Home / Browse projects / Pune, Maharashtra / MAGNACITY - Tower A3
MAGNACITY - Tower A3
RG-MH-70667 · RERA P52100052096 · Last updated on MahaRERA portal: 21 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 2 complaints at MahaRERA
- Rs 68.00 crore secured on the land, in favour of HDFC Capital Affordable Real Estate Fund, HDFC Capital affordable Real Estate fund
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAGNACITY - Tower A3 is a Residential / Group Housing project by Malnad Project (I) Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100052096 on 24 Jul 2023. Possession is promised by 31 May 2028. 347 of the 480 units on this registration are recorded sold or booked, and 24 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameMAGNACITY - Tower A3
- TypeResidential / Group Housing
- Location
- Solapur Road
- Manjari
- MANJARI Bk
- Haveli
- Pune
- 412307
- Pincode412307
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052096
- ReraGenie IDRG-MH-70667
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jul 2023
- Promised completion31 May 2028
- Revised completionNone
- Buildings4 building records
- Documents filed93 files
Current status
Figures as on 21 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A3 - Wing A | NA | 33 | 30 | 120 | 0 | 120 |
| A3 - Wing B | NA | 33 | 30 | 120 | 0 | 120 |
| A3 - Wing C | NA | 33 | 30 | 120 | 0 | 120 |
| A3 - Wing D | NA | 33 | 30 | 120 | 0 | 120 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 58%.
A3 - Wing A66%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 46% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 21% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A3 - Wing B66%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A3 - Wing C64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 36% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 12% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A3 - Wing D65%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 12% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed600
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A3 - Wing A | 150 | 150 |
| A3 - Wing B | 150 | 150 |
| A3 - Wing C | 150 | 150 |
| A3 - Wing D | 150 | 150 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 42.29 cr | Rs 18.52 cr |
| A3 - Wing A | NA | Rs 40.12 cr | Rs 21.56 cr |
| A3 - Wing B | NA | Rs 40.12 cr | Rs 21.56 cr |
| A3 - Wing C | NA | Rs 40.12 cr | Rs 19.60 cr |
| A3 - Wing D | NA | Rs 40.12 cr | Rs 19.60 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vishal Deshpande |
| Engineer | Ravindra Kukade |
| Engineer | Suneel Kulkarni |
| Engineer | Amit Nagpure |
| Chartered Accountant | SPAK & Co. |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| Malnad Project (I) Pvt Ltd | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 271/2017 | Civil Judge Senior Division Court | Pending |
| 271/2017 | Civil Judge | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500244 | Ram Gawali | Malnad Project (I) Pvt Ltd | 29/12/2025 |
| SM12600069 | Ram Gawali | Malnad Project (I) Pvt Ltd | 22/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jul 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2028
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A_March 2026_signed copy.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 15 Jan 2026 |
| Building plan approvalFile: 4_250618_A3_Sec-Ele_com.pdf | 2 Dec 2025 |
| Building plan approvalFile: 2_250618_A3_Parking_com.pdf | 2 Dec 2025 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 30 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_MAGNACITY_A3_Signed.pdf | 22 Sep 2025 |
| Layout approvalFile: 1_250618_Sector 1A_Layout.pdf | 19 Jul 2025 |
| Building plan approvalFile: 3_250618_A3_Build pl com.pdf | 19 Jul 2025 |
| Commencement certificateFile: 250618 RS 1 _CC_com.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA certificate.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Cerificate.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MAGNACITY Tower A3_compressed.pdf | 17 Oct 2024 |
| Proforma of Agreement for saleFile: 240812_AFS_R10.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory_compressed.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: MAGNACITY - Tower A3.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240326_Decl about Grievance Redressal Cell.pdf | 26 Mar 2024 |
| Proforma of Agreement for saleFile: 240208_A3_AFS_R8.pdf | 12 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 17 Jan 2024 |
| Proforma of Agreement for saleFile: 231205_AFS_R7.pdf | 3 Jan 2024 |
| Layout approvalFile: 231128_Layout.pdf | 29 Nov 2023 |
| Building plan approvalFile: 231128_Bldg Plan.pdf | 29 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 231128_Layout.pdf | 29 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 231128_Bldg Plan.pdf | 29 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 231128_CC.pdf | 29 Nov 2023 |
| Declaration about Commencement CertificateFile: 231128_Declaration about CC.pdf | 29 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: MAGNACITY - Tower A3_compressed.pdf | 25 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 23 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Oct 2023 |
| Other - LegalFile: 230714_Declaration_Survey No and Plot Area1.pdf | 14 Jul 2023 |
| Copy of the legal title reportFile: 230630_Legal Title Report_Format A.pdf | 30 Jun 2023 |
| Copy of the legal title reportFile: 230630_Legal Title Report_Annex 1-1.pdf | 30 Jun 2023 |
| Copy of the legal title reportFile: 230630_Legal Title Report_Annex 1-2.pdf | 30 Jun 2023 |
| Copy of the legal title reportFile: 230630_Legal Title Report_Annex 1-3.pdf | 30 Jun 2023 |
| Copy of the legal title reportFile: 230630_Legal Title Report_Annex 1-4.pdf | 30 Jun 2023 |
| Building plan approvalFile: 230619_A3_Sec Ele.pdf | 19 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 230619_A3_Sec Ele.pdf | 19 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 230619_CA Certificate.pdf | 19 Jun 2023 |
| Building plan approvalFile: 230612_Building Plan.pdf | 12 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 230612_Building Plan.pdf | 12 Jun 2023 |
| CERSAI detailsFile: 230602_CERSAI_Declaration.pdf | 2 Jun 2023 |
| Proforma of Agreement for saleFile: 230601_AFS_F_R2.pdf | 2 Jun 2023 |
| Layout approvalFile: 4_Layout.pdf | 18 May 2023 |
| Details of encumbrances concerned to FinanceFile: 3_Encubmrance Certificate_Finance.pdf | 18 May 2023 |
| Details of encumbrances concerned to LegalFile: 3_Encubmrance Certificate_Finance.pdf | 18 May 2023 |
| Copy of Layout Approval (in case of layout)File: 4_Layout.pdf | 18 May 2023 |
| Declaration about Commencement CertificateFile: 14_Declaration about CC.pdf | 18 May 2023 |
| Declaration in FORM BFile: 6_Form B_Declaration.pdf | 18 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAGNACITY - Tower A3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Manjari13,700+ in Pune
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
MAGNACITY - Tower A2
Malnad Project (I) Pvt Ltd
Birla Evam Phase 1
Vypak Properties Private Limited
VTP AURELIA PHASE 1
ASOJ REALTY LLP
GODREJ BOULEVARD
Manjari Housing Projects LLP
Godrej Park Springs
Manjari Housing Projects LLP
VTP DOLCE VITA Phase 1
Ashdan Developers Private Limited
Builder: Malnad Project (I) Pvt Ltd
Malnad Project (I) Pvt Ltd has 3 registrations on MahaRERA, including MAGNACITY - Tower A3 and MAGNACITY - Tower A2. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MAGNACITY - Tower A3 is delayed beyond 31 May 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAGNACITY - Tower A3?
The registered promoter entity is Malnad Project (I) Pvt Ltd, a company as per the filing. Its CIN U45100PN2017PTC170130 and GSTIN 27AAGCK5660F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAGNACITY - Tower A3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MAGNACITY - Tower A3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MAGNACITY - Tower A3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAGNACITY - Tower A3?
The professionals named in the filing: Architect: Vishal Deshpande; Engineer: Ravindra Kukade; Engineer: Suneel Kulkarni; Engineer: Amit Nagpure; Chartered Accountant: SPAK & Co.; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAGNACITY - Tower A3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback