MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6
RG-MH-05641 · RERA P52100076891 · Last updated on MahaRERA portal: 23 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6 is a Residential / Group Housing project by MAJESTIQUE HOMES LLP in Pune, Maharashtra, registered with MahaRERA as P52100076891 on 3 Jul 2024. Possession is promised by 31 Dec 2028. 99 of the 187 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameMAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6
- TypeResidential / Group Housing
- Location
- BALEWADI
- Haveli
- Pune
- 411045
- Pincode411045
- RERA no.P52100076891
- ReraGenie IDRG-MH-05641
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jul 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 23 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6 | NA | 23 | 19 | 187 | 0 | 187 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 35%.
MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed100
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership74
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Samarth Builders | Pune (M Corp.) | Pune |
| Dashrath Kondiba Balwadkar | Pune (M Corp.) | Pune |
| Prakash Dashrath Balwadkar | Pune (M Corp.) | Pune |
| Vilas Dashrath Balwadkar | Pune (M Corp.) | Pune |
| Kalidas Dashrath Balwadkar | Pune (M Corp.) | Pune |
| Sukhdev Gorakhnath Balwadkar | Pune (M Corp.) | Pune |
| Babubai Gorakhnath Balwadkar | Pune (M Corp.) | Pune |
| Pandit Hari Patil | Pune (M Corp.) | Pune |
| Lilawati Sadashiv Jadhav | Pune (M Corp.) | Pune |
| Sharadini Hambirrao Mohite | Pune (M Corp.) | Pune |
| Anuradha Hambirrao Mohite | Pune (M Corp.) | Pune |
| Jagadishchandra Hambirrao Mohite | Pune (M Corp.) | Pune |
| Rajashree Ravindranath Jadhav | Pune (M Corp.) | Pune |
| Dilip Pandurang Bhapkar | Pune (M Corp.) | Pune |
| Sudhir Rangrao Patil | Pimpri Chinchawad (M Corp.) | Pune |
| Shobha Pandurang Patil | Pune (M Corp.) | Pune |
| Padmadevi Raosaheb Nagawade | Pune (M Corp.) | Pune |
| Bhalchandra Pandurang Bhapkar | Pune (M Corp.) | Pune |
| Arun Pandurang Bhapkar | Pune (M Corp.) | Pune |
| Vidhyadhar Pandurang Bhapkar | Pune (M Corp.) | Pune |
| Dilip Pandurang Bhapkar 1 | Pune (M Corp.) | Pune |
| Shailaja Prashant Thorat | Pune (M Corp.) | Pune |
| Amar Agatrao Patil | Pune (M Corp.) | Pune |
| Shalini Balkrishna More | Pune (M Corp.) | Pune |
| Ranjit Balkrishna More | Pune (M Corp.) | Pune |
| Jayshree Dinkarrao Sawant | Pune (M Corp.) | Pune |
| Amarjit Balkrishna More | Pune (M Corp.) | Pune |
| Popat Balwadkar | Balewadi | Pune |
| Ranjana Balwadkar | Balewadi | Pune |
| Dipali Balwadkar | Balewadi | Pune |
| Shilpa P. Balwadkar | Balewadi | Pune |
| Swapnil Balwadkar | Balewadi | Pune |
| Rajendra Balwadkar | Balewadi | Pune |
| Sujata R. Balwadkar | Balewadi | Pune |
| Snehal R. Balwadkar | Balewadi | Pune |
| Sakshi R. Balwadkar | Balewadi | Pune |
| Sarthak R. Balwadkar | Balewadi | Pune |
| Bajirao M. Balwadkar | Balewadi | Pune |
| Kalyani B. Balwadkar | Balewadi | Pune |
| Shardul B. Balwadkar | Balewadi | Pune |
| Shlok B. Balwadkar | Balewadi | Pune |
| Shalan B. Bhintade | Balewadi | Pune |
| Bhimashankar P Tuse | Balewadi | Pune |
| Sakharam L Lad | Balewadi | Pune |
| Suresh V Deshpande | Balewadi | Pune |
| Balasaheb S Shitole | Balewadi | Pune |
| Sudha D Deshpande | Balewadi | Pune |
| Sunil S Pathak | Balewadi | Pune |
| Bhalchandra R Desai | Balewadi | Pune |
| Rajaram L Lad | Balewadi | Pune |
| Shivaji N Gohil | Balewadi | Pune |
| Sushila V Mane | Balewadi | Pune |
| Kashinath L Mane | Balewadi | Pune |
| Ajit B. More | Pune (M Corp.) | Pune |
| Tejraj Promoters and Builders | Pune (M Corp.) | Pune |
| Vasant Kautik Patil | Warje | Pune |
| Sunanda Vinayakrao Sawant | SATANA | Nashik |
