Home / Browse projects / Nagpur, Maharashtra / MAHALAXMI CITY PHASE VI
MAHALAXMI CITY PHASE VI
RG-MH-07644 · RERA P50500045227 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHALAXMI CITY PHASE VI is a Residential / Group Housing project by DADA HOMES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500045227 on 10 May 2022. Possession is promised by 7 Apr 2027.
At a glance
Project
- NameMAHALAXMI CITY PHASE VI
- TypeResidential / Group Housing
- Location
- Koradi Road
- Mahalaxmi City
- Bokhara
- Nagpur (Rural)
- Nagpur
- 441111
- Pincode441111
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500045227
- ReraGenie IDRG-MH-07644
Builder
- NameDADA HOMES PRIVATE LIMITED
- Entity typeCompany
- DirectorDHIRENDRA K GUPTA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 May 2022
- Promised completion7 Apr 2027
- Revised completionNone
- Buildings7 building records
- Documents filed98 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Row House - Grande - Block 16 | NA | 2 | 2 | 0 | 0 | 0 |
| Apartment - Piccolo-Block 17B1 | NA | 8 | 5 | 0 | 0 | 0 |
| Apartment- Piccolo- Block 17B2 | NA | 8 | 4 | 0 | 0 | 0 |
| Apartment - Felicita - Block 17B3 | NA | 8 | 5 | 0 | 0 | 0 |
| Apartment -Felicita -Block 17B4 | NA | 8 | 4 | 0 | 0 | 0 |
| Row House - Grande Executive- Block B21A | NA | 3 | 3 | 0 | 0 | 0 |
| Row House- Grande Executive- Block B21B | NA | 3 | 3 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Slabs of Super Structure, at 85%.
Row House - Grande - Block 1651%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Apartment - Piccolo-Block 17B154%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Apartment- Piccolo- Block 17B253%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Apartment - Felicita - Block 17B349%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Apartment -Felicita -Block 17B448%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Row House - Grande Executive- Block B21A9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Row House- Grande Executive- Block B21B35%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 40% |
| Open Parking | Yes | 0% |
Parking filed76
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Row House - Grande - Block 16 | 8 | 8 |
| Apartment - Piccolo-Block 17B1 | 10 | 10 |
| Apartment- Piccolo- Block 17B2 | 8 | 8 |
| Apartment - Felicita - Block 17B3 | 20 | 20 |
| Apartment -Felicita -Block 17B4 | 16 | 16 |
| Row House - Grande Executive- Block B21A | 7 | 7 |
| Row House- Grande Executive- Block B21B | 7 | 7 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MAHALAXMI CITY PHASE VI | Bokhara | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mahendra T Khambalkar |
| Architect | Saurabh Budhaulia |
| Engineer | Pankaj Arya |
| Chartered Accountant | Anurag Agrawal |
| Chartered Accountant | Nirmal Shah |
| Partner | Role in project |
|---|---|
| DADA HOMES PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 7 Apr 2027
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 20 Apr 2026 |
| Form 2File: Form 2.pdf | 20 Apr 2026 |
| Form 3File: Form 3.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Form 3.pdf | 20 Apr 2026 |
| Form 1File: Form 1.pdf | 20 Jan 2026 |
| Form 2File: Form 2.pdf | 20 Jan 2026 |
| Form 3File: Form 3 .pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Form 3 .pdf | 20 Jan 2026 |
| Form 1File: Form 1.pdf | 20 Oct 2025 |
| Form 2File: Form 2.pdf | 20 Oct 2025 |
| Form 3File: Form 3 .pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 .pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: Final DHPL Form V.pdf | 30 Sep 2025 |
| Form 1File: Arch Certificate Form 1.pdf | 20 Jul 2025 |
| Form 2File: Engineer Certificate Form 2.pdf | 20 Jul 2025 |
| Form 3File: Form 3.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3.pdf | 20 Jul 2025 |
| Form 1File: Arch_DHPL_March-25.pdf | 24 May 2025 |
| Form 2File: Engg_DHPL_March-25.pdf | 24 May 2025 |
| Form 3File: CA_DHPL_March-25.pdf | 24 May 2025 |
| Form 1File: Annexure B_DHPL.pdf | 24 May 2025 |
| Form 2File: Annexure C_DHPL.pdf | 24 May 2025 |
| Form 3File: Annexure D_DHPL.pdf | 24 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf | 4 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep-24.pdf | 4 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate-45227.pdf | 4 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 4 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA_Form_5_DHPL - FY 2023-24.pdf | 25 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June-24.pdf | 11 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Form.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate June-24.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate June-24.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June-24.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf | 11 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Form.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf | 30 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf | 30 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 30 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cerificate.pdf | 30 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 30 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 30 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Dec-23.pdf | 30 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_March-24.pdf | 30 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_JUN23.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_SEP23.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_JUN23.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_SEP23.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_JUN23.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_SEP23.pdf | 2 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate - Form 5 - DHPL_2023.pdf | 8 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_m23.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_m23.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A-22-23.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3-Mar-23.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3_Mar-23.pdf | 11 Oct 2023 |
| OtherFile: DevAggrB16.pdf | 2 Jun 2023 |
| OtherFile: DevAggrB17.pdf | 2 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1ArJune22DHPL.pdf | 11 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1ArSep22DHPL.pdf | 11 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1ArDec22DHPL2.pdf | 11 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2TILL30062022.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2TILL30092022.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2TILL31122022.pdf | 8 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3TILL30062022.pdf | 8 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3TILL30092022.pdf | 8 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3TILL31122022.pdf | 8 May 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 10 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building permit for land__DHPL.pdf | 10 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DHPL_CA Certificate.pdf | 4 May 2022 |
| Copy of the legal title reportFile: Formated Search report Rera.pdf | 30 Apr 2022 |
| Declaration about Commencement CertificateFile: Declaration for commencement certificate.pdf | 30 Apr 2022 |
| Building plan approvalFile: B-16.pdf | 21 Apr 2022 |
| Building plan approvalFile: B-17 1st to 4th.pdf | 21 Apr 2022 |
| Building plan approvalFile: B-17 5th to 7th.pdf | 21 Apr 2022 |
| Building plan approvalFile: B-17 Ground Floor.pdf | 21 Apr 2022 |
| Building plan approvalFile: B-21.pdf | 21 Apr 2022 |
| Layout approvalFile: Layout_compressed.pdf | 21 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf | 21 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: B-16.pdf | 21 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAHALAXMI CITY PHASE VI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mahalaxmi City2,800+ in Nagpur
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Flamingo Residency 1
Hakimi Construction Private Limited
The Bellagio
DADA PROPERTIES PRIVATE LIMITED
Morya Park 3
Moreshwar Narayanrao Bhagat
SILVER VALLEY
JARRY INFRACON
IOSIS GOLD
IOSIS CAPITAL PRIVATE LIMITED
SARASWATI NAGARI - 2
S.S.S ASSOCIATES
See every Nagpur project, with the district possession charts
Builder: DADA HOMES PRIVATE LIMITED
DADA HOMES PRIVATE LIMITED has 1 registration on MahaRERA, including MAHALAXMI CITY PHASE VI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if MAHALAXMI CITY PHASE VI is delayed beyond 7 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHALAXMI CITY PHASE VI?
The registered promoter entity is DADA HOMES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHALAXMI CITY PHASE VI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAHALAXMI CITY PHASE VI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHALAXMI CITY PHASE VI?
The professionals named in the filing: Architect: Mahendra T Khambalkar; Architect: Saurabh Budhaulia; Engineer: Pankaj Arya; Chartered Accountant: Anurag Agrawal; Chartered Accountant: Nirmal Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHALAXMI CITY PHASE VI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback