Registered Litigation declared Residential / Group Housing project

MAHALUNGE RIVIERA C WING

By J AND J ASSOCIATES

RG-MH-05734 · RERA P52100056304 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 22.50 crore secured on the land, in favour of THE HDFC BANK LTD

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Basement (if any), 80%
92 of 117Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

MAHALUNGE RIVIERA C WING is a Residential / Group Housing project by J AND J ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100056304 on 25 May 2024. Possession is promised by 31 Mar 2029. 25 of the 117 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameMAHALUNGE RIVIERA C WING
  • TypeResidential / Group Housing
  • Location
    • MAHALUNGE
    • PUNE
    • Mulshi
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056304
  • ReraGenie IDRG-MH-05734

Builder

  • NameJ AND J ASSOCIATES
  • Entity typePartnership
  • PartnersJHALA AND JHALA VENTURES LLP, KAMLESH BAHADURSINH JHALA, MALAV JAYANT SHAH, RAHUL MADAN MENGALE
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects5 →

Key dates

this monthRegisteredMay 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 May 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

21%25 of 117 units booked
56.7%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHALUNGE RIVIERA C WINGNA15131170117

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

MAHALUNGE RIVIERA C WING: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable

Parking filed307

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots307
Closed/Covered287
Open Space20

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area17,919 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTHE HDFC BANK LTD
Secured amountRs 22.50 crore
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Devlopment Authority Pune
Permissible FSI12456.77
Proposed, not sanctioned12,457 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB U BHANDARI PREMISES 1182/13 F C ROAD OPPOSITE LALIT MAHAL HOTEL PUNE 411005
Estimated costRs 32.70 cr
Cost incurredRs 18.53 cr
Work done56.67%
BuildingWingEstimatedIncurred
MAHALUNGE RIVIERA C WINGNARs 30.87 crRs 17.49 cr
-NARs 1.84 crRs 1.04 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash Kulkarni
EngineerKALPESH M HOJAGE
EngineerATUL L DUBAL
Chartered AccountantAmey Joshi
Chartered AccountantAnkur M Mehta
PartnerRole in project
J AND J ASSOCIATES-