| Lt. Nalini Suresh Salunke Through Suresh S Salunke | Mumbai City | Mumbai City |
| Lt Nalini S Salunke through Vivek S Salunke | Mumbai City | Mumbai City |
| Lt Nalini S Salunke through Praveen S Salunke | Mumbai City | Mumbai City |
| Pooja Popatrao Balwadkar | Balewadi | Pune |
| Hiraman Govind Balwadkar | Balewadi | Pune |
| Raghunath Govind Balwadkar | Balewadi | Pune |
| Subhash Govind Balwadkar | Balewadi | Pune |
| Vijay Govind Balwadkar | Balewadi | Pune |
| Bajirao Govind Balwadkar | Balewadi | Pune |
| Sudam Govind Balwadkr | Balewadi | Pune |
| Manesh Suresh Balwadkar | Balewadi | Pune |
| Baban Gulab Gulunjkar | Pune (M Corp.) | Pune |
| Arun Gulab Gulunjkar | Pune (M Corp.) | Pune |
| Babibai Nivrutti Shewale | Pune (M Corp.) | Pune |
| Baban Nivrutti Sonawane | Pune (M Corp.) | Pune |
| Ram Nivrutti Sonawane | Pune (M Corp.) | Pune |
| Balu Nivrutti Sonawane | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAY |
| Engineer | Prakash Khandagale |
| Chartered Accountant | Vinod Kumar Jindal |
| Chartered Accountant | Sanket |
| Partner | Role in project |
|---|---|
| MAJESTIQUE HOMES LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 75/2021 | Honble CJSD Pune at Pune | Pending before Honble Court |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: B6 FORM 1.pdf | 23 Apr 2026 |
| Form 2File: B6 FORM 2.pdf | 23 Apr 2026 |
| Form 3File: Homes LLPFORM 3 B6 Q4_compressed.pdf | 23 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: B6 SOLD UNSOLD.pdf | 23 Apr 2026 |
| Form 1File: FORM 1 B6.pdf | 18 Feb 2026 |
| Form 2File: B6 FORM 2.pdf | 18 Feb 2026 |
| Form 3File: FORM 3 B6.pdf | 18 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: B6 SOLD UNSOLD.pdf | 18 Feb 2026 |
| Form 5 (FY 2024-2025)File: Majestique Homes LLP B6 FORM 5.pdf | 10 Dec 2025 |
| Form 1File: B6 FORM 1 Q1 25-26.pdf | 4 Nov 2025 |
| Form 2File: B6 FORM 2 Q1 25-26.pdf | 4 Nov 2025 |
| Form 3File: B6 FORM 3 Q1 25-26_compressed.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: S T - B6-June 2025.pdf | 4 Nov 2025 |
| Form 1File: B6 FORM 1 Q2 25-26.pdf | 4 Nov 2025 |
| Form 2File: B6 FORM 2 Q2 25-26.pdf | 4 Nov 2025 |
| Form 3File: B6 FORM 3 Q2 25-26.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: ST-B6.pdf | 4 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B6 FORM 1-Q4-24-25_compressed.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B6 FORM 1 UPDATE 4.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B6 FORM 2 UPDATE 4.pdf | 28 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A WING B6 24-25.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: B6 - mar 25_compressed.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: B6- ST_compressed.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - B6_compressed.pdf | 18 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B6 FORM 2 UPDATE 3 - REVISED.pdf | 12 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B6 FORM 1 UPDATE 3.pdf | 11 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B6 FORM 2 UPDATE 3.pdf | 11 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Majestique Homes - Q2 - B6 compressed.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B6 FORM 1 UPDATE 2.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B6 FORM 2 UPDATE 2.pdf | 9 Dec 2024 |
| Other - LegalFile: 2 Sukhdeo_compressed.pdf | 26 Jun 2024 |
| Other - LegalFile: 1 Dave Declaration Unit.pdf | 26 Jun 2024 |
| Other - LegalFile: 3 Bhapkar_compressed.pdf | 26 Jun 2024 |
| Other - LegalFile: 4 Popat shaku_compressed.pdf | 26 Jun 2024 |
| Other - LegalFile: 5 Vilas Mama_compressed.pdf | 26 Jun 2024 |
| Other - LegalFile: 5 Vilas Mama1_compressed.pdf | 26 Jun 2024 |
| Other - LegalFile: 1 7069_compressed.pdf | 25 Jun 2024 |
| Other - LegalFile: 2 7069_compressed.pdf | 25 Jun 2024 |
| Other - LegalFile: 3 7069_compressed.pdf | 25 Jun 2024 |
| Other - LegalFile: CD-I_compressed.pdf | 18 Jun 2024 |
| Other - LegalFile: CD-II_compressed.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3.pdf | 17 Jun 2024 |
| Other - LegalFile: Revised Supplementry Deed _Majestique Homes LLP 19-09-2020_compressed.pdf | 17 Jun 2024 |
| Other - LegalFile: SAMARTH PARTNERSHIP DEED (NEW)_2019.pdf | 10 Jun 2024 |
| Other - LegalFile: Declaration SB Name on CC.pdf | 10 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: NO Encumbrances letter B6_Updated.pdf | 3 Jun 2024 |
| Details of encumbrances concerned to LegalFile: NO Encumbrances letter B6_Updated.pdf | 3 Jun 2024 |
| Other - TechnicalFile: Order No50 Declaration Annexure A.pdf | 3 Jun 2024 |
| Declaration about Commencement CertificateFile: Format D CC.pdf | 14 May 2024 |
| Proforma of Agreement for saleFile: Agreement_Draft_Residential_Signature B6_For RERA.pdf | 14 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Tabular_Agreement_Signature B6 Updated.pdf | 14 May 2024 |
| Other - FinanceFile: Declaration Flat allotment.pdf | 14 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 13 May 2024 |
| Copy of the legal title reportFile: STR 3 updated_compressed.pdf | 11 May 2024 |
| Copy of the legal title reportFile: STRII.pdf | 11 May 2024 |
| Declaration in FORM BFile: Form B MHLLP Promoter.pdf | 9 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser MD.pdf | 8 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B6 FORM 1.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B6 FORM 2.pdf | 7 May 2024 |
| Details of encumbrances concerned to FinanceFile: NO Encumbrances B6_Updated.pdf | 3 May 2024 |
| Details of encumbrances concerned to LegalFile: NO Encumbrances B6_Updated.pdf | 3 May 2024 |
| CERSAI detailsFile: cersai_declaration Signature B6_Updated.pdf | 3 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser Aditya.pdf | 3 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser RM.pdf | 3 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dicloser N Mundra.pdf | 3 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser M Mundra.pdf | 3 May 2024 |
| Proforma of Allotment letterFile: Allotment Letter_Signature B6_Updated.pdf | 3 May 2024 |
| Deviation Report with respect to Allotment letterFile: No deviation Allotment.pdf | 3 May 2024 |
| PAN CardFile: 1 PAN Card (2).pdf | 22 Apr 2024 |
| Building plan approvalFile: B6_1.pdf | 8 Apr 2024 |
| Building plan approvalFile: B6_2.pdf | 8 Apr 2024 |
| Building plan approvalFile: B6-3.pdf | 8 Apr 2024 |
| Layout approvalFile: LAYOUT AS PER FORMAT-cropped_Compressed.pdf | 8 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT AS PER FORMAT-cropped_Compressed.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B6_1.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B6_2.pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B6-3.pdf | 8 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 8 Apr 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| - | - | 1 | Completed | Dec 2020 | Dec 2020 |
| - | - | - | Completed | Dec 2020 | Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BALEWADI13,700+ in Pune
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: MAJESTIQUE HOMES LLP
MAJESTIQUE HOMES LLP has 9 registrations on MahaRERA, including MAJESTIQUE SIGNATURE TOWERS PHASE 1 and MAJESTIQUE SIGNATURE TOWERS PHASE 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6?
The registered promoter entity is MAJESTIQUE HOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6?
The professionals named in the filing: Architect: JAY; Engineer: Prakash Khandagale; Chartered Accountant: Vinod Kumar Jindal; Chartered Accountant: Sanket. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.