Home / Browse projects / Nandurbar, Maharashtra / MADHUBAN RESIDENCY

Completed No litigation declared Residential / Group Housing project

MADHUBAN RESIDENCY

By INFINITY HEIGHTS PVT LIMITED

RG-MH-09232 · RERA P49700014888 · Last updated on MahaRERA portal: 4 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nandurbar registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
540 of 660Construction stages doneacross 60 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

MADHUBAN RESIDENCY is a Residential / Group Housing project by INFINITY HEIGHTS PVT LIMITED in Nandurbar, Maharashtra, registered with MahaRERA as P49700014888 on 9 Jan 2018. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameMADHUBAN RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • NANDURBAR
    • 425412
  • Pincode425412
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49700014888
  • ReraGenie IDRG-MH-09232

Builder

  • NameINFINITY HEIGHTS PVT LIMITED
  • Entity typeCompany
  • DirectorsGUNJAN MAHENDRA SHAH, MAHENDRA LAXMANDAS SHAH

Key dates

this monthRegisteredJan 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Jan 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings60 building records
  • Documents filed122 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO 28NA10000
ROW HOUSE NO 29NA10000
ROW HOUSE NO 30NA10000
ROW HOUSE NO 31NA10000
ROW HOUSE NO 32NA10000
ROW HOUSE NO 33NA10000
ROW HOUSE NO 34NA10000
ROW HOUSE NO 35NA10000
ROW HOUSE NO 36NA10000
ROW HOUSE NO 37NA10000
ROW HOUSE NO 38NA10000
ROW HOUSE NO 39NA10000
ROW HOUSE NO 40NA10000
ROW HOUSE NO 41NA10000
ROW HOUSE NO 42NA10000
ROW HOUSE NO 43NA10000
ROW HOUSE NO 44NA10000
ROW HOUSE NO 45NA10000
ROW HOUSE NO 50NA10000
ROW HOUSE NO 51NA10000
ROW HOUSE NO 52NA10000
ROW HOUSE NO 53NA10000
ROW HOUSE NO 54NA10000
ROW HOUSE NO 1NA10000
ROW HOUSE NO 55NA10000
ROW HOUSE NO 56NA10000
ROW HOUSE NO 57NA10000
ROW HOUSE NO 58NA10000
ROW HOUSE NO 59NA10000
ROW HOUSE NO 2NA20000
ROW HOUSE NO 3NA20000
ROW HOUSE NO 4NA20000
ROW HOUSE NO 5NA20000
ROW HOUSE NO 6NA20000
ROW HOUSE NO 7NA20000
ROW HOUSE NO 8NA20000
ROW HOUSE NO 9NA20000
ROW HOUSE NO 10NA20000
ROW HOUSE NO 11NA20000
ROW HOUSE NO 12NA20000
ROW HOUSE NO 13NA20000
ROW HOUSE NO 14NA20000
ROW HOUSE NO 15NA20000
ROW HOUSE NO 16NA20000
ROW HOUSE NO 17NA20000
ROW HOUSE NO 18NA20000
ROW HOUSE NO 19NA20000
ROW HOUSE NO 20NA20000
ROW HOUSE NO 21NA20000
ROW HOUSE NO 22NA20000
ROW HOUSE 23NA20000
ROW HOUSE NO 24NA20000
ROW HOUSE NO 25NA20000
ROW HOUSE NO 26NA20000
ROW HOUSE NO 27NA20000
ROW HOUSE NO 46NA20000
ROW HOUSE NO 47NA20000
ROW HOUSE NO 48NA20000
ROW HOUSE NO 49NA20000
ROW HOUSE NO 60NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 4 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 60 buildings; the table lists the first 20.

540 of 660 construction stages are filed complete across 60 buildings. The stage furthest along is Podiums (if any), at 0%.

ROW HOUSE NO 2882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 2982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 3982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 4082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 4182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 4282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 4382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 4482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 4582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 5082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 5182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,129 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7128.79
Proposed, not sanctioned7,129 sq m
Buildings approved60
Buildings sanctioned60

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAHILYA BAG VIHIR, NANDURBAR

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEGHANA M SHAH
EngineerPRAKASH M PATEL
PartnerRole in project
INFINITY HEIGHTS PVT LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Oct 2023

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final OC - Uploaded.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate FY 17-18.pdf29 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate FY 18-19.pdf29 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate FY 19-20.pdf29 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate FY 17-18.pdf29 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate FY 18-19.pdf29 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate FY 19-20.pdf29 Jul 2023
Certificates of CA (Form 3)File: Infinity CA certificate Mar'18.pdf29 Jul 2023
Certificates of CA (Form 3)File: Infinity CA certificate Mar'19.pdf29 Jul 2023
Certificates of CA (Form 3)File: Infinity CA Certificate Mar'19 till oc.pdf29 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: RERA Audit Working 2017-18.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA Audit Report FY 2018-19.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Audit Report FY 2019-20.pdf24 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf9 Mar 2023
Building plan approvalFile: PLAN1 (1).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (2).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (3).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (4).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (5).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (6).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (7).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (8).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (9).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (10).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (11).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (12).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (13).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (14).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (15).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (16).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (17).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (18).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (19).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (20).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (21).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (22).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (23).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (24).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (25).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (26).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (27).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (28).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (29).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (30).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (31).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (32).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (33).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (34).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (35).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (36).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (37).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (38).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (39).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (40).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (41).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (42).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (43).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (44).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (45).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (46).pdf29 Dec 2017
Building plan approvalFile: PLAN1 (47).pdf29 Dec 2017
Copy of the legal title reportFile: Title report.pdf29 Dec 2017
Details of encumbrancesFile: no encumbrance.pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (1).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (2).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (3).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (4).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (5).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (6).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (7).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (8).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (9).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (10).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (11).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (12).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (13).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (14).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (15).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (16).pdf29 Dec 2017
Building Plan Approval (IOD)File: PLAN1 (17).pdf29 Dec 2017

Keep MADHUBAN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NANDURBAR17 in Nandurbar

Builder: INFINITY HEIGHTS PVT LIMITED

INFINITY HEIGHTS PVT LIMITED has 1 registration on MahaRERA, including MADHUBAN RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nandurbar district page.

Frequently asked questions

What are my rights if MADHUBAN RESIDENCY is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MADHUBAN RESIDENCY?

The registered promoter entity is INFINITY HEIGHTS PVT LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MADHUBAN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MADHUBAN RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MADHUBAN RESIDENCY?

The professionals named in the filing: Architect: MEGHANA M SHAH; Engineer: PRAKASH M PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MADHUBAN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MADHUBAN RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MADHUBAN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.