Home / Browse projects / Raigarh, Maharashtra / Magnolia Cluster 3

Registered No litigation declared Residential / Group Housing project

Magnolia Cluster 3

By Wadhwa Construction and Infrastructure Private Limited

RG-MH-03444 · RERA P52000021144 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
196 of 616Construction stages doneacross 56 buildings; furthest along: Installation of Lifts, 99%
0 of 1Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

Magnolia Cluster 3 is a Residential / Group Housing project by Wadhwa Construction and Infrastructure Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000021144 on 10 Jun 2019. Possession is promised by 30 Dec 2026. 1 of the 1 unit on this registration is recorded sold or booked, and 196 of 616 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMagnolia Cluster 3
  • TypeResidential / Group Housing
  • Location
    • 36 m wide DP road
    • Wise City
    • Wardoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000021144
  • ReraGenie IDRG-MH-03444

Builder

  • NameWadhwa Construction and Infrastructure Private Limited
  • Entity typeCompany
  • CINU70109MH2000PTC129871
  • GSTIN27AAACW5097J1ZU
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsNavin Amarlal Makhija, Manohar Moolchand Chhabria, Navin Amarlal Makhija, Manohar Moolchand Chhabria
  • Other registrations29 more →
  • Completed7 of 30
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jun 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings56 building records
  • Documents filed146 files

Current status

100%1 of 1 units booked

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Magnolia Cluster 3 - G-22NA33101
Magnolia Cluster 3 - A-42NA30000
Magnolia Cluster 3 - A-36NA30000
Magnolia Cluster 3 - A-37NA30000
Magnolia Cluster 3 - A-38NA30000
Magnolia Cluster 3 - A-39NA30000
Magnolia Cluster 3 - A-40NA30000
Magnolia Cluster 3 - A-41NA30000
Magnolia Cluster 3 - B-09NA30000
Magnolia Cluster 3 - B-15NA30000
Magnolia Cluster 3 - B-10NA30000
Magnolia Cluster 3 - B-11NA30000
Magnolia Cluster 3 - B-12NA30000
Magnolia Cluster 3 - B-13NA30000
Magnolia Cluster 3 - B-14NA30000
Magnolia Cluster 3 - C-09NA30000
Magnolia Cluster 3 - C-15NA30000
Magnolia Cluster 3 - C-10NA30000
Magnolia Cluster 3 - C-11NA30000
Magnolia Cluster 3 - C-12NA30000
Magnolia Cluster 3 - C-13NA30000
Magnolia Cluster 3 - C-14NA30000
Magnolia Cluster 3 - D-07NA30000
Magnolia Cluster 3 - D-08NA30000
Magnolia Cluster 3 - D-09NA30000
Magnolia Cluster 3 - D-10NA30000
Magnolia Cluster 3 - D-11NA30000
Magnolia Cluster 3 - D-12NA30000
Magnolia Cluster 3 - E-11NA30000
Magnolia Cluster 3 - E-12NA30000
Magnolia Cluster 3 - E-13NA30000
Magnolia Cluster 3 - E-14NA30000
Magnolia Cluster 3 - E-15NA30000
Magnolia Cluster 3 - E-16NA30000
Magnolia Cluster 3 - F-16NA30000
Magnolia Cluster 3 - F-17NA30000
Magnolia Cluster 3 - F-18NA30000
Magnolia Cluster 3 - F-19NA30000
Magnolia Cluster 3 - F-20NA30000
Magnolia Cluster 3 - F-15NA30000
Magnolia Cluster 3 - F-21NA30000
Magnolia Cluster 3 - G-16NA30000
Magnolia Cluster 3 - G-17NA30000
Magnolia Cluster 3 - G-18NA30000
Magnolia Cluster 3 - G-19NA30000
Magnolia Cluster 3 - G-20NA30000
Magnolia Cluster 3 - G-15NA30000
Magnolia Cluster 3 - G-21NA30000
Magnolia Cluster 3 - H-15NA30000
Magnolia Cluster 3 - H-16NA30000
Magnolia Cluster 3 - H-17NA30000
Magnolia Cluster 3 - H-18NA30000
Magnolia Cluster 3 - H-14NA30000
Magnolia Cluster 3 - B-16NA30000
Magnolia Cluster 3 - C-16NA30000
Magnolia Cluster 3 - F-22NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 56 buildings; the table lists the first 20.

196 of 616 construction stages are filed complete across 56 buildings. The stage furthest along is Installation of Lifts, at 99%.

Magnolia Cluster 3 - G-2238%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.3%
Magnolia Cluster 3 - A-420%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Magnolia Cluster 3 - A-360%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Magnolia Cluster 3 - A-370%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Magnolia Cluster 3 - A-380%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Magnolia Cluster 3 - A-390%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Magnolia Cluster 3 - A-400%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Magnolia Cluster 3 - A-410%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Magnolia Cluster 3 - B-0962%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Magnolia Cluster 3 - B-1548%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks59%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.8%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.33%
Magnolia Cluster 3 - B-1062%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Magnolia Cluster 3 - B-1156%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.63%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.44%
Magnolia Cluster 3 - B-1256%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.63%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.44%
Magnolia Cluster 3 - B-1353%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises38%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.36%
Magnolia Cluster 3 - B-1453%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises38%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.36%
Magnolia Cluster 3 - C-0952%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%
Magnolia Cluster 3 - C-1544%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises29%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks53%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
Magnolia Cluster 3 - C-1052%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%
Magnolia Cluster 3 - C-1152%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%
Magnolia Cluster 3 - C-1252%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60
BuildingClosed/CoveredTotal
Magnolia Cluster 3 - A-4022
Magnolia Cluster 3 - B-1522
Magnolia Cluster 3 - B-1022
Magnolia Cluster 3 - B-1122
Magnolia Cluster 3 - B-1222
Magnolia Cluster 3 - B-1322
Magnolia Cluster 3 - B-1422
Magnolia Cluster 3 - C-0922
Magnolia Cluster 3 - C-1522
Magnolia Cluster 3 - C-1022
Magnolia Cluster 3 - C-1122
Magnolia Cluster 3 - C-1222
Magnolia Cluster 3 - C-1322
Magnolia Cluster 3 - C-1422
Magnolia Cluster 3 - D-0722
Magnolia Cluster 3 - D-0822
Magnolia Cluster 3 - D-0922
Magnolia Cluster 3 - D-1022
Magnolia Cluster 3 - D-1122
Magnolia Cluster 3 - E-1122
Magnolia Cluster 3 - E-1222
Magnolia Cluster 3 - E-1322
Magnolia Cluster 3 - E-1422
Magnolia Cluster 3 - E-1522
Magnolia Cluster 3 - F-1722
Magnolia Cluster 3 - F-1822
Magnolia Cluster 3 - G-2122
Magnolia Cluster 3 - B-1622
Magnolia Cluster 3 - C-1622
Magnolia Cluster 3 - F-2222

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,825 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Valuable Properties Private LimitedMumbai SuburbanMumbai Suburban

Approvals and building plan

Permissible FSI10442.12
Proposed, not sanctioned7,521 sq m
Buildings approved56
Buildings sanctioned56

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch Crystal Building, 206-221, Waterfield Road, Bandra West, Mumbai, Maharashtra 400050

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVisionary Design Architects
ArchitectHiten Sethi Associates
EngineerS R Estimation
Chartered AccountantGmj & Co.
PartnerRole in project
Wadhwa Construction and Infrastructure Private Limited-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12502447Dipesh Narendra SonareWadhwa Construction and Infrastructure Private Limited17/07/2025
CC12601719RAJESH BALARAMWadhwa Construction and Infrastructure Private Limited25/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Cluster 3.pdf30 Apr 2026
Form 2File: Magnolia Form 2 signed-9-11.pdf30 Apr 2026
Form 3File: Cluster 3.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Cluster 3.pdf30 Apr 2026
Form 1File: FORM 1 Cluster 3.pdf19 Feb 2026
Form 2File: Cluster 2.pdf19 Feb 2026
Form 3File: Cluster 3_260122_165654.pdf19 Feb 2026
Disclosure of Sold and Booked InventoryFile: Cluster 3.pdf19 Feb 2026
Certificates of CA (Form 3)File: CL3 FORM 3 MAR 25.pdf11 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: CL-3.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: CL-3.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CL -3.pdf10 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CL-3 FORM 2 DEC 24.pdf15 Mar 2025
Certificates of CA (Form 3)File: FORM 3 (Dec-24) - Cluster 3 - Final.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAG CL 3.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: MAGNOLIA CL 3 (1).pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Cluster 3.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: cluster 3.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MG-3.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Cluster-3 FY 2023-24.pdf7 Nov 2024
Certificates of CA (Form 3)File: FORM 3 (New Format) - Cluster 3 - Final.pdf6 Nov 2024
Certificates of CA (Form 3)File: FORM 3 (New Format) - Cluster 3 - Final.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAG 3 FORM 2 JUN 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAG 3 FORM 2 SEP 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAG CL-3 MAR -24 FORM 2.pdf14 Oct 2024
Certificates of CA (Form 3)File: FORM 3 (New Format) - Cluster 3 - Final.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CLUSTER 3.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: MAG 3_001.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Cluster 3_001.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cluster 3_001.pdf10 Jul 2024
Certificates of CA (Form 3)File: Cluster 3_001.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: CIuster 3_001.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Cluster 3_001.pdf10 Jun 2024
Certificates of CA (Form 3)File: CLUSTER 3.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cluster 3_001.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cluster 3_001.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cluster-3_001.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cluster 3_001.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P52000021144 - Magnolia C3 (1).pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: cluster 3_001.pdf31 Oct 2023
Certificates of CA (Form 3)File: Cluster 3_001.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cluster 3.pdf3 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Cluster 3.pdf3 May 2023
Disclosure of sold/ booked inventoryFile: Cluster 3.pdf3 May 2023
Disclosure of sold/ booked inventoryFile: Cluster 3.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CIuster 3.pdf11 Apr 2023
Certificates of CA (Form 3)File: Cluster 3.pdf11 Apr 2023
Certificates of CA (Form 3)File: Cluster 3.pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cluster 3.pdf23 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cluster 3.pdf23 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Cluster 3.pdf23 Mar 2023
Disclosure of sold/ booked inventoryFile: Cluster 3.pdf23 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CLUSTER 3.pdf17 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Cluster 3.pdf17 Feb 2023
Disclosure of sold/ booked inventoryFile: Cluster 3.pdf17 Feb 2023
Certificates of CA (Form 3)File: Cluster - 3.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) Cluster 3.pdf30 Jan 2023
Layout approvalFile: 13-01- 2023 -RZ04 - Amended layout final.pdf20 Jan 2023
Layout approvalFile: 13-01- 2023 - RZ04 - Amended layout final.pdf20 Jan 2023
Copy of Layout Approval (in case of layout)File: 13-01- 2023 -RZ04 - Amended layout final.pdf20 Jan 2023
Copy of Layout Approval (in case of layout)File: 13-01- 2023 - RZ04 - Amended layout final.pdf20 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 13-01-2023 - RZ 04 - CCLetter.pdf20 Jan 2023
Layout approvalFile: 2023-01-12 Wadhwa ITP Rev Master Layout.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 2023-01-12 Wadhwa ITP Rev Master Layout.pdf16 Jan 2023
Building plan approvalFile: 2022-08-04 Corner Bungalow D12 E16 Cluster 3.pdf9 Jan 2023
Building plan approvalFile: 2022 07 04 Semi Drtached Typical Unit Plot A50 Cluster 4 and A42 Cluster 3.pdf9 Jan 2023
Building plan approvalFile: 2022 07 04 Semi Drtached Typical Unit Plot B08 Cluster 2 C09 Cluster 3 F14 Cluster 2 G15 C9 Jan 2023
Building plan approvalFile: 2022 07 04 Semi Drtached Typical Unit Plot B09 Cluster 3 C08 Cluster 2 F15 Cluster 3 and G9 Jan 2023
Building plan approvalFile: 2022 07 04 Semi Drtached Typical Unit Plot C01 Cluster 2 and F22 Cluster 3.pdf9 Jan 2023
Building plan approvalFile: 2022 07 04 Semi Drtached Typical Unit Plot F07 Cluster 2 and C16 Cluster 3.pdf9 Jan 2023
Building plan approvalFile: 2022 07 04 Semi Drtached Typical Unit Plot G07 Cluster 2 and B16 Cluster 3.pdf9 Jan 2023
Building plan approvalFile: 2022 07 04 Semi Drtached Typical Unit Plot G22 Cluster 3.pdf9 Jan 2023
Building Plan Approval (IOD)File: 2022 07 04 Semi Drtached Typical Unit Plot A50 Cluster 4 and A42 Cluster 3.pdf9 Jan 2023
Building Plan Approval (IOD)File: 2022 07 04 Semi Drtached Typical Unit Plot B08 Cluster 2 C09 Cluster 3 F14 Cluster 2 G15 C9 Jan 2023
Building Plan Approval (IOD)File: 2022 07 04 Semi Drtached Typical Unit Plot B09 Cluster 3 C08 Cluster 2 F15 Cluster 3 and G9 Jan 2023
Building Plan Approval (IOD)File: 2022 07 04 Semi Drtached Typical Unit Plot C01 Cluster 2 and F22 Cluster 3.pdf9 Jan 2023
Building Plan Approval (IOD)File: 2022 07 04 Semi Drtached Typical Unit Plot F07 Cluster 2 and C16 Cluster 3.pdf9 Jan 2023
Building Plan Approval (IOD)File: 2022 07 04 Semi Drtached Typical Unit Plot G07 Cluster 2 and B16 Cluster 3.pdf9 Jan 2023
Building Plan Approval (IOD)File: 2022 07 04 Semi Drtached Typical Unit Plot G22 Cluster 3.pdf9 Jan 2023
Building Plan Approval (IOD)File: 2022-08-04 Corner Bungalow D12 E16 Cluster 3.pdf9 Jan 2023

How this compares with Raigarh

100%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Magnolia Cluster 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wise City5,900+ in Raigarh

Builder: Wadhwa Construction and Infrastructure Private Limited

Wadhwa Construction and Infrastructure Private Limited has 30 registrations on MahaRERA, including Wise City, South Block Phase I, Plot RZ8 Building 5 Wing D1 and Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Magnolia Cluster 3 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Magnolia Cluster 3?

The registered promoter entity is Wadhwa Construction and Infrastructure Private Limited, a company as per the filing. Its CIN U70109MH2000PTC129871 and GSTIN 27AAACW5097J1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Magnolia Cluster 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Magnolia Cluster 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Magnolia Cluster 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Magnolia Cluster 3?

The professionals named in the filing: Architect: Visionary Design Architects; Architect: Hiten Sethi Associates; Engineer: S R Estimation; Chartered Accountant: Gmj & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Magnolia Cluster 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Magnolia Cluster 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Magnolia Cluster 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.