Majestic Om

By SANJAY LAXMANRAO NARAD

RG-MH-95746 · RERA P50500050029 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
12 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Majestic Om is a Residential / Group Housing project by SANJAY LAXMANRAO NARAD in Nagpur, Maharashtra, registered with MahaRERA as P50500050029 on 6 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 12 of the 24 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameMajestic Om
  • TypeResidential / Group Housing
  • Location
    • Khamla
    • NAGPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • 440025
  • Pincode440025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500050029
  • ReraGenie IDRG-MH-95746

Builder

  • NameSANJAY LAXMANRAO NARAD
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredMar 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Current status

50%12 of 24 units booked
84.7%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Majestic OmNA7624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Majestic Om: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed129

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots129
Open Space129

Land and ownership13

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area750 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2025
LandownerVillageDistrict
Shri Sudhir Hari WaradpandeNagpur (M Corp.)Nagpur
Shri Prakash Bhalchandra KunteNagpur (M Corp.)Nagpur
Shri Suresh Shridhar KaleNagpur (M Corp.)Nagpur
Shri Purushottam Laxman DantaleNagpur (M Corp.)Nagpur
Shri Sunil Purushottam KarnikNagpur (M Corp.)Nagpur
Shri Rajeev Anant PandeNagpur (M Corp.)Nagpur
Shri Anil Narayan BopardikarNagpur (M Corp.)Nagpur
Mrs Ragini Anil BopardikarNagpur (M Corp.)Nagpur
Shri Dattatraya Shankar JoshiNagpur (M Corp.)Nagpur
Shri Ajit Madhusudan JoshiNagpur (M Corp.)Nagpur
Shri Arun Shamrao JoshiNagpur (M Corp.)Nagpur
Shri Milind Gopal PandeNagpur (M Corp.)Nagpur
Shri Deepak Vitthal DehadraiNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI2378.52
Proposed, not sanctioned2,379 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJejani Complex, Opp PNB MICR Clearing Centre, Great Nag Road Nagpur-440001
Estimated costRs 5.15 cr
Cost incurredRs 4.36 cr
Work done84.69%
BuildingWingEstimatedIncurred
-NARs 5.15 crRs 4.36 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJitendra Ingulkar
EngineerSudesh B Malode
Chartered AccountantCA Adhish Agarwal
PartnerRole in project
M/s. Lifestyle Infrastructure-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Majestic Om From 1.pdf28 Apr 2026
Withdrawal Update Form 2File: Majestic om From 2.pdf28 Apr 2026
Withdrawal Update Form 3File: From 3 Om_compressed (1).pdf28 Apr 2026
Occupational CertificateFile: FULL OCCUPENCY OM APARTMENT.pdf6 Feb 2026
Withdrawal Update Form 1File: majestic om 30-09-25 form-1.pdf21 Jan 2026
Withdrawal Update Form 1File: majestic om 31-12-25 form-1.pdf21 Jan 2026
Withdrawal Update Form 2File: om 30-09-2025 form-2.pdf21 Jan 2026
Withdrawal Update Form 2File: om 31-12-2025 form-2.pdf21 Jan 2026
Withdrawal Update Form 3File: form 3 30-09-2025.pdf21 Jan 2026
Withdrawal Update Form 3File: IMG_0005_compressed (1).pdf21 Jan 2026
Form 1File: majestic om 31-03-25 form-1.pdf20 Jan 2026
Form 2File: om 31-03-2025 form-2 .pdf20 Jan 2026
Form 3File: CA 31-03-2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 31-03-2025.pdf20 Jan 2026
Withdrawal Update Form 1File: majestic om 30-06-25 form-1.pdf20 Jan 2026
Withdrawal Update Form 2File: om 30-06-2025 form-2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3 30-06-2025_compressed.pdf20 Jan 2026
Form 1File: 1 Arc cer 1-4-23.pdf9 Jan 2026
Form 2File: 1 engineering cer 1-4-23.pdf9 Jan 2026
Form 3File: 1 CA cer 12-9-23.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 1 sOLD bOOKD - 31-03-2023.pdf9 Jan 2026
Form 1File: 2 Arc cer 1-7-23.pdf9 Jan 2026
Form 2File: 2 engineering cer 1-7-23.pdf9 Jan 2026
Form 3File: 2 CA cer 15-9-23.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 2 sOLD bOOKD - 30-06-2023.pdf9 Jan 2026
Form 1File: 3 arc cer 1-10-23.pdf9 Jan 2026
Form 2File: 3 engineering cer 1-10-23.pdf9 Jan 2026
Form 3File: 3 CA cer 15-10-23.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 3 sOLD bOOKD - 30-09-2023.pdf9 Jan 2026
Form 1File: 1 art 31-12-23.pdf9 Jan 2026
Form 2File: 1 eng 31-12-23.pdf9 Jan 2026
Form 3File: 1 31-12-23.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 1 sold u 31-12-23.pdf9 Jan 2026
Form 1File: 2 art 31-03-24.pdf9 Jan 2026
Form 2File: 2 eng 31-03-24.pdf9 Jan 2026
Form 3File: 2 31-03-24.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 2 sold u 31-03-24.pdf9 Jan 2026
Form 1File: 3 art 30-06-24.pdf9 Jan 2026
Form 2File: Eng 30-06-2024 final.pdf9 Jan 2026
Form 3File: 3 30-06-24.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 3 sold unsold 30-06-24.pdf9 Jan 2026
Form 1File: 4 art 30-09-24.pdf9 Jan 2026
Form 2File: 4 eng30-09-24.pdf9 Jan 2026
Form 3File: form 30-09-2024 revised_compressed.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 4 sold unsold 30-09-24.pdf9 Jan 2026
Form 1File: 5 art 31-12-24.pdf9 Jan 2026
Form 2File: 5 eng 31-12-24.pdf9 Jan 2026
Form 3File: form 31-12-2024 revised_compressed.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: 5 sold u 31-12-24.pdf9 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 art 31-03-24.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 art 30-09-24.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 art 31-12-24.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 art 30-06-24.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 art 31-12-23.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 31-12-23.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 31-03-24.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 30-06-24.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 30-09-24.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 31-12-24.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 eng 31-03-24.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 eng 31-12-24.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 eng30-09-24.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 eng 30-06-24.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 eng 31-12-23.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: 1 sold u 31-12-23.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: 2 sold u 31-03-24.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: 3 sold unsold 30-06-24.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: 4 sold unsold 30-09-24.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: 5 sold u 31-12-24.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Majestic Om.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: c a form5.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A FY 2022-23.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 CA Certificate - FY 2022-23.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Arc cer 1-4-23.pdf14 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Arc cer 1-7-23.pdf14 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 arc cer 1-10-23.pdf14 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 engineering cer 1-4-23.pdf14 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 engineering cer 1-7-23.pdf14 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 engineering cer 1-10-23.pdf14 Nov 2023
Disclosure of sold/ booked inventoryFile: 1 sOLD bOOKD - 31-03-2023.pdf14 Nov 2023

How this compares with Nagpur

50%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Majestic Om on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAGPUR2,800+ in Nagpur

2 kmMajestic OmCompleted 36Lapsed / revoked 17Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: SANJAY LAXMANRAO NARAD

SANJAY LAXMANRAO NARAD has 5 registrations on MahaRERA, including BALAJI ENCLAVE and Majestic Om. Its filings disclose 7 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Majestic Om is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Majestic Om?

The registered promoter entity is SANJAY LAXMANRAO NARAD, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Majestic Om?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Majestic Om?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Majestic Om?

The professionals named in the filing: Architect: Jitendra Ingulkar; Engineer: Sudesh B Malode; Chartered Accountant: CA Adhish Agarwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Majestic Om?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Majestic Om. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Majestic Om to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.