ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / MADHUSUDAN BUILDING

Registered No litigation declared Residential / Group Housing project

MADHUSUDAN BUILDING

By MADHUSUDAN BUILDCON

RG-MH-22900 · RERA P51700035033 · Last updated on MahaRERA portal: 2 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
1 of 11Construction stages donefurthest along: Installation of Lifts, 30%
13 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

MADHUSUDAN BUILDING is a Residential / Group Housing project by MADHUSUDAN BUILDCON in Thane, Maharashtra, registered with MahaRERA as P51700035033 on 29 Apr 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 0 of the 13 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameMADHUSUDAN BUILDING
  • TypeResidential / Group Housing
  • Location
    • KANSAI SECTION
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700035033
  • ReraGenie IDRG-MH-22900

Builder

  • NameMADHUSUDAN BUILDCON
  • Entity typePartnership
  • PartnersMAKARAND MADHUSUDAN KHARE, VIJAY MADHUSUDAN KHARE

Key dates

this monthRegisteredApr 2022First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed112 files

Current status

0%0 of 13 units booked
17.2%Work done, per cost certificate

Figures as on 2 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MADHUSUDAN APARTMENTNA8812113

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 30%.

MADHUSUDAN APARTMENT: 17% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor1%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 2 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes25%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes50%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered1
Open Space6

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area581 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Sep 2025

Approvals and building plan

Sanctioning authorityAmbarnath Planning Authority
Permissible FSI783.34
Proposed, not sanctioned783 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMEGHDOOT PLOT NO 236 SHIV MANDIR ROAD AMBARNATH E
Estimated costRs 2.04 cr
Cost incurredRs 35.00 lakh
Work done17.16%
BuildingWingEstimatedIncurred
MADHUSUDAN APARTMENTNARs 1.99 crRs 35.00 lakh
-NARs 5.00 lakh-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOHAR M WALIMBE
EngineerPRAMOD KAMBLE
EngineerVivek Khare
EngineerSujit Gajanan Thakur
Chartered AccountantKUMUDINI P CHAVAN
Chartered AccountantRahul balu Bhadange
Chartered AccountantHitesh Vijay Chawla
Chartered AccountantNarendra Prajapati
PartnerRole in project
MADHUSUDAN BUILDCON-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700027771Dec 2023 → Dec 2026

Reason as filed by the promoterDue to financial difficulty and due to non booking of units unable to complete the project within time

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf2 Sep 2025
Form 2A (FY 2023-2024)File: form 2A 23-24.pdf2 Sep 2025
Form 2A (FY 2024-2025)File: form 2A 23-24.pdf2 Sep 2025
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf2 Sep 2025
Form 1File: Form 1.pdf5 Aug 2025
Form 2File: Form 2.pdf5 Aug 2025
Form 3File: Form 3.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Mar 2025.pdf5 Aug 2025
Form 1File: Form 1 31122024.pdf2 Aug 2025
Form 2File: Form 2 31122024.pdf2 Aug 2025
Form 3File: Form 3 31122024.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Dec 2024.pdf2 Aug 2025
Form 5 (FY 2022-2023)File: FY 2022-2023.pdf2 Aug 2025
Form 5 (FY 2023-2024)File: FY 2023-2024.pdf2 Aug 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 24-25.pdf2 Aug 2025
Form 1File: Form 1 30062022.pdf1 Aug 2025
Form 2File: Form 2 30062022.pdf1 Aug 2025
Form 3File: Form 3 30-06-22.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories June 22.pdf1 Aug 2025
Form 1File: Form 1 30092022.pdf1 Aug 2025
Form 2File: Form 2 30092022.pdf1 Aug 2025
Form 3File: Form 3 30-09-22.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Sep 22.pdf1 Aug 2025
Form 1File: Form 1 31122022.pdf1 Aug 2025
Form 2File: Form 2 31122022.pdf1 Aug 2025
Form 3File: Form 3 31-12-22.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Dec 2022.pdf1 Aug 2025
Form 1File: Form 1 31032023.pdf1 Aug 2025
Form 2File: Form 2 31032023.pdf1 Aug 2025
Form 3File: Form 3 31-03-23.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories March 2023.pdf1 Aug 2025
Form 1File: Form 1 30062023.pdf1 Aug 2025
Form 2File: Form 2 30062023.pdf1 Aug 2025
Form 3File: Form 3 30062023.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories June 2023.pdf1 Aug 2025
Form 1File: Form 1 30092023.pdf1 Aug 2025
Form 2File: Form 2 30092023.pdf1 Aug 2025
Form 3File: Form 3 30092023.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Sep 2023.pdf1 Aug 2025
Form 1File: Form 1 31122023.pdf1 Aug 2025
Form 2File: Form 2 31122023.pdf1 Aug 2025
Form 3File: Form 3 30122023.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Dec 2023.pdf1 Aug 2025
Form 1File: Form 1 31032024.pdf1 Aug 2025
Form 2File: Form 2 31032024.pdf1 Aug 2025
Form 3File: Form 3 31-03-24.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories March 2024.pdf1 Aug 2025
Form 1File: Form 1 30062024.pdf1 Aug 2025
Form 2File: Form 2 30062024.pdf1 Aug 2025
Form 3File: Form 3 30062024.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories June 2024.pdf1 Aug 2025
Form 1File: Form 1 30092024.pdf1 Aug 2025
Form 2File: Form 2 30092024.pdf1 Aug 2025
Form 3File: Form 3 30092024.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Sep 2024.pdf1 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf28 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf3 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf3 Apr 2025
Declaration in FORM BFile: Form B.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf2 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf2 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Madhusudan Buildcon.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-9-2022.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2022.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-3-2023.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-6-2023.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-9-2023.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2023.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-6-2024.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-9-2024.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-6-2022.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-06-2022.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-09-2022.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-2022.pdf27 Dec 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MADHUSUDAN BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANSAI SECTION7,600+ in Thane

2 kmMADHUSUDAN BUILDINGCompleted 78Lapsed / revoked 39Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 184 registered projects within 2 km.

Builder: MADHUSUDAN BUILDCON

MADHUSUDAN BUILDCON has 1 registration on MahaRERA, including MADHUSUDAN BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MADHUSUDAN BUILDING is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MADHUSUDAN BUILDING?

The registered promoter entity is MADHUSUDAN BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MADHUSUDAN BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MADHUSUDAN BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MADHUSUDAN BUILDING?

The professionals named in the filing: Architect: MANOHAR M WALIMBE; Engineer: PRAMOD KAMBLE; Engineer: Vivek Khare; Engineer: Sujit Gajanan Thakur; Chartered Accountant: KUMUDINI P CHAVAN; Chartered Accountant: Rahul balu Bhadange. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MADHUSUDAN BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MADHUSUDAN BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MADHUSUDAN BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.