ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Madhuvan 6 76D

Registration lapsed No litigation declared Residential / Group Housing project

Madhuvan 6 76D

By Magarpatta City Development Company Pvt. Ltd.

RG-MH-16244 · RERA P52100025448 · Last updated on MahaRERA portal: 4 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Madhuvan 6 76D is a Residential / Group Housing project by Magarpatta City Development Company Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100025448 on 30 May 2020. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameMadhuvan 6 76D
  • TypeResidential / Group Housing
  • Location
    • Mohammadwadi
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025448
  • ReraGenie IDRG-MH-16244

Builder

  • NameMagarpatta City Development Company Pvt. Ltd.
  • Entity typeCompany
  • DirectorsSatish Dattatray Magar, Umesh Dattatray Magar
  • Declared earlier projects1 →

Key dates

22 months past promisethis monthRegisteredMay 2020PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on30 May 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA160000
BNA160000
CNA160000
DNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 4 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
A11
B11
C11
D11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sable Construction CompanySwargatePune

Approvals and building plan

Permissible FSI18804.24
Proposed, not sanctioned18,804 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch13 Solapur Bazar Road Off East Street Poolgate Pune 411001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Magarpatta City Development Company Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2025

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certificate - 31 January 2025.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024 Sable Construction Co.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jan 2025.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Dec 2024.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024 Sable Construction co.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Oct 2024.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jun 2024 Sable Construction.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jun 2024.pdf18 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC - 8 August 2024.pdf18 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certificate- 11 September 2024.pdf18 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certiifcate -26 Jun 2024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold booked inventory - Jun 2024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - September 2024.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 March 2024 Sable Construction.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2024.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - March 2024.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - December 2023.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - December 2023 sable constrution co.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Dec 2023.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - September 2023.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Sable construction.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - September.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - August.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Sable construction.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2023 MP.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2023.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A March 2023.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - March 2023.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - June 2023.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory - September 2022.pdf17 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory- December 2022.pdf17 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory - June 2022.pdf29 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2022.pdf20 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory 1.pdf20 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Dec 21.pdf19 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Sept 2021.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold-booked inventory.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - June 2021.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - March 2021.pdf8 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A - December 2020.pdf6 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - September 2020.pdf22 Oct 2020
Layout approvalFile: 1-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 2-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 3-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 4-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 5-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 6-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 7-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 8-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 9-10-76D_compressed.pdf6 May 2020
Building plan approvalFile: 10-10-76D_compressed.pdf6 May 2020
PAN CardFile: Pan card - Magarpatta City Dev.pdf6 May 2020
PAN CardFile: Pan card - Sable Construction Co.pdf6 May 2020
Copy of the legal title reportFile: Search Reports.pdf6 May 2020
Details of encumbrancesFile: Encumbrance Certificate.pdf6 May 2020
Copy of Layout Approval (in case of layout)File: 1-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 2-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 3-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 4-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 5-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 6-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 7-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 8-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 9-10-76D_compressed.pdf6 May 2020
Building Plan Approval / NA Order for plotted developmentFile: 10-10-76D_compressed.pdf6 May 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Layout.pdf6 May 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Buildings.pdf6 May 2020
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf6 May 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NOVA ApartmentsS No 71 15 71 16 Mundhwa Pune96CompletedFeb 2022Feb 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Madhuvan 6 76D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mohammadwadi13,700+ in Pune

2 kmMadhuvan 6 76DCompleted 5Lapsed / revoked 3Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: Magarpatta City Development Company Pvt. Ltd.

Magarpatta City Development Company Pvt. Ltd. has 1 registration on MahaRERA, including Madhuvan 6 76D. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Madhuvan 6 76D shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Madhuvan 6 76D is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Madhuvan 6 76D?

The registered promoter entity is Magarpatta City Development Company Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Madhuvan 6 76D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Madhuvan 6 76D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Madhuvan 6 76D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Madhuvan 6 76D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Madhuvan 6 76D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.