Litigation declared2

CaseCourtStatus
SPL C S /0201387/2012/2012CIVIL COURT PUNEHearing
1387/2012CIVIL JUDGEOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE MAHALUNGE MARCH- 2026.PDF17 Apr 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE MHALUNGE MARCH- 2026.PDF17 Apr 2026
Withdrawal Update Form 3File: C A CERTIFICATE MHALUNGE MARCH- 2026.PDF17 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Jan-2026.PDF20 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Jan-2026.PDF20 Jan 2026
Withdrawal Update Form 3File: CA Certificate Jan-2026.PDF20 Jan 2026
Layout approvalFile: 01-06 LAYOUT.pdf17 Dec 2025
Building plan approvalFile: 02-06 BASEMENT PARKING.pdf17 Dec 2025
Building plan approvalFile: 03-06 GROUND PARKING.pdf17 Dec 2025
Building plan approvalFile: 04-06 TYPICAL FLOOR.pdf17 Dec 2025
Building plan approvalFile: 05-06 7TH 12TH 13TH FLOOR.pdf17 Dec 2025
Building plan approvalFile: 06-06 SECTIONS.pdf17 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2A (2).pdf16 Dec 2025
Withdrawal Update Form 1File: ARCHITECT Form 1.PDF18 Oct 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.PDF18 Oct 2025
Withdrawal Update Form 3File: C A CERTIFICATE OCT 25.PDF18 Oct 2025
Form 5 (FY 2024-2025)File: Form-5 MAHALUNGE RIVIERA C WING 2024-2025.PDF30 Sep 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE MAHALUNGE JULY 2025.PDF20 Jul 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE MAHALUNGE JULY 2025.PDF20 Jul 2025
Withdrawal Update Form 3File: Ju0026j_20072025181346.PDF20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT MHALUNGE APRIL 2025.PDF11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MHALUNGE APRIL 2025.PDF11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS MHALUNGE APRIL 2025.PDF11 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER MHALUNGE APRIL 2025.PDF11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MHALUNGE APRIL 2025.PDF11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT MAHALUNGE JAN 25.PDF9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A MHALUNGE JAN 25.PDF9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE MHALUNGE JAN 25.PDF9 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER MAHALUNGE JAN 25.PDF9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A MHALUNGE JAN 25.PDF9 Jan 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Certificate-21-11-2024.PDF22 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate 21-11-2024.PDF22 Nov 2024
Declaration in FORM BFile: Form B 21 - 11 - 2024.PDF22 Nov 2024
CERSAI detailsFile: Declaration-21-11-2024.PDF22 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate 21-11-2024.PDF22 Nov 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance Certificate-21-11-2024.PDF22 Nov 2024
Other - FinanceFile: Mortgage Deed- C Wing-Mahalunge-HDFC Bank Ltd.pdf20 Nov 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE C WING - NOVEMBER 2024.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT MAHALUNGE OCT 2024.PDF15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A MAHALUNGE OCT 2024.PDF15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGNEERS MHALUNGE OCT 2024.PDF15 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING MAHALUNGE OCT 2024.PDF15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A MHALUNGE OCT 2024.PDF15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT MAHALUNGE 6-7-24.PDF7 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS MAHALUNGE JULY 24.PDF7 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGINEERS JULY 2024.PDF7 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING 6-7-2024.PDF7 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A MAHALUNGE JULY 24.PDF7 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Kamlesh Jhala.PDF16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Yash Jhala.PDF16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Alka Jhala.PDF16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Bhoomi Jhala.PDF16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Partnership Deed of Jhala and Jhala Ventures.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: J And J Partnership Deed Aug-2021.pdf16 May 2024
Other - LegalFile: SALE DEED MAHALUNGE RIVIERA.PDF16 May 2024
Other - LegalFile: 7 12 extract of Mahalunge.PDF16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE REVISED.pdf11 May 2024
PAN CardFile: Xerox Scan_10052024154700.PDF10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.PDF9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.PDF9 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPERATE BANK ACCOUNT.PDF9 May 2024
Other - TechnicalFile: RERA NO DECLARATION.PDF9 May 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING (2) (1).pdf9 May 2024
Building plan approvalFile: 2-9 C WING PARKING.pdf8 May 2024
Building plan approvalFile: 3-9 PARKING_compressed.pdf8 May 2024
Building plan approvalFile: 4-9 FIRST TYPICAL FLOOR_compressed.pdf8 May 2024
Building plan approvalFile: 5-9 SEVENTH FLOOR_compressed.pdf8 May 2024
Building plan approvalFile: 6-9 ELEVATION SECTION_compressed.pdf8 May 2024
Details of encumbrances concerned to FinanceFile: 3] Encumbrance Certificate.PDF8 May 2024
Details of encumbrances concerned to FinanceFile: 4] Legal Encumbrance Certificate.PDF8 May 2024
Details of encumbrances concerned to LegalFile: 3] Encumbrance Certificate.PDF8 May 2024
Details of encumbrances concerned to LegalFile: 4] Legal Encumbrance Certificate.PDF8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-9 C WING PARKING.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-9 PARKING_compressed.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-9 FIRST TYPICAL FLOOR_compressed.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-9 SEVENTH FLOOR_compressed.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 6-9 ELEVATION SECTION_compressed.pdf8 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Mahalunge riviera - CC Verification.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER OF INTEREST KAMLESH JHALA.PDF8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER OF INTEREST MALAV SHAH MAHALUNGE.PDF8 May 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MAHALUNGE RIVIERA A1 WINGSR NO 39 1 39 2 40 1 MAHALUNGE TALUKA MULSHI PUNE 41050194CompletedMay 2026Dec 2021
MAHALUNGE RIVIERA B WINGSR NO 39 1 39 2 40 1 MAHALUNGE TALUKA MULSHI PUNE 410501104CompletedJun 2020Feb 2020
MAHALUNGE RIVIERA A WINGSR NO 39 1 39 2 40 1 MAHALUNGE TALUKA MULSHI PUNE 41050170CompletedSep 2017Jul 2017

How this compares with Pune

21%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHALUNGE RIVIERA C WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmMAHALUNGE RIVIERA C WINGCompleted 91Lapsed / revoked 35Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 246 registered projects within 2 km.

Builder: J AND J ASSOCIATES

J and J associates has 3 registrations on MahaRERA, including Mahalunge Riviera and Mahalunge Riviera A1 bldg. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MAHALUNGE RIVIERA C WING is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHALUNGE RIVIERA C WING?

The registered promoter entity is J AND J ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHALUNGE RIVIERA C WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHALUNGE RIVIERA C WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHALUNGE RIVIERA C WING?

The professionals named in the filing: Architect: Prakash Kulkarni; Engineer: KALPESH M HOJAGE; Engineer: ATUL L DUBAL; Chartered Accountant: Amey Joshi; Chartered Accountant: Ankur M Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHALUNGE RIVIERA C WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHALUNGE RIVIERA C WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHALUNGE RIVIERA C WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.