MAHATMA JYOTIBA PHULE CHS LTD
By TRIDEVH CONSTRUCTION COMPANY
RG-MH-26824 · RERA P51800006009 · Last updated on MahaRERA portal: 25 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHATMA JYOTIBA PHULE CHS LTD is a Residential / Group Housing project by TRIDEVH CONSTRUCTION COMPANY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006009 on 14 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 98 of the 132 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameMAHATMA JYOTIBA PHULE CHS LTD
- TypeResidential / Group Housing
- Location
- MAHATMA PHULE ROAD
- MULUND EAST
- Kurla
- Mumbai Suburban
- 400081
- Pincode400081
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800006009
- ReraGenie IDRG-MH-26824
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed280 files
Current status
Figures as on 25 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAHATMA JYOTIBA PHULE CHS LTD - B | NA | 28 | 18 | 70 | 0 | 70 |
| MAHATMA JYOTIBA PHULE CHS LTD - A | NA | 26 | 16 | 62 | 0 | 62 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 98%.
MAHATMA JYOTIBA PHULE CHS LTD - B32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 60% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
MAHATMA JYOTIBA PHULE CHS LTD - A96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 60% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed145
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| MAHATMA JYOTIBA PHULE CHS LTD - B | 73 | 73 |
| MAHATMA JYOTIBA PHULE CHS LTD - A | 72 | 72 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MAHATMA JYOTIBA PHULE CHS LTD - B | NA | Rs 22.10 cr | Rs 8.60 cr |
| MAHATMA JYOTIBA PHULE CHS LTD - A | NA | Rs 14.80 cr | Rs 14.51 cr |
| - | NA | Rs 2.48 cr | Rs 2.48 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nitika Gahrana |
| Architect | Satyendra Thakker |
| Architect | Amol Jaybhaye |
| Engineer | Advance Creative Design Consultancy |
| Chartered Accountant | Himmat Shethia |
| Chartered Accountant | Malay Furia |
| Partner | Role in project |
|---|---|
| TRIDEVH CONSTRUCTION COMPANY | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere are total 2 wings in the project. Out of which Wing A is completed in full and construction status of Wing B, RCC work is completed up-to 7 Floors out of total 22 Floors. Form 1 that is Architect Certificate dated 28th December, 2023 submitted up-to the period of 30th November, 2023 is attached. In light of the same we seek extension of one year for due date of completion of the project that is 29-Dec-2024. Self Declaration dated 28-12-2023 for extension of due date for the project is attached. Scan copy of original Notarized Affidavit cum declaration on Rs. 100/- stamp paper in Form B w
Reason as filed by the promoterThere are total two wings in the project. A Wing is completed in full and RCC work of B Wing is completed up-to 6 Floors as evidenced by the latest Architect Certificate dated 9th April, 2025. In light of completion of the Wing B and for obtaining OC and related compliances of the project, we request you to kindly grant extension in project completion date up-to 31-12-2026. Detailed declaration stating the CPM/PERT chart of schedule of completion of the balance work within proposed project completion date is enclosed herewith.
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000418675 | Amit Gala | Tridev Construction Company Piyush Harish Gosar Deepak Mulchand Gosar | 30/12/2023 |
| CC006000000418676 | Alka Subhash Dujji | Tridev Construction Company, Piyush Harish Gosar, Deepak Mulchand Gosar | 30/12/2023 |
| CC006000000418677 | Mayur Ajitbhai Nagda | Tridev Construction Company, Piyush Harish Gosar, Deepak Mulchand Gosar | 30/12/2023 |
| CC006000000428876 | Dinesh Maganlal Haria | Tridev Construction Co., Piyush Harish Gosar, Deepak Mulchand Gosar | 17/01/2024 |
| CC006000000428878 | Naresh Bhavanji Nagda | Tridev Construction Co., Piyush Harish Gosar, Deepak Mulchand Gosar | 17/01/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed280
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 280 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_30-06-2025_MJP.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: Form 1_30-09-2025_MJP.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: Form 1_30-09-2025_MJP.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: Form 1_31-12-2025_MJP.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: Form 1_31-03-2026_MJP.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Scan Form 2_31-03-26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: MJP_Form -3_30-06-2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: MJP_Form -3_30-09-2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: MJP_Form -3_30-09-2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: MJP_Form -3_31-12-2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: Scan Form 3_31-03-26_compressed.pdf | 25 Jun 2026 |
| Form 1File: Scan_MJP_Form 1_31-03-25.pdf | 22 Jun 2026 |
| Form 2File: Form 2_compressed.pdf | 22 Jun 2026 |
| Form 3File: MJP_Form -3_31-03-2025.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventories_MJP.pdf | 22 Jun 2026 |
| Form 1File: Form 1_MJP_30-09-2017.pdf | 14 Mar 2026 |
| Form 2File: Form 2_MJP_30-09-2017.pdf | 14 Mar 2026 |
| Form 3File: Form 3_MJP_30-09-2017_compressed.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: MJP Form 1_31-12-2017.pdf | 14 Mar 2026 |
| Form 2File: MJP Form 2_31-12-2017.pdf | 14 Mar 2026 |
| Form 3File: MJP Form 3_31-12-2017_compressed.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: MJP Form 1_31-03-2018.pdf | 14 Mar 2026 |
| Form 2File: MJP Form 2_31-03-2018.pdf | 14 Mar 2026 |
| Form 3File: Form 3 TCC (MJP) as on 31-03-2018_compressed.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: 30-06-2018 MJP Form 1.pdf | 14 Mar 2026 |
| Form 2File: Form 2 30-06-2018_MJP.pdf | 14 Mar 2026 |
| Form 3File: Form 3 30-06-2018 MJP.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: 30-09-2018 MJP Form 1.pdf | 14 Mar 2026 |
| Form 2File: Form 2 30-09-2018_MJP.pdf | 14 Mar 2026 |
| Form 3File: Scanned Form 3 30-09-2018 MJP.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: 31-12-2018 MJP Form 1.pdf | 14 Mar 2026 |
| Form 2File: Form 2 31-12-2018_MJP.pdf | 14 Mar 2026 |
| Form 3File: Scanned Form 3 31-12-2018 MJP.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: 31-03-2019 MJP Form 1.pdf | 14 Mar 2026 |
| Form 2File: Form 2 31-03-2019_MJP.pdf | 14 Mar 2026 |
| Form 3File: Form 3_31-03-2019_MJP_Compressed.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: 31-12-2020 MJP Form 1.pdf | 14 Mar 2026 |
| Form 2File: Form 2 31-12-2020.pdf | 14 Mar 2026 |
| Form 3File: Form 3_31-12-2020_MJP.PDF | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: 30-09-2021 MJP Form 1.pdf | 14 Mar 2026 |
| Form 2File: Form 2 30-09-2021 MJP_compressed.pdf | 14 Mar 2026 |
| Form 3File: MJP 30-09-2021 Form 3.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_Disclosure of sold Inventories MJP.pdf | 14 Mar 2026 |
| Form 1File: TCC MJP FORM 1 31-12-2022.PDF | 14 Mar 2026 |
| Form 2File: MJP_Form 2_31-12-2022.PDF | 14 Mar 2026 |
| Form 3File: Form 3_31-12-22.PDF | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_Disclosure of Sold Booked Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: Final Form 1 MJP July To Sep 2023.PDF | 14 Mar 2026 |
| Form 2File: Form -2_30-09-23.PDF | 14 Mar 2026 |
| Form 3File: MJP_Form-3_30-09-2023.PDF | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_Disclosure of sold booked inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: Scan_Form 1_31-12-24.pdf | 14 Mar 2026 |
| Form 2File: Form 2_31-12-24_MJP_compressed.pdf | 14 Mar 2026 |
| Form 3File: Form 3_31-12-24_MJP_compressed.pdf | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventories_MJP.pdf | 14 Mar 2026 |
| Form 1File: Form 1 30-06-2019 MJP.pdf | 14 Mar 2026 |
| Form 2File: Scan Form 2_30-06-2019.pdf | 14 Mar 2026 |
| Form 3File: Form 3 30-06-2019.PDF | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: Form 1 30-09-2019 MJP.pdf | 14 Mar 2026 |
| Form 2File: Scan Form 2 30-09-2019.pdf | 14 Mar 2026 |
| Form 3File: Form 3_30-09-2019.PDF | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: Form 1 31-12-2019 MJP.pdf | 14 Mar 2026 |
| Form 2File: Form 2_31-12-2019.pdf | 14 Mar 2026 |
| Form 3File: Form 3 31-12-2019.PDF | 14 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_MJP.PDF | 14 Mar 2026 |
| Form 1File: Form 1 31-03-2020 MJP.pdf | 14 Mar 2026 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| TRIDEV SAPPHIRE | Tridev Sapphire Trimurti Marg Mulund west Mumbai 400080 | 11 | Completed | Nov 2016 | Nov 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 280 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAHATMA JYOTIBA PHULE CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MULUND EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 299 registered projects within 2 km.
Ekvira and Saishakti
Magnaacasa Infrastructures and Realtors Pr
SENROOFS PHASE - III
PIONEER HOUSING
THE ALTEZZA
M/s. VIPL Varasiddhi Infra Project LLP
SUPREMO PHASE I SALVIA D WING
K V BUILDHOME LLP
SUPREMO PHASE II, WING C known as SAKURA
K V BUILDHOME LLP
Aveza Phase 2
Tata Housing Development Company Limited
See every Mumbai Suburban project, with the district possession charts
Builder: TRIDEVH CONSTRUCTION COMPANY
TRIDEVH CONSTRUCTION COMPANY has 2 registrations on MahaRERA, including NIRMAL PRITI CHS LTD and MAHATMA JYOTIBA PHULE CHS LTD. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MAHATMA JYOTIBA PHULE CHS LTD is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHATMA JYOTIBA PHULE CHS LTD?
The registered promoter entity is TRIDEVH CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHATMA JYOTIBA PHULE CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MAHATMA JYOTIBA PHULE CHS LTD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MAHATMA JYOTIBA PHULE CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHATMA JYOTIBA PHULE CHS LTD?
The professionals named in the filing: Architect: Nitika Gahrana; Architect: Satyendra Thakker; Architect: Amol Jaybhaye; Engineer: Advance Creative Design Consultancy; Chartered Accountant: Himmat Shethia; Chartered Accountant: Malay Furia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHATMA JYOTIBA PHULE CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback