Home / Browse projects / Thane, Maharashtra / MADHUSUDAN BUILDING
MADHUSUDAN BUILDING
RG-MH-22900 · RERA P51700035033 · Last updated on MahaRERA portal: 2 Sep 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MADHUSUDAN BUILDING is a Residential / Group Housing project by MADHUSUDAN BUILDCON in Thane, Maharashtra, registered with MahaRERA as P51700035033 on 29 Apr 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 0 of the 13 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameMADHUSUDAN BUILDING
- TypeResidential / Group Housing
- Location
- KANSAI SECTION
- Ambarnath(M Cl)
- Ambarnath
- Thane
- 421501
- Pincode421501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700035033
- ReraGenie IDRG-MH-22900
Builder
- NameMADHUSUDAN BUILDCON
- Entity typePartnership
- PartnersMAKARAND MADHUSUDAN KHARE, VIJAY MADHUSUDAN KHARE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Apr 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed112 files
Current status
Figures as on 2 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MADHUSUDAN APARTMENT | NA | 8 | 8 | 12 | 1 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 30%.
MADHUSUDAN APARTMENT: 17% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 1% |
| Slabs of Super Structure | 6% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 2 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 50% |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MADHUSUDAN APARTMENT | NA | Rs 1.99 cr | Rs 35.00 lakh |
| - | NA | Rs 5.00 lakh | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANOHAR M WALIMBE |
| Engineer | PRAMOD KAMBLE |
| Engineer | Vivek Khare |
| Engineer | Sujit Gajanan Thakur |
| Chartered Accountant | KUMUDINI P CHAVAN |
| Chartered Accountant | Rahul balu Bhadange |
| Chartered Accountant | Hitesh Vijay Chawla |
| Chartered Accountant | Narendra Prajapati |
| Partner | Role in project |
|---|---|
| MADHUSUDAN BUILDCON | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to financial difficulty and due to non booking of units unable to complete the project within time
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed112
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf | 2 Sep 2025 |
| Form 2A (FY 2023-2024)File: form 2A 23-24.pdf | 2 Sep 2025 |
| Form 2A (FY 2024-2025)File: form 2A 23-24.pdf | 2 Sep 2025 |
| Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf | 2 Sep 2025 |
| Form 1File: Form 1.pdf | 5 Aug 2025 |
| Form 2File: Form 2.pdf | 5 Aug 2025 |
| Form 3File: Form 3.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Mar 2025.pdf | 5 Aug 2025 |
| Form 1File: Form 1 31122024.pdf | 2 Aug 2025 |
| Form 2File: Form 2 31122024.pdf | 2 Aug 2025 |
| Form 3File: Form 3 31122024.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Dec 2024.pdf | 2 Aug 2025 |
| Form 5 (FY 2022-2023)File: FY 2022-2023.pdf | 2 Aug 2025 |
| Form 5 (FY 2023-2024)File: FY 2023-2024.pdf | 2 Aug 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 24-25.pdf | 2 Aug 2025 |
| Form 1File: Form 1 30062022.pdf | 1 Aug 2025 |
| Form 2File: Form 2 30062022.pdf | 1 Aug 2025 |
| Form 3File: Form 3 30-06-22.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories June 22.pdf | 1 Aug 2025 |
| Form 1File: Form 1 30092022.pdf | 1 Aug 2025 |
| Form 2File: Form 2 30092022.pdf | 1 Aug 2025 |
| Form 3File: Form 3 30-09-22.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Sep 22.pdf | 1 Aug 2025 |
| Form 1File: Form 1 31122022.pdf | 1 Aug 2025 |
| Form 2File: Form 2 31122022.pdf | 1 Aug 2025 |
| Form 3File: Form 3 31-12-22.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Dec 2022.pdf | 1 Aug 2025 |
| Form 1File: Form 1 31032023.pdf | 1 Aug 2025 |
| Form 2File: Form 2 31032023.pdf | 1 Aug 2025 |
| Form 3File: Form 3 31-03-23.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories March 2023.pdf | 1 Aug 2025 |
| Form 1File: Form 1 30062023.pdf | 1 Aug 2025 |
| Form 2File: Form 2 30062023.pdf | 1 Aug 2025 |
| Form 3File: Form 3 30062023.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories June 2023.pdf | 1 Aug 2025 |
| Form 1File: Form 1 30092023.pdf | 1 Aug 2025 |
| Form 2File: Form 2 30092023.pdf | 1 Aug 2025 |
| Form 3File: Form 3 30092023.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Sep 2023.pdf | 1 Aug 2025 |
| Form 1File: Form 1 31122023.pdf | 1 Aug 2025 |
| Form 2File: Form 2 31122023.pdf | 1 Aug 2025 |
| Form 3File: Form 3 30122023.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Dec 2023.pdf | 1 Aug 2025 |
| Form 1File: Form 1 31032024.pdf | 1 Aug 2025 |
| Form 2File: Form 2 31032024.pdf | 1 Aug 2025 |
| Form 3File: Form 3 31-03-24.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories March 2024.pdf | 1 Aug 2025 |
| Form 1File: Form 1 30062024.pdf | 1 Aug 2025 |
| Form 2File: Form 2 30062024.pdf | 1 Aug 2025 |
| Form 3File: Form 3 30062024.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories June 2024.pdf | 1 Aug 2025 |
| Form 1File: Form 1 30092024.pdf | 1 Aug 2025 |
| Form 2File: Form 2 30092024.pdf | 1 Aug 2025 |
| Form 3File: Form 3 30092024.pdf | 1 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventories Sep 2024.pdf | 1 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf | 28 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf | 3 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf | 3 Apr 2025 |
| Declaration in FORM BFile: Form B.pdf | 2 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 2 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf | 2 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf | 2 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024.pdf | 13 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Madhusudan Buildcon.pdf | 13 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 13 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-9-2022.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2022.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-3-2023.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-6-2023.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-9-2023.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2023.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-6-2024.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-9-2024.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-6-2022.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-06-2022.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-09-2022.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-2022.pdf | 27 Dec 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 112 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MADHUSUDAN BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANSAI SECTION7,600+ in Thane
Filed coordinates, straight-line distance. 184 registered projects within 2 km.
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: MADHUSUDAN BUILDCON
MADHUSUDAN BUILDCON has 1 registration on MahaRERA, including MADHUSUDAN BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MADHUSUDAN BUILDING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MADHUSUDAN BUILDING?
The registered promoter entity is MADHUSUDAN BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MADHUSUDAN BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MADHUSUDAN BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MADHUSUDAN BUILDING?
The professionals named in the filing: Architect: MANOHAR M WALIMBE; Engineer: PRAMOD KAMBLE; Engineer: Vivek Khare; Engineer: Sujit Gajanan Thakur; Chartered Accountant: KUMUDINI P CHAVAN; Chartered Accountant: Rahul balu Bhadange. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MADHUSUDAN BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback