Home / Browse projects / Mumbai City, Maharashtra / MAHAVIR VILLE

Registered No litigation declared Residential / Group Housing project

MAHAVIR VILLE

By EKNATH INFRASTRUCTURE LLP

RG-MH-02944 · RERA P51900020220 · Last updated on MahaRERA portal: 17 Oct 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 42 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 88%
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

MAHAVIR VILLE is a Residential / Group Housing project by EKNATH INFRASTRUCTURE LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900020220 on 29 Mar 2019. Possession is promised by 30 Jun 2028. The completion date has moved by 42 months from the original filing.

At a glance

Project

  • NameMAHAVIR VILLE
  • TypeResidential / Group Housing
  • Location
    • BHANDARKAR ROAD
    • MATUNGA EAST
    • Mumbai City
    • 400019
  • Pincode400019
  • RERA no.P51900020220
  • ReraGenie IDRG-MH-02944

Builder

  • NameEKNATH INFRASTRUCTURE LLP
  • Entity typeOthers
  • Named personSHREE NAMAN DEVELOPERS PRIVATE LIMITED

Key dates

this monthRegisteredMar 2019First promiseDec 2024Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Mar 2019
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2024)
  • Buildings2 building records
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHAVIR VILLE 1 TO 28 - WING CNA350000
MAHAVIR VILLE 29-36 - WING CNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 88%.

MAHAVIR VILLE 1 TO 28 - WING C21%
ActivityProgress
Excavation88%
Basement (if any)55%
Podiums (if any)0%
Plinth55%
Stilt Floor35%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MAHAVIR VILLE 29-36 - WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed340

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots340
Closed/Covered340
BuildingClosed/CoveredTotal
MAHAVIR VILLE 1 TO 28 - WING C275275
MAHAVIR VILLE 29-36 - WING C6565

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
FIRSTWAVE DEVELOPERS LLP-Mumbai City

Approvals and building plan

Permissible FSI17590.0
Proposed, not sanctioned6,746 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNIT NO 2 A1, GROUND FLOOR, HALLMARK PLAZA, GURUNANAK HOSPITAL ROAD, KALANAGAR, BANDRA EAST

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH PAWAR
PartnerRole in project
EKNATH INFRASTRUCTURE LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900012569Dec 2024 → Jun 2028

Reason as filed by the promoterDue to Covid-19 Pandemic and other force majeure reasons, there has been a delay in the construction of the project Mahavir Ville. We state that we will complete the Project on or before 30th June, 2028. We have not sold/ booked any units in the Project Mahavir Ville , hence consent from for extension of project completion date to 30th June, 2028is not required. Hence, we request this Hon’ble Authority to grant us extension for completion of project Mahavir Ville till 30th June, 2028 and oblige.

EXT51900008739Dec 2024 → Dec 2026

Reason as filed by the promoterDue to Covid-19 Pandemic, there has been a consistent shortage of workers and labourers. Thus there has been a delay in the construction of the project Mahavir Ville. We state that we will complete the Project on or before 31st December, 2026. We have not sold/ booked any units in the Project Mahavir Ville , hence consent from for extension of project completion date to 31st December, 2026 is not required. Hence, we request this Hon’ble Authority to grant us extension for completion of project Mahavir Ville till 31St December, 2026 and oblige.

Litigation declared17

CaseCourtStatus
RAD/380/2016/2016SMALL CAUSES COURTPENDING
RAD/249/2016/2016SMALL CAUSES COURTPENDING
RAD/105/2016/2016SMALL CAUSES COURTPENDING
RAD/103/2016/2016SMALL CAUSES COURTPENDING
RAD/201829/2015/2015SMALL CAUSES COURTPENDING
RAD/201704/2015/2015SMALL CAUSES COURTPENDING
RAD/201651/2015/2015SMALL CAUSES COURTPENDING
RAD/1218/2003/2003SMALL CAUSES COURTPENDING
RAD/1923/2014/2014SMALL CAUSES COURTPENDING
SUIT/102933/2016/2016CITY CIVIL COURT AT MUMBAIPENDING
WP 1119/2016/2016HIGH COURT BOMBAYPENDING
WP 1120/2016/2016HIGH COURT BOMBAYPENDING
WP L 742/2016/2016HIGH COURT BOMBAYPENDING
RAD/1590/2016/2016SMALL CAUSES COURTPENDING DECLARATION OF TENANCY
RAD/1589/2016/2016SMALL CAUSES COURTPENDING
RAD/619/2016/2016SMALL CAUSES COURTPENDING
RAD/381/2016/2016SMALL CAUSES COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahavir Ville RERA Certificate_16 oct 2023_DS.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahavir Ville RERA Certificate_12July2023_DS.pdf13 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Eknath INFRA LLP FY 22-23.pdf28 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Eknath Infra LLP - RERA Form 5 2018-19.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Eknath Infrastructure LLP 19-20.pdf24 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032023Mahavir Ville RERA Certificate.pdf5 Apr 2023
Annual Audit Report of Statutory CA (Form 5)File: Eknath Infrastructure LLP- Form 5 2021-22.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahavir Ville RERA Certificate_07October2022_DS.pdf31 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A_Site Supervisors Certificate.pdf17 Oct 2022
Declaration about Commencement CertificateFile: Declaration for CC-sept2022.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY.pdf7 Oct 2022
Certificates of CA (Form 3)File: FORM 3 EILLP.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Eknath Infrastructure LLP- Form 5 2021-22.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Eknath Infrastructure LLP- Form 5 2021-22.pdf23 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Eknath Infrastructure Form 5 20-21.pdf30 Sep 2021
Details of Restarting of Construction work post lockdownFile: MV Details Of Restarting 15 07 2020.pdf16 Jul 2020
Certificates of CA (Form 3)File: Form 3-CA Certificate Matunga_Project_Dec 19.pdf13 Apr 2020
Form 2AFile: Q4_FORM2A.pdf17 Mar 2020
Annual Audit Report of Statutory CA (Form 5)File: FORM5.pdf30 Sep 2019
Form 2AFile: 2A.pdf5 Jul 2019
Details of encumbrancesFile: Encumberance Certificate.pdf23 Mar 2019
Certificates of CA (Form 3)File: CA CERTIFICATE FOR RERA.pdf23 Mar 2019
Proforma of Allotment letterFile: MOFA Declaration.pdf23 Mar 2019
OtherFile: Self declaration.pdf23 Mar 2019
Building plan approvalFile: IOD.pdf22 Mar 2019
Layout approvalFile: No Layout.pdf22 Mar 2019
Copy of the legal title reportFile: Title Report.pdf22 Mar 2019
Copy of Layout Approval (in case of layout)File: No Layout.pdf22 Mar 2019
Building Plan Approval (IOD)File: IOD.pdf22 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf22 Mar 2019
Declaration in FORM BFile: Form B - Eknath.pdf22 Mar 2019

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 42 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHAVIR VILLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MATUNGA EAST780+ in Mumbai City

Builder: EKNATH INFRASTRUCTURE LLP

EKNATH INFRASTRUCTURE LLP has 1 registration on MahaRERA, including MAHAVIR VILLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if MAHAVIR VILLE is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHAVIR VILLE?

The registered promoter entity is EKNATH INFRASTRUCTURE LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHAVIR VILLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHAVIR VILLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHAVIR VILLE?

The professionals named in the filing: Architect: UMESH PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHAVIR VILLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHAVIR VILLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHAVIR VILLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.