ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Majestique Rhythm County Phase I

Completed No litigation declared Residential / Group Housing project

Majestique Rhythm County Phase I

By MAJESTIQUE RISINGSUN LLP

RG-MH-61208 · RERA P52100019616 · Last updated on MahaRERA portal: 17 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Majestique Rhythm County Phase I is a Residential / Group Housing project by MAJESTIQUE RISINGSUN LLP in Pune, Maharashtra, registered with MahaRERA as P52100019616 on 14 Feb 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameMajestique Rhythm County Phase I
  • TypeResidential / Group Housing
  • Location
    • Autade Handewadi
    • OUATADE HANDEWADI
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019616
  • ReraGenie IDRG-MH-61208

Builder

  • NameMAJESTIQUE RISINGSUN LLP
  • Entity typePartnership
  • PartnersMR ANKIT DINESH CHHAJED, MR KUSHALRAJ PREMRAJ KATARIYA, BHERUSINGH NARAYANSINGH RAJPUROHIT, SUSHILKUMAR MITHALAL JAIN, MR GANESH BHIKULALJI SARDA
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Feb 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A3NA180000
A4NA180000
A1NA180000
A2NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 17 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

A391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed352

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots352
Closed/Covered352
BuildingClosed/CoveredTotal
A38888
A48888
A18888
A28888

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI54368.0
Proposed, not sanctioned11,886 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSwargate Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABS Architects and Associates
EngineerG A Bhilare
PartnerRole in project
MAJESTIQUE RISINGSUN LLP-

Litigation declared4

CaseCourtStatus
530/2016Honble A S PansareNo order has been passed by court after the rejection of Exh five application of the Plaintiff
406/2018Honble District and Session CourtAwaiting Notice
08/2021Commercial CourtCase Disposed off Compromised
7187/2022Honble Supreme Court of IndiaPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Nov 2023

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 Majestique Risingsun LLP Phase 1.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MRC Form-5 Phase-I.pdf12 Mar 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: MRC Society Registration Certificate A1-A2.pdf12 Mar 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: MRC Society Registration Certificate A3-A4.pdf12 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A3 A4 completion.pdf7 Nov 2023
Architect’s Certificate on Completion of Project (Form 4)File: A3 A4_page-0001.pdf7 Nov 2023
Architect’s Certificate on Completion of Project (Form 4)File: A1A2.pdf7 Nov 2023
Certificates of CA (Form 3)File: FORM 3 - RISINGSUN-PHASE-I.pdf23 Jan 2023
Certificates of CA (Form 3)File: FORM 3 - RISINGSUN-PHASE-I.pdf23 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: A3 A4_page-0001.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Majestique Risingsun LLP Form-5 Phase I.pdf30 Nov 2022
Details of encumbrances concerned to LegalFile: encumbrances.pdf5 Jul 2022
CERSAI detailsFile: CERSAI_MRC.pdf5 Jul 2022
Disclosure of sold/ booked inventoryFile: Rhythm A1 (2)_compressed.pdf18 Jun 2022
Disclosure of sold/ booked inventoryFile: Rhythm A2 (2)_compressed.pdf18 Jun 2022
Disclosure of sold/ booked inventoryFile: Rhythm A3 (2)_compressed.pdf18 Jun 2022
Disclosure of sold/ booked inventoryFile: Rhythm A4 (2)_compressed.pdf18 Jun 2022
CERSAI detailsFile: RERA.pdf18 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Majestique Risingsun LLP - Phase-I_compressed.pdf18 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A1 A2 COMPLETION.pdf18 Jun 2022
Building plan approvalFile: A1 1_compressed.pdf8 Nov 2021
Building plan approvalFile: A1 2_compressed.pdf8 Nov 2021
Building plan approvalFile: A1 3_compressed.pdf8 Nov 2021
Building plan approvalFile: A2 1_compressed.pdf8 Nov 2021
Building plan approvalFile: A2 2_compressed.pdf8 Nov 2021
Building plan approvalFile: A2 3_compressed.pdf8 Nov 2021
Building plan approvalFile: A3_compressed.pdf8 Nov 2021
Building plan approvalFile: A3 2_compressed.pdf8 Nov 2021
Building plan approvalFile: A3 3_compressed.pdf8 Nov 2021
Building plan approvalFile: A4 2_compressed.pdf8 Nov 2021
Building plan approvalFile: A4 3_compressed.pdf8 Nov 2021
Building plan approvalFile: A4 4_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A1 1_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A1 2_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A1 3_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A2 1_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A2 2_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A2 3_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A3_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A3 2_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A3 3_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A4 2_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A4 3_compressed.pdf8 Nov 2021
Building Plan Approval (IOD)File: A4 4_compressed.pdf8 Nov 2021
Declaration about Commencement CertificateFile: MRC Ph I.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Majestique Risingsun LLP - A1, A2, A3 and A4.pdf24 Jun 2021
Details of encumbrancesFile: Encumbrances_Handewadi_new.pdf5 May 2021
Details of encumbrancesFile: Encumbrance.pdf9 Sep 2020
Details of encumbrancesFile: encumbrance.pdf28 Aug 2020
Proforma of Allotment letterFile: Agreement 2020.pdf26 Aug 2020
Copy of the legal title reportFile: 2020.pdf24 Aug 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf20 Jan 2020
PAN CardFile: Majestique Risingsun LLP PAN.pdf1 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect.pdf27 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate A1A2A3A4.pdf13 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Residential CC.pdf11 Jul 2019
Layout approvalFile: Rhythm Layout 1.pdf9 Jul 2019
Copy of Layout Approval (in case of layout)File: Rhythm Layout 1.pdf9 Jul 2019
Proforma of Allotment letterFile: Rhythm County Phase I Residential .pdf9 Jul 2019
Form 2AFile: form 2A.pdf10 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 May 2019
Commencement Certificates / NA Order for plotted developmentFile: RHYTHM COUNTY RESIDENTIAL CC (COMP).pdf18 Apr 2019
Declaration in FORM BFile: Form B.pdf1 Feb 2019
Proforma of Allotment letterFile: unit agreement.pdf1 Feb 2019
Layout approvalFile: Layout01.pdf31 Jan 2019
Building plan approvalFile: A1A2 Plan.pdf31 Jan 2019
Copy of the legal title reportFile: handewadi (1).pdf31 Jan 2019
Details of encumbrancesFile: Encumbrance .pdf31 Jan 2019
Copy of Layout Approval (in case of layout)File: Layout01.pdf31 Jan 2019
Building Plan Approval (IOD)File: A1A2 Plan.pdf31 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: CC01.pdf31 Jan 2019
Certificates of CA (Form 3)File: FORM 3.pdf31 Jan 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
--CompletedDec 2020Dec 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Majestique Rhythm County Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Autade Handewadi13,700+ in Pune

2 kmMajestique Rhythm CountyCompleted 162Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: MAJESTIQUE RISINGSUN LLP

MAJESTIQUE RISINGSUN LLP has 6 registrations on MahaRERA, including Majestique Rhythm County Commercial Building Phase - I and Majestique Rhythm County Phase I. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Majestique Rhythm County Phase I is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Majestique Rhythm County Phase I?

The registered promoter entity is MAJESTIQUE RISINGSUN LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Majestique Rhythm County Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Majestique Rhythm County Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Majestique Rhythm County Phase I?

The professionals named in the filing: Architect: ABS Architects and Associates; Engineer: G A Bhilare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Majestique Rhythm County Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Majestique Rhythm County Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Majestique Rhythm County Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.