Home / Browse projects / Nagpur, Maharashtra / Mahalaxmi City Phase V

Completed No litigation declared Residential / Group Housing project

Mahalaxmi City Phase V

By Gruhlaxmi LIfe Space Pvt Ltd

RG-MH-82148 · RERA P50500017428 · Last updated on MahaRERA portal: 7 Feb 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 25 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Mahalaxmi City Phase V is a Residential / Group Housing project by Gruhlaxmi LIfe Space Pvt Ltd in Nagpur, Maharashtra, registered with MahaRERA as P50500017428 on 13 Aug 2018. The registration is recorded completed; possession was promised by 31 Dec 2022. The completion date has moved by 25 months from the original filing.

At a glance

Project

  • NameMahalaxmi City Phase V
  • TypeResidential / Group Housing
  • Location
    • Koradi Road
    • Mahalaxmi City
    • Bokhara
    • Bokhara
    • Nagpur (Rural)
    • Nagpur
    • 441111
  • Pincode441111
  • RERA no.P50500017428
  • ReraGenie IDRG-MH-82148

Builder

  • NameGruhlaxmi LIfe Space Pvt Ltd
  • Entity typeCompany
  • DirectorSantosh Kumar Dixit

Key dates

this monthRegisteredAug 2018First promiseNov 2020Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Aug 2018
  • Promised completion31 Dec 2022
  • Revised completionRevised to 31 Dec 2022 (originally 10 Nov 2020)
  • Buildings2 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block No 17 B4NA90000
Block No17B4NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered2
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
Block No 17 B41910
Block No17B41910

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area590 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mahalaxmi City Phase VBokharaNagpur

Approvals and building plan

Permissible FSI2924.88
Proposed, not sanctioned1,618 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNagpur

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectP GPatkiArchitects
ArchitectAr Saurabh Bhanarkar
ArchitectAr Abhishek Thakur
EngineerMr Pankaj Arya
Chartered AccountantBharat Singhal & Co
PartnerRole in project
Gruhlaxmi LIfe Space Pvt Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500008657Nov 2020 → Nov 2021

Reason as filed by the promoterDear Sir/ Madam, The project is completed except for some minor finishing work and applied for Occupancy certificate but some discrepancies are observed in compliance which is under rectification. We feel regret for delay in execution of the project due to Pandemic COVID-19. With considering the Pandemic situation and shortfall in manpower we request you to kindly grant an extension of one year due to force majeure and do the needful.

EXT50500012037Nov 2020 → Dec 2022

Reason as filed by the promoterRequest for extension under section 7(3) is attached herewith for your kind perusal. Request you to please consider the same and allow extension till 31.12.2022.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Feb 2023

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5- Phase 5- RERA.pdf7 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MLC_79 Unit.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5)File: Form 5- FY 20-21 Phase V.pdf2 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- FY 20-21 Phase V.pdf2 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 MACH 20.pdf20 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 20.pdf20 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 DEC 20.pdf20 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 MACH 20.pdf20 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 Sep 20.pdf20 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A dec 20.pdf20 Aug 2021
Disclosure of sold/ booked inventoryFile: sold unsold.pdf20 Aug 2021
Certificates of CA (Form 3)File: CA March 20.pdf20 Aug 2021
Certificates of CA (Form 3)File: Form 2 Sep 20.pdf20 Aug 2021
Certificates of CA (Form 3)File: CA Dec 20.pdf20 Aug 2021
Certificates of CA (Form 3)File: phase V CA Certificate compressed.pdf18 Aug 2021
Certificates of CA (Form 3)File: CA Phase-V.pdf17 Aug 2021
Declaration about Commencement CertificateFile: Declaration cc RERA 1.pdf16 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Certificate Phase V.pdf16 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase V 1.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A Phase V 1.pdf16 Aug 2021
Annual Audit Report of Statutory CA (Form 5)File: F5P5.pdf30 Sep 2020
OtherFile: PhasevBoM Unit list declaration311019.pdf3 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: P5F5.pdf10 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect Certificate-Phase v- Oct-18.pdf17 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect Certificate-Phase v- Jan-19.pdf17 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer Certificate-Phase v-Oct-18.pdf17 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer Certificate-Phase v.pdf17 Apr 2019
Certificates of CA (Form 3)File: Form 3- CACertificate-Phase v-Oct-18.pdf17 Apr 2019
Certificates of CA (Form 3)File: Form 3- CA Certificate-Phase vJAN19.pdf17 Apr 2019
OtherFile: Undertaking Information for Bank account.pdf17 Apr 2019
OtherFile: SoldunitstatustoBOM29032019.pdf17 Apr 2019
OtherFile: Consent NOC of BoM.pdf17 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Building Permit.pdf6 Aug 2018
Declaration in FORM BFile: Form B - Phase V.pdf6 Aug 2018
Building plan approvalFile: Sanction Building Plan.pdf4 Aug 2018
Layout approvalFile: Sanction Layout Plan.pdf4 Aug 2018
PAN CardFile: PAN of the Company.pdf4 Aug 2018
Copy of the legal title reportFile: Legal Search Report.pdf4 Aug 2018
Details of encumbrancesFile: Self Declaration Phase V.pdf4 Aug 2018
Copy of Layout Approval (in case of layout)File: Sanction Layout Plan.pdf4 Aug 2018
Building Plan Approval (IOD)File: Sanction Building Plan.pdf4 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01-Architect Certificate.pdf4 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02- Engineer Certificate.pdf4 Aug 2018
Certificates of CA (Form 3)File: Form 03- CA Certificate.pdf4 Aug 2018
Proforma of Allotment letterFile: Allotment Letter.pdf4 Aug 2018
Proforma of Allotment letterFile: Draft Agreement to Sale Phase V New.pdf4 Aug 2018

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 25 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahalaxmi City Phase V on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahalaxmi City, Bokhara2,800+ in Nagpur

Builder: Gruhlaxmi LIfe Space Pvt Ltd

Gruhlaxmi LIfe Space Pvt Ltd has 1 registration on MahaRERA, including Mahalaxmi City Phase V. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Mahalaxmi City Phase V is delayed beyond 31 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahalaxmi City Phase V?

The registered promoter entity is Gruhlaxmi LIfe Space Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahalaxmi City Phase V?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Mahalaxmi City Phase V?

The professionals named in the filing: Architect: P GPatkiArchitects; Architect: Ar Saurabh Bhanarkar; Architect: Ar Abhishek Thakur; Engineer: Mr Pankaj Arya; Chartered Accountant: Bharat Singhal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahalaxmi City Phase V?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahalaxmi City Phase V. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahalaxmi City Phase V to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.