Home / Browse projects / Nandurbar, Maharashtra / Ashtavinayak Residency

De-registered No litigation declared Others project

Ashtavinayak Residency

By Yogesh Pramodshankar Desai

RG-MH-90501 · RERA P49700056003 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • De-registered
  • Rs 8.00 crore secured on the land, in favour of THE HASTI CO OPERATIVE BANK LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nandurbar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
16 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 84%
92 of 92Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Ashtavinayak Residency is a Others project by Yogesh Pramodshankar Desai in Nandurbar, Maharashtra, registered with MahaRERA as P49700056003 on 6 May 2024. Possession is promised by 31 Dec 2028. 0 of the 92 units on this registration are recorded sold or booked, and 16 of 55 construction stages are filed complete.

At a glance

Project

  • NameAshtavinayak Residency
  • TypeOthers
  • Location
    • Yogi Nagar
    • S. No. 273/1
    • Bypass Road
    • Behind Chhatrapati Hospital
    • Nandurbar
    • Nandurbar (M Cl)
    • Nandurbar
    • 425412
  • Pincode425412
  • RERA no.P49700056003
  • ReraGenie IDRG-MH-90501

Builder

  • NameYogesh Pramodshankar Desai
  • Entity typeIndividual

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on6 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed87 files

Current status

0%0 of 92 units booked
43.5%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ashtavinayak Residency Building ANA5510717
Ashtavinayak Residency Building BNA5510515
Ashtavinayak Residency Building CNA5510515
Ashtavinayak Residency Building DNA5510515
Ashtavinayak Residency Building ENA44161430

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 84%.

Ashtavinayak Residency Building A54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises84%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ashtavinayak Residency Building B46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ashtavinayak Residency Building C41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ashtavinayak Residency Building D27%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ashtavinayak Residency Building E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Closed/Covered17
Open Space79
BuildingClosed/CoveredOpen SpaceTotal
Ashtavinayak Residency Building A21416
Ashtavinayak Residency Building B31215
Ashtavinayak Residency Building C31215
Ashtavinayak Residency Building D31215
Ashtavinayak Residency Building E62935

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,799 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTHE HASTI CO OPERATIVE BANK LTD
Secured amountRs 8.00 crore
CERSAI search filedYes
Declared on14 Jun 2025
LandownerVillageDistrict
Alkaben Yogesh DesaiNandurbar (M Cl)Nandurbar

Approvals and building plan

Sanctioning authorityThe Office Of Munciple Coorporation of Nandurbar
Permissible FSI5988.01
Proposed, not sanctioned5,988 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPardeshipura, Near Nagar Parishad Office, Nandurbar, Maharashtra 425412
Estimated costRs 7.90 cr
Cost incurredRs 3.43 cr
Work done43.47%
BuildingWingEstimatedIncurred
Ashtavinayak Residency Building ENARs 2.62 cr-
Ashtavinayak Residency Building ANARs 1.28 crRs 1.22 cr
Ashtavinayak Residency Building BNARs 1.28 crRs 1.12 cr
Ashtavinayak Residency Building CNARs 1.28 crRs 82.17 lakh
Ashtavinayak Residency Building DNARs 1.28 crRs 27.50 lakh
-NARs 15.22 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMeghna Ravindra Pardeshi
EngineerShaikh Tanveer Shaikh Gaffar
Chartered AccountantNarendra Agrawal & Associates
Chartered AccountantKshitija Pritesh Agrawal
Chartered AccountantKrushna Rajkumar Gandhi
Chartered AccountantJAYESH R AGARWAL
PartnerRole in project
Yogesh Pramodshankar Desai-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration and undertaking (Annexure A)File: SELF DECLARATION.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf18 Apr 2026
Withdrawal Update Form 3File: Merged pdf.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3_merged.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate.pdf19 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineeru0027s Certificate.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf19 Oct 2025
Form 5 (FY 2024-2025)File: Form -5 (2)_merged (1).pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf19 Apr 2025
Details of encumbrances concerned to FinanceFile: Mutation Entry No 60525 Hasti Bank Mortgage Rs 8 Crore.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (1).pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Schedule.pdf21 Jan 2025
Details of encumbrances concerned to LegalFile: Mutation Entry No 60525 Hasti Bank Mortgage Rs 8 Crore.pdf21 Jan 2025
Other - TechnicalFile: Index 2 - Declaration Deed 20-09-2024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf20 Oct 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrance finance.pdf20 Jul 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrance finance.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineers Certificate for Quality Assurance.pdf20 Jul 2024
CERSAI detailsFile: CERSAI Report.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf20 Jul 2024
Copy of the legal title reportFile: MOU Yogesh Desai and Alka Desai.pdf10 Apr 2024
Other - LegalFile: MOU Yogesh Desai and Alka Desai.pdf10 Apr 2024
Other - LegalFile: CC.pdf10 Apr 2024
Other - LegalFile: 273-1 CDM to AYD Deed.pdf15 Mar 2024
Other - LegalFile: 273-1 Deed PND 10per later_compressed.pdf15 Mar 2024
Other - LegalFile: Original Deed 273-1_compressed.pdf15 Mar 2024
Other - LegalFile: Vatani Patra - Notarised Signed_compressed.pdf15 Mar 2024
Other - LegalFile: 7-12 27-30 63-73_compressed.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised CA cert for uploading_compressed.pdf14 Mar 2024
Other - LegalFile: CC Confirmation.pdf8 Mar 2024
Other - LegalFile: MOU.pdf8 Mar 2024
Proforma of Agreement for saleFile: Agreement for sale- Yogesh Desai.pdf22 Feb 2024
Other - LegalFile: Declaration of One Plot One Registration - Ashtavinayak Residency.pdf22 Feb 2024
Other - TechnicalFile: Declaration of One Plot One Registration - Ashtavinayak Residency.pdf22 Feb 2024
Copy of the legal title reportFile: Final Title Report.pdf21 Feb 2024
Details of encumbrances concerned to FinanceFile: No encumbrances to Finance_20240220_0001.pdf21 Feb 2024
Details of encumbrances concerned to FinanceFile: No encumbrances to Legal_20240220_0001.pdf21 Feb 2024
Details of encumbrances concerned to LegalFile: No encumbrances to Finance_20240220_0001.pdf21 Feb 2024
Details of encumbrances concerned to LegalFile: No encumbrances to Legal_20240220_0001.pdf21 Feb 2024
Declaration about Commencement CertificateFile: Form D.pdf21 Feb 2024
CERSAI detailsFile: CRESAI Report Undertaking_20240220_0001.pdf21 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Discolure of Interest in Other Real Estate Org_20240220_0001.pdf21 Feb 2024
Proforma of Allotment letterFile: Annexure 1 - Model Form of Allotment Letter_20240220_0001 - converted.pdf21 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - RERA Bank Declaration_20240220_0001.pdf21 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation of allotment letter_20240220_0001.pdf21 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation of Proforma Agreement_20240220_0001.pdf21 Feb 2024
Layout approvalFile: Plan 01.pdf20 Feb 2024
Building plan approvalFile: Plan 01.pdf20 Feb 2024
Layout approvalFile: Amalgamation Plan of Plot No 27-30 63-73.pdf20 Feb 2024
Building plan approvalFile: Amalgamation Plan of Plot No 27-30 63-73.pdf20 Feb 2024
Layout approvalFile: PROJECT - FLOOR PLAN.pdf20 Feb 2024
Building plan approvalFile: PROJECT - FLOOR PLAN.pdf20 Feb 2024
PAN CardFile: 2 Pan Card.pdf20 Feb 2024
Copy of Layout Approval (in case of layout)File: Plan 01.pdf20 Feb 2024

Keep Ashtavinayak Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Behind Chhatrapati Hospital, Nandurbar17 in Nandurbar

Builder: Yogesh Pramodshankar Desai

Yogesh Pramodshankar Desai has 1 registration on MahaRERA, including Ashtavinayak Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nandurbar district page.

Frequently asked questions

What does it mean that Ashtavinayak Residency shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ashtavinayak Residency is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashtavinayak Residency?

The registered promoter entity is Yogesh Pramodshankar Desai, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashtavinayak Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashtavinayak Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashtavinayak Residency?

The professionals named in the filing: Architect: Meghna Ravindra Pardeshi; Engineer: Shaikh Tanveer Shaikh Gaffar; Chartered Accountant: Narendra Agrawal & Associates; Chartered Accountant: Kshitija Pritesh Agrawal; Chartered Accountant: Krushna Rajkumar Gandhi; Chartered Accountant: JAYESH R AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashtavinayak Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashtavinayak Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashtavinayak Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.