Home / Browse projects / Thane, Maharashtra / MAHAVEER HORIZON WING A AND WING B
MAHAVEER HORIZON WING A AND WING B
By MAHAVEER INFRASTRUCTURE PVT LTD
RG-MH-05343 · RERA P51700051107 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 5.00 crore secured on the land, in favour of THE KALYAN JANTA SAHKARI BANK LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHAVEER HORIZON WING A AND WING B is a Residential / Group Housing project by MAHAVEER INFRASTRUCTURE PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700051107 on 29 May 2023. Possession is promised by 31 Dec 2028. 69 of the 95 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameMAHAVEER HORIZON WING A AND WING B
- TypeResidential / Group Housing
- Location
- AGARWAL COLLEGE ROAD
- KOLIVALI KALYAN
- Kalyan-Dombivali (M Corp.)
- Kalyan
- Thane
- 421301
- Pincode421301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700051107
- ReraGenie IDRG-MH-05343
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed96 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAHAVEER HORIZON WING A | NA | 8 | 7 | 20 | 8 | 28 |
| MAHAVEER HORIZON B WING | NA | 21 | 20 | 58 | 9 | 67 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.
MAHAVEER HORIZON WING A72%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
MAHAVEER HORIZON B WING72%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| MAHAVEER HORIZON WING A | 1 | 1 |
| MAHAVEER HORIZON B WING | 1 | 1 |
Land and ownership6
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| ANANTA SONGYA LOKHANDE | Kalyan-Dombivali (M Corp.) | Thane |
| GANESH SONGYA LOKHANDE | Kalyan-Dombivali (M Corp.) | Thane |
| JITENDRA RAMDAS LOKHANDE | Kalyan-Dombivali (M Corp.) | Thane |
| MURLI RAMDAS LOKHANDE | Kalyan-Dombivali (M Corp.) | Thane |
| NANDABAI RAMDAS LOKHANDE | Kalyan-Dombivali (M Corp.) | Thane |
| SANDIP RAMDAS LOKHANDE | Kalyan-Dombivali (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MAHAVEER HORIZON B WING | NA | Rs 17.39 cr | Rs 15.28 cr |
| MAHAVEER HORIZON WING A | NA | Rs 5.25 cr | Rs 4.61 cr |
| - | NA | Rs 3.60 cr | Rs 1.00 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VITAN CONSULTANTS Anil Nirgude |
| Architect | Vitan Consultants |
| Engineer | PENTACON STRUCTURAL CONSULTANTS PVT LTD |
| Engineer | NITIN MORE |
| Chartered Accountant | SANDEEP SUBHEDAR |
| Chartered Accountant | R S P H & Associates |
| Chartered Accountant | P.N. Sabadra & Associates |
| Partner | Role in project |
|---|---|
| MAHAVEER INFRASTRUCTURE PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A - march 26 .pdf | 5 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - March 24.pdf | 5 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - march 26 .pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: AR Mar-26.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: ER Mar-26.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: CA.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Architect -Dec 2025.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: ER - Dec 2025.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: Mahaveer CA Certificate-Dec 25 final.pdf | 6 Feb 2026 |
| Form 5 (FY 2024-2025)File: RERA Audit Report-24-25 signed report final.pdf | 31 Dec 2025 |
| Form 1File: AR - Sept 25.pdf | 18 Oct 2025 |
| Form 2File: ER - Sept 25.pdf | 18 Oct 2025 |
| Form 3File: CA - Sept25 final_c.pdf | 18 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 25.pdf | 18 Oct 2025 |
| Form 1File: AR June 25.pdf | 7 Oct 2025 |
| Form 2File: ER June 25_compressed.pdf | 7 Oct 2025 |
| Form 3File: CA certificate jun 25 final.pdf | 7 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure June 25.pdf | 7 Oct 2025 |
| Form 1(1) | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf | 29 Apr 2025 |
| form 2 | 29 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final RERA AUDIT REPORT-2023-24.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Dec-24.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_CA Certificate Dec-24_compressed.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec-24_compressed.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Final.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ER Cert final.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AR Cert Final.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AR Cert Final.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Final.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ER Cert final.pdf | 10 Oct 2024 |
| Layout approvalFile: Sanctioned Plan-Revised.pdf | 26 Jun 2024 |
