Home / Browse projects / Thane, Maharashtra / MAHAVEER HEAVENS PHASE II
MAHAVEER HEAVENS PHASE II
By MAHAVEER INFRASTRUCTURE PVT LTD
RG-MH-63671 · RERA P51700013797 · Last updated on MahaRERA portal: 2 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHAVEER HEAVENS PHASE II is a Residential / Group Housing project by MAHAVEER INFRASTRUCTURE PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700013797 on 25 Oct 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.
At a glance
Project
- NameMAHAVEER HEAVENS PHASE II
- TypeResidential / Group Housing
- Location
- Kalyan
- Thane
- 421301
- Pincode421301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700013797
- ReraGenie IDRG-MH-63671
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Oct 2017
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAHAVEER HEAVENS | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
MAHAVEER HEAVENS: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANDIP SANGEET ANANTA LOKHANDE ASHOK KARBHARI | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANIL R NIRGUDE |
| Chartered Accountant | SANDEEP SUBHEDAR |
| Partner | Role in project |
|---|---|
| MAHAVEER INFRASTRUCTURE PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Dec 2022
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Mahaveer Heavens Phase-II.pdf | 2 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 (Mahaveer Heavens Phase II.pdf | 30 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 6 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate PH-2-Sept 20.pdf | 15 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate PH-2-Dec 20.pdf | 15 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PH-2-March 21.pdf | 15 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PH-2-Sept 21.pdf | 15 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PH-2-June 21.pdf | 15 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CA Certificate Phase II 19-20.pdf | 15 Dec 2021 |
| Certificates of CA (Form 3)File: 10Re Form 3 PH-II Mar 2020.pdf | 21 Oct 2020 |
| Certificates of CA (Form 3)File: 11 Re Form 3 PH-II June 2020.pdf | 21 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH-II Jul2020 Form 2_compressed.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: Form 3 PH-II Mar2020.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: Form 3 PH-II June2020.pdf | 30 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PH-II Mar20.pdf | 18 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PH-II jun20.pdf | 18 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH-II Mar2020 Form 2.pdf | 18 Sep 2020 |
| Certificates of CA (Form 5)File: DEC- 19 PH II From 3.pdf | 27 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec- 19 Engineer Certificate.pdf | 18 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec - 19.pdf | 17 Jan 2020 |
| Layout approvalFile: phase - II.pdf | 7 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: phase - II.pdf | 7 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Phase II July 19.pdf | 11 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH-II SEP-19 Engineer Certificate.pdf | 11 Dec 2019 |
| Certificates of CA (Form 5)File: 08 Form 3 PH-II Sep19.pdf | 11 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PH II June 18 (1).pdf | 22 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PH II Sep 18.pdf | 22 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Phase II July 19.pdf | 22 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph-II June-19 Engineer Certificate.pdf | 22 Nov 2019 |
| Certificates of CA (Form 5)File: June 19 Form 3 PH II.pdf | 22 Nov 2019 |
| Layout approvalFile: Phase II Layout Plan.pdf | 16 May 2019 |
| Copy of Layout Approval (in case of layout)File: Phase II Layout Plan.pdf | 16 May 2019 |
| Certificates of CA (Form 5)File: RERA Form 5 (Phase II).pdf | 22 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase II (Mar).pdf | 17 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Phase II (Mar-19).pdf | 17 Apr 2019 |
| Certificates of CA (Form 3)File: CA Certificate Phase II (MAR-19).pdf | 17 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec PH-II.pdf | 15 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certificate June (PH-II)009.pdf | 15 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certificate Sep (PH-II)010.pdf | 15 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certificate DEC (PH-II).pdf | 15 Mar 2019 |
| Certificates of CA (Form 3)File: DEC FORM 3 (PH-II)014.pdf | 15 Mar 2019 |
| Certificates of CA (Form 3)File: PHASE II (FORM 3- JUNE).pdf | 25 Jan 2019 |
| Certificates of CA (Form 3)File: PHASE II (FORM 3- SEP).pdf | 25 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 FORM 1 MAR 18244.pdf | 15 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PHASE 2 FORM 2 MAR 18243-compressed.pdf | 15 Dec 2018 |
| Certificates of CA (Form 3)File: PHASE 2 FORM 3 MAR 18242.pdf | 15 Dec 2018 |
| Proforma of Allotment letterFile: MAHAVEER_HEAVENS_PHASE_II (1).pdf | 31 Jul 2018 |
| Copy of the legal title reportFile: TITLE PHASE II.pdf | 29 Sep 2017 |
| Details of encumbrancesFile: TITLE PHASE II.pdf | 29 Sep 2017 |
| Declaration in FORM BFile: FORM B PHASE II.pdf | 29 Sep 2017 |
| Proforma of Allotment letterFile: MAHAVEER_HEAVENS_PHASE_II.pdf | 29 Sep 2017 |
| Certificates of CA (Form 3)File: Form 3 RERA.pdf | 28 Sep 2017 |
| Proforma of Allotment letterFile: Allotment_Letter_Phase_II.pdf | 28 Sep 2017 |
| Layout approvalFile: LAYOUT PLAN PHASE II.pdf | 25 Sep 2017 |
| Building plan approvalFile: CC Phase II.pdf | 25 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN PHASE II.pdf | 25 Sep 2017 |
| Building Plan Approval (IOD)File: CC Phase II.pdf | 25 Sep 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Phase II.pdf | 14 Sep 2017 |
| PAN CardFile: MIPL PAN046.pdf | 22 Aug 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MAHAVEER RIVER VALLEY | MAHAVEER RIVER VALLEY GANDHARE KALYAN WEST 421301 | 140 | Completed | Mar 2016 | Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep MAHAVEER HEAVENS PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalyan7,600+ in Thane
Filed coordinates, straight-line distance. 243 registered projects within 2 km.
PODDAR RIVIERA PHASE - I
Poddar Housing and Development Limited
Sinhagad by Bhagwati Haware - Wing - B
Bhagwati Haware Properties Supertech
Pratapgad by Bhagwati Haware - Wing - C
Bhagwati Haware Properties Supertech
Rajgad by Bhagwati Haware - Wing - D
Bhagwati Haware Properties Supertech
PODDAR RIVIERA PHASE - III
Poddar Housing and Development Limited
THARWANI PARKGLEN PHASE I
THARWANI REALTORS
See every Thane project, with the district possession charts
Builder: MAHAVEER INFRASTRUCTURE PVT LTD
MAHAVEER INFRASTRUCTURE PVT LTD has 3 registrations on MahaRERA, including MAHAVEER HEAVENS PHASE I and MAHAVEER HEAVENS PHASE II. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MAHAVEER HEAVENS PHASE II is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHAVEER HEAVENS PHASE II?
The registered promoter entity is MAHAVEER INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHAVEER HEAVENS PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAHAVEER HEAVENS PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHAVEER HEAVENS PHASE II?
The professionals named in the filing: Architect: ANIL R NIRGUDE; Chartered Accountant: SANDEEP SUBHEDAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHAVEER HEAVENS PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback