 Apr 2022

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAJESTIQUE SIGNATURE TOWERS C5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALEWADI13,700+ in Pune

2 kmMAJESTIQUE SIGNATURE TOWCompleted 130Lapsed / revoked 53Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 310 registered projects within 2 km.

Builder: M/s. Samarth Builders

M/s. Samarth Builders has 6 registrations on MahaRERA, including MAJESTIQUE SIGNATURE TOWERS C2 and MAJESTIQUE SIGNATURE TOWERS C1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MAJESTIQUE SIGNATURE TOWERS C5 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAJESTIQUE SIGNATURE TOWERS C5?

The registered promoter entity is M/s. Samarth Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAJESTIQUE SIGNATURE TOWERS C5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAJESTIQUE SIGNATURE TOWERS C5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAJESTIQUE SIGNATURE TOWERS C5?

The professionals named in the filing: Architect: Jay Aeram; Engineer: Nagnath; Engineer: Prakash; Chartered Accountant: Sanket. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAJESTIQUE SIGNATURE TOWERS C5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAJESTIQUE SIGNATURE TOWERS C5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAJESTIQUE SIGNATURE TOWERS C5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.