Home / Browse projects / Nandurbar, Maharashtra / Chhoriya Residency Nandurbar Phase - 2

Completed No litigation declared Residential / Group Housing project

Chhoriya Residency Nandurbar Phase - 2

By Chhoriya and Kela Developers

RG-MH-01981 · RERA P49700009502 · Last updated on MahaRERA portal: 30 Sep 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nandurbar registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
10 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Chhoriya Residency Nandurbar Phase - 2 is a Residential / Group Housing project by Chhoriya and Kela Developers in Nandurbar, Maharashtra, registered with MahaRERA as P49700009502 on 22 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameChhoriya Residency Nandurbar Phase - 2
  • TypeResidential / Group Housing
  • Location
    • 18.00 M W DP Road
    • Nandurbar
    • Nandurbar (M Cl)
    • 425412
  • Pincode425412
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49700009502
  • ReraGenie IDRG-MH-01981

Builder

  • NameChhoriya and Kela Developers
  • Entity typePartnership
  • PartnerAnmol Kanhaiyalal Chhoriya
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow With SP - 3NA20000
Bungalow With SP - 2NA20000
Tower - 1, C -WingNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

Bungalow With SP - 344%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Bungalow With SP - 232%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower - 1, C -Wing76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities18

As on 30 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
CCTV Camera Service lineYes100%
Ent Gate and Compound WallYes100%
Intercom Video Door PhoneYes100%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered7
Open Space5

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,738 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Dr Kishor Kisanlal KelaJalgaon (Jamod) (M Cl)Buldana

Approvals and building plan

Permissible FSI2454.12
Proposed, not sanctioned2,454 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBibewadi Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUBHA ARCHITECTS
EngineerRAKESH JAIN & ASSOCIATES
Chartered AccountantAyush S. Kankariya
PartnerRole in project
Chhoriya and Kela Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT49700001223Dec 2018 → Dec 2019

Reason as filed by the promoterNote for State of development work - a) All proposed infrastructure in this proposed Phase-2 like Road, Drainage, water line, Transformer and street light, entrance gate, compound wall, security cabin etc etc are completed and amenities like community bldg., garden & landscaping are almost 95% completed. And only amenities like CCTV surveillance system, EPbex telephone system are in progress and shall be completed soon. b) Out of Total proposed units of 20 Nos (6 shops, 12 flats, 2 individual bungalow units), 14 units (6 shops, 8 flats ) been completed and OC been received for the same. And on

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jul 2020

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Nandurbar phase - 2 (March - 19).pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Nandurbar phase - 2 (March -20).pdf30 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Architects Certificate FORM 4 Nandurbar Project.pdf7 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: N Bar - 2 Eng Certificate _ Up to Dec 19.pdf10 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Qualty Assurance Certificate Dem - 19.pdf10 Jul 2020
Certificates of CA (Form 3)File: N Bar - 2 CA Certificate _ Up to Dec 19.pdf10 Jul 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nandurbar Part Ocupancy Certificate.pdf10 Jul 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nandurbar Phase - 2.pdf10 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandurbar 2 Archi certificate.pdf21 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nandurbar 2 Eng certificate.pdf21 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Qualty Assurance Certificate Sep - 19.pdf21 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance June - 19.pdf21 Jan 2020
Certificates of CA (Form 3)File: Nandurbar 2 ca certificate.pdf21 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nandurbar Phase - 2 Archi Certificate Up To - June -19.pdf30 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nandurbar Phase - 2 Eng Certificate Up To - June -19.pdf30 Dec 2019
Certificates of CA (Form 3)File: Nandurbar Phase - 2 CA Certificate Up To - June -19.pdf30 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certificate Nandurbar Ph -2.pdf10 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certificate Nandurbar Ph 2 Up To - March 2019.pdf10 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Nandurbar Ph 2 Up To - March 2019.pdf30 May 2019
Certificates of CA (Form 3)File: Ca Certificate Nandurbar Ph 2 Up To - March 2019.pdf30 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Nandurbar Ph -2.pdf13 Feb 2019
Certificates of CA (Form 3)File: Ca Certificate Nandurbar Ph -2.pdf13 Feb 2019
Certificates of CA (Form 5)File: Nandurbar Phase - 2 Form -5.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi certificate Nandurbar Ph 2 up To Sep - 18.pdf2 Jan 2019
OtherFile: Completion Certificate - C - building - GF FF and SF.pdf2 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Nandurbar Ph 2 up To Sep - 18.pdf31 Dec 2018
Certificates of CA (Form 3)File: Ca certificate Nandurbar Ph 2 up To Sep - 18.pdf31 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Cer Nandurbar PH -2 Up To June 18.pdf22 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cer Nandurbar PH -2 Up To June 18.pdf14 Sep 2018
Certificates of CA (Form 3)File: Ca Cer Nandurbar PH -2 Up To June 18.pdf14 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Nandurbar PH -2 Jane To march 2018.pdf5 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Cer Nandurbar PH -2 Jane To march 2018.pdf26 Jun 2018
Certificates of CA (Form 3)File: CA Cer Nandurbar PH -2 Jane To march 2018.pdf26 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng nandurbar Phase 2 _ Up To 31 Dec.pdf6 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar nandurbar Phase 2 _ Up To 31 Dec.pdf5 Apr 2018
Certificates of CA (Form 3)File: Ca nandurbar Phase 2 _