| Building plan approvalFile: Sanctioned Plan-Revised.pdf | 26 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Sanctioned Plan-Revised.pdf | 26 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan-Revised.pdf | 26 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC Mahaveer Horizon.pdf | 25 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate for Quality Assurances.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Booked or Sold Inventory June 23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Booked or Sold Inventory Sept 23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Booked or Sold Inventory Dec 23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Booked or Sold Inventory Mar 24.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2024.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2024.pdf | 23 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2024_Signed - converted.pdf | 23 Apr 2024 |
| Building plan approvalFile: Revise CC Mahaveer Horizon.pdf | 21 Feb 2024 |
| Building plan approvalFile: A Wing - Revised Plan.pdf | 21 Feb 2024 |
| Building plan approvalFile: B Wing - Revise Plan.pdf | 21 Feb 2024 |
| Building plan approvalFile: B Wing - Revised Plan.pdf | 21 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revise CC Mahaveer Horizon.pdf | 21 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: A Wing - Revised Plan.pdf | 21 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B Wing - Revise Plan.pdf | 21 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B Wing - Revised Plan.pdf | 21 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC Cer DEC23.pdf | 8 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Dec-23_compressed.pdf | 8 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cer DEc23_compressed (1) Final.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate Sep 23.pdf | 7 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate Sep 23.pdf | 7 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep 23_compressed.pdf | 7 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 13 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (1).pdf | 13 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form -3 signed.pdf | 13 Sep 2023 |
| CERSAI detailsFile: No Dues Certificate of KJSB.pdf | 23 May 2023 |
| CERSAI detailsFile: Declaration about CERSAI.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest(3).pdf | 18 May 2023 |
| Details of encumbrances concerned to FinanceFile: Decalaration about financial Encumbrance.pdf | 12 May 2023 |
| Details of encumbrances concerned to LegalFile: Decalaration about financial Encumbrance.pdf | 12 May 2023 |
| Building plan approvalFile: B wing.pdf | 28 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B wing.pdf | 28 Apr 2023 |
| Building plan approvalFile: A wing.pdf | 17 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: A wing.pdf | 17 Apr 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf | 16 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revise Form 3.pdf | 16 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank account (2).pdf | 16 Apr 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MAHAVEER HEAVENS PHASE II | MAHAVEER HEAVENS PHASE II NEXT TO K M AGRAWAL COLLEGE BEHIND ROYCE PARADISE GANDHARE KALYAN WEST | 1 | Completed | Dec 2022 | Jun 2021 |
| MAHAVEER HEAVENS PHASE I | MAHAVEER HEAVENS PHASE I NEXT TO K M AGRAWAL COLLEGE BEHIND ROYCE PARADISE GANDHARE KALYAN WEST | 2 | Completed | Dec 2022 | Mar 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAHAVEER HORIZON WING A AND WING B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOLIVALI KALYAN7,600+ in Thane
Filed coordinates, straight-line distance. 175 registered projects within 2 km.
PODDAR RIVIERA PHASE - I
Poddar Housing and Development Limited
Sinhagad by Bhagwati Haware - Wing - B
Bhagwati Haware Properties Supertech
Pratapgad by Bhagwati Haware - Wing - C
Bhagwati Haware Properties Supertech
Rajgad by Bhagwati Haware - Wing - D
Bhagwati Haware Properties Supertech
PODDAR RIVIERA PHASE - III
Poddar Housing and Development Limited
THARWANI PARKGLEN PHASE I
THARWANI REALTORS
See every Thane project, with the district possession charts
Builder: MAHAVEER INFRASTRUCTURE PVT LTD
MAHAVEER INFRASTRUCTURE PVT LTD has 3 registrations on MahaRERA, including MAHAVEER HEAVENS PHASE I and MAHAVEER HEAVENS PHASE II. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MAHAVEER HORIZON WING A AND WING B is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHAVEER HORIZON WING A AND WING B?
The registered promoter entity is MAHAVEER INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHAVEER HORIZON WING A AND WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAHAVEER HORIZON WING A AND WING B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHAVEER HORIZON WING A AND WING B?
The professionals named in the filing: Architect: VITAN CONSULTANTS Anil Nirgude; Architect: Vitan Consultants; Engineer: PENTACON STRUCTURAL CONSULTANTS PVT LTD; Engineer: NITIN MORE; Chartered Accountant: SANDEEP SUBHEDAR; Chartered Accountant: R S P H & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHAVEER HORIZON WING A AND WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback