Registered No litigation declared Residential / Group Housing project

Magic Meera Heights

By Magic Star Developers

RG-MH-40238 · RERA P51700049394 · Last updated on MahaRERA portal: 21 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 65%
57 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

Magic Meera Heights is a Residential / Group Housing project by Magic Star Developers in Thane, Maharashtra, registered with MahaRERA as P51700049394 on 8 Feb 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 95 of the 152 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMagic Meera Heights
  • TypeResidential / Group Housing
  • Location
    • Mira Road
    • Mira
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049394
  • ReraGenie IDRG-MH-40238

Builder

  • NameMagic Star Developers
  • Entity typePartnership
  • PartnersVikram Pratap Singh, Akhilesh Radhekrishna Singh

Key dates

this monthRegisteredFeb 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed96 files

Current status

62%95 of 152 units booked
82.3%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Magic Meera Heights ,Wing A,B,CNA15131520152

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.

Magic Meera Heights ,Wing A,B,C: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed240

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots240
Open Space240

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,330 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2025
LandownerVillageDistrict
RAJU YASHWANT BHOIRMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation,
Permissible FSI3748.52
Proposed, not sanctioned3,749 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSkyline Co-operative Housing society limited Near St xavier School road mira road E Thane 401107
Estimated costRs 10.00 cr
Cost incurredRs 8.23 cr
Work done82.28%
BuildingWingEstimatedIncurred
Magic Meera Heights ,Wing A,B,CNARs 7.00 crRs 5.76 cr
-NARs 3.00 crRs 2.47 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDinesh N Patel n Patil
EngineerPinak G Mehta G Mehta
Chartered AccountantR D LUKAD D Lukad
Chartered AccountantR D LUKAD & CO
PartnerRole in project
Magic Star Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01012619214Dec 2025 → Dec 2026

Reason as filed by the promoterThe Promoter respectfully submits that the present application for extension of the project completion date up to 31.12.2026 is made under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016, based on the updated PERT Chart Schedule and the balance construction activities required for completion of the project. As per the PERT Chart, balance structural works comprising approximately 15% of superstructure slabs are currently ongoing and are scheduled to be completed by 31.03.2026. Thereafter, internal masonry, plaster, and flooring works are planned between April 2026 and Jun

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf21 Aug 2026
Withdrawal Update Form 2File: Form2.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3 (1).pdf21 Aug 2026
Withdrawal Update Form 1File: FORM 1 MSD MARCH 26.pdf27 Jun 2026
Withdrawal Update Form 2File: Form2.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3 (1).pdf27 Jun 2026
Form 2A (FY 2025-2026)File: Magic Star Form-2A.pdf27 Jun 2026
Form 5 (FY 2025-2026)File: Form 5.pdf26 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf15 Jun 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf15 Jun 2026
Withdrawal Update Form 3File: Form3- Magic.pdf15 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Feb 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf20 Feb 2026
Withdrawal Update Form 3File: form 3- final-1.pdf20 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf6 Feb 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf6 Feb 2026
Withdrawal Update Form 3File: Form-3_compressed.pdf6 Feb 2026
Form 2A (FY 2022-2023)File: FORM -2A (22-23).pdf6 Feb 2026
Form 2A (FY 2023-2024)File: FORM -2A (23-24).pdf6 Feb 2026
Form 2A (FY 2024-2025)File: FORM -2A (24-25).pdf6 Feb 2026
Form 5 (FY 2024-2025)File: Form-5.pdf5 Feb 2026
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf2 Feb 2026
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf2 Feb 2026
Withdrawal Update Form 1File: fORM1.pdf24 Dec 2025
Withdrawal Update Form 2File: fORM 2.pdf24 Dec 2025
Withdrawal Update Form 3File: FORM 3.pdf24 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate March 25.pdf24 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: MSD RERA LETTER.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: magicstar form3.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: magicstar form3 (1).pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MAGIC MEERA- OCT-DEC_compressed.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MSD.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MSD.pdf12 Dec 2024
Layout approvalFile: 1710593515_MBMC-NEW.pdf12 Nov 2024
Building plan approvalFile: 1710593515_MBMC-NEW.pdf12 Nov 2024
Copy of Layout Approval (in case of layout)File: 1710593515_MBMC-NEW.pdf12 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 141 CC NEW_11zon.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 1710593515_MBMC-NEW.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate MSD.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pinak Mehta Engineer Certificate.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MSD.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MSD.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- (JAN TO MARCH-23)_compressed-1.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- (APRIL TO JUNE-23)_compressed.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-(JULY TO SEPT-23)_compressed.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate jan23 to March 23_compressed.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate April 23 to june 23_compressed.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate July to Sept-23_compressed.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jan 23 to March 23.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: April 23 to June 23.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: July 23 to Sep 23.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNUAL REPORT-MAGIC STAR DEVELOPERS_compressed.pdf31 Oct 2023
Proforma of Allotment letterFile: ALLOTMENT.pdf7 Feb 2023
Deviation Report with respect to Allotment letterFile: Allotment-1.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 07_01_2023.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (Magic Star Developers).pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure Bhavna bhoir .pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure brishen Singh .pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure raju bhoir.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure Vikram singh.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure Akhilesh Singh.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure bhausaheb kale.pdf20 Jan 2023
Other - TechnicalFile: architect certificate 7_01_23.pdf20 Jan 2023
Declaration about Commencement CertificateFile: Declaration about commencent certificate.pdf13 Jan 2023
Details of encumbrances concerned to FinanceFile: Self Declaration regarding encumbrance.pdf27 Dec 2022
Details of encumbrances concerned to LegalFile: Self Declaration regarding encumbrance.pdf27 Dec 2022
Other - LegalFile: SALE DEED ( 1 TO 20)_compressed.pdf27 Dec 2022
Other - LegalFile: SALE DEED (21 TO 40 )_compressed.pdf27 Dec 2022
Other - LegalFile: SALE DEED (41 TO 60)_compressed.pdf27 Dec 2022
Other - LegalFile: SALE DEED (61 TO 90 )_compressed.pdf27 Dec 2022
Other - LegalFile: magic star_compressed.pdf27 Dec 2022
Other - LegalFile: Magic Star Deve 7 , 12.pdf26 Dec 2022
Proforma of Agreement for saleFile: RERA AGREEMENT DRAFT.pdf21 Dec 2022
Details of encumbrances concerned to FinanceFile: self Declaration regarding encumbrance (1).pdf17 Dec 2022

How this compares with Thane

62%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Magic Meera Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira7,600+ in Thane

2 kmMagic Meera HeightsCompleted 84Lapsed / revoked 60Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 221 registered projects within 2 km.

Builder: Magic Star Developers

Magic Star Developers has 1 registration on MahaRERA, including Magic Meera Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Magic Meera Heights is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Magic Meera Heights?

The registered promoter entity is Magic Star Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Magic Meera Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Magic Meera Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Magic Meera Heights?

The professionals named in the filing: Architect: Dinesh N Patel n Patil; Engineer: Pinak G Mehta G Mehta; Chartered Accountant: R D LUKAD D Lukad; Chartered Accountant: R D LUKAD & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Magic Meera Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Magic Meera Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Magic Meera Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.