Completed No litigation declared Residential / Group Housing project

MAHAVIR SQUARE

By THANE SQUAREFEET LIFESTYLES LLP

RG-MH-28073 · RERA P51700024701 · Last updated on MahaRERA portal: 24 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
19 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
11 of 285Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

MAHAVIR SQUARE is a Residential / Group Housing project by THANE SQUAREFEET LIFESTYLES LLP in Thane, Maharashtra, registered with MahaRERA as P51700024701 on 28 Feb 2020. The registration is recorded completed; possession was promised by 30 Dec 2027. 274 of the 285 units on this registration are recorded sold or booked, and 19 of 22 construction stages are filed complete.

At a glance

Project

  • NameMAHAVIR SQUARE
  • TypeResidential / Group Housing
  • Location
    • CHITALSAR
    • MANPADA
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024701
  • ReraGenie IDRG-MH-28073

Builder

  • NameTHANE SQUAREFEET LIFESTYLES LLP
  • Entity typePartnership
  • PartnersSACHIN CHANDRU MIRANI, RAJNI KANYALAL DHIRMALANI, DALPATRAJ SAMPATHRAJ JAIN, VIVEK MAHESHCHANDRA MANGLA, RAMESH VELJI SHAH, MANSUKH VELJI WAGHJI SHAH, MITUL HANSRAJ SAVLA, DILIP DAMJI SHAH, JAYESH CHANDRAKANT SHAH, VINAY RATILAL SHAH, PRANAY VASANTLAL SHAH, DEEPAK PARASMAL JAIN and 1 more

Key dates

this monthRegisteredFeb 2020PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Feb 2020
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed93 files

Current status

96%274 of 285 units booked
100.0%Work done, per cost certificate

Figures as on 24 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA27251460146
B WINGNA27251390139

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed287

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots287
Closed/Covered287
BuildingClosed/CoveredTotal
A WING160160
B WING127127

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,487 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Nov 2025

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL AUTHORITY
Permissible FSI27109.0
Proposed, not sanctioned19,395 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGAUTAM HOUSE CHS, NEXT TO PNB BANK
Estimated costRs 125.00 cr
Cost incurredRs 125.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
A WINGNARs 48.50 crRs 48.50 cr
B WINGNARs 48.50 crRs 48.50 cr
-NARs 28.00 crRs 28.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect10Folds Architects and Consultants
EngineerAjay Mahale
EngineerKalpesh Tribhuvan
Chartered AccountantNeha Amit and Associates
Chartered AccountantH P Biyani & co
PartnerRole in project
THANE SQUAREFEET LIFESTYLES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Dec 2024

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARCHITECT CETRIFICATE Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 1File: Form 1 ARCHITECT CETRIFICATE Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2 Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2 Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 3File: Form 3CA CERTIFICATE Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 3File: Form 3CA CERTIFICATE Sept 2025.pdf24 Nov 2025
Occupational CertificateFile: OC of A and B wing.pdf24 Nov 2025
Form 2A (FY 2021-2022)File: Form 2A_Engineer Certificate_2021-22.pdf19 Nov 2025
Form 2A (FY 2022-2023)File: Form 2A_Engineer Certificate_2022-23.pdf19 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A_Engineer Certificate_2023-24.pdf19 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A_Engineer Certificate_2024-25.pdf19 Nov 2025
Form 1File: 2025 03 31 ARCHITECTS CERTIFICATE.pdf15 Nov 2025
Form 2File: 2025 03 31 ENGINEERS CETRIFICATE.pdf15 Nov 2025
Form 3File: Form 3 March 2025.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf15 Nov 2025
Form 1File: ARCHITECTS CERTIFICATE Form 1.pdf15 Nov 2025
Form 2File: Form 2.pdf15 Nov 2025
Form 3File: FORM 3 June 2025.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: Revised Form 5_THANE SQUAREFEET_2025.pdf11 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A WING ARCHITTECTS CERTIFICATE.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B WING ARCHITTECTS CERTIFICATE.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA Certificate.pdf4 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B-Wing_OC Copy_15903.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A WING ARCHITECT CERTIFICATE.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B WING ARCHITECT CERTIFICATE.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA RERA Certificate.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 March 2023.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A WING ARCHITECT CERTIFICATE.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B WING ARCHITECT CERTIFICATE.pdf25 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE MAHAVIR SQUARE.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER CERTIFICATE MAHAVIR SQUARE.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA Certificate.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B Wing Art.pdf3 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A Wing Art.pdf3 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC.pdf3 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf3 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MS Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA FORM 5- March 2022 - Final -Thane SF Lifestyle LLP.pdf25 Apr 2023
Proforma of Agreement for saleFile: MS_Draft Agreement - 25-02-2022_29-01-2022_CC.pdf16 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC dated 21-07-2022.pdf30 Jul 2022
Proforma of Allotment letterFile: MS_Draft Agreement - 25-02-2022_29-01-2022_CC.pdf20 Mar 2022
Declaration about Commencement CertificateFile: M S DECLARATION CERTIFICATE.pdf22 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 31 12 2020 ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE.pdf22 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 30 06 2021 ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE.pdf22 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 30 09 2021 ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE.pdf22 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31 12 2021 ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE.pdf22 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31 03 2021 ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE.pdf22 Feb 2022
CERSAI detailsFile: NEW CERSAI_Search_Report_200230180082_For_Asset_Based_Search_14_02_2022_16_15_26_765 (2).p22 Feb 2022
CERSAI detailsFile: NEW CERSAI_Search_Report_200230180082_For_Asset_Based_Search_14_02_2022_16_15_26_765 (1).p22 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200230159368_For_Asset_Based_Search_14_02_2022_13_51_15_521.pdf22 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200230159314_For_Asset_Based_Search_14_02_2022_13_50_40_257.pdf22 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200230159344_For_Asset_Based_Search_14_02_2022_13_50_59_116.pdf22 Feb 2022
Disclosure of sold/ booked inventoryFile: M S PROMOTERS DISCLOSURE OF SOLD BOOKED INVENTORIES.pdf22 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA FORM 5 Thane SF Lifestyle LLP March 2021 Final.pdf22 Feb 2022
Layout approvalFile: CC Plans_27-01-2022_compressed.pdf28 Jan 2022
Copy of Layout Approval (in case of layout)File: CC Plans_27-01-2022_compressed.pdf28 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_27-01-2022.pdf28 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer certificate (ajay mahale).pdf10 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Thane Square Feet - Phase 1 - 31122021 (1)_compressed.pdf10 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_MAHAVIR SQUARE.pdf14 Aug 2021
Proforma of Allotment letterFile: Mahavir Square_Agreement Draft.pdf20 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_29-01-2021_3544-21.pdf9 Feb 2021
Declaration in FORM BFile: From B_compressed.pdf26 Feb 2020
Layout approvalFile: MS Plan 1.pdf20 Feb 2020
Layout approvalFile: MS Plan 2.pdf20 Feb 2020
Layout approvalFile: MS Plan 3.pdf20 Feb 2020
Layout approvalFile: MS Plan 4.pdf20 Feb 2020
Layout approvalFile: MS Plan 5.pdf20 Feb 2020
Layout approvalFile: MS Plan 6.pdf20 Feb 2020
Layout approvalFile: MS Plan 7.pdf20 Feb 2020
Layout approvalFile: MS Plan 8.pdf20 Feb 2020
Building plan approvalFile: NA order.PDF20 Feb 2020
PAN CardFile: THANE SQFT PAN CARD.pdf20 Feb 2020
Copy of the legal title reportFile: title certificate.pdf20 Feb 2020
Details of encumbrancesFile: ecumbrance certificate Mahavir square.pdf20 Feb 2020
Copy of Layout Approval (in case of layout)File: MS Plan 1.pdf20 Feb 2020
Copy of Layout Approval (in case of layout)File: MS Plan 2.pdf20 Feb 2020

How this compares with Thane

96%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHAVIR SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANPADA7,600+ in Thane

2 kmMAHAVIR SQUARECompleted 38Lapsed / revoked 30Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: THANE SQUAREFEET LIFESTYLES LLP

THANE SQUAREFEET LIFESTYLES LLP has 1 registration on MahaRERA, including MAHAVIR SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MAHAVIR SQUARE is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHAVIR SQUARE?

The registered promoter entity is THANE SQUAREFEET LIFESTYLES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHAVIR SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHAVIR SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHAVIR SQUARE?

The professionals named in the filing: Architect: 10Folds Architects and Consultants; Engineer: Ajay Mahale; Engineer: Kalpesh Tribhuvan; Chartered Accountant: Neha Amit and Associates; Chartered Accountant: H P Biyani & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHAVIR SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHAVIR SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHAVIR SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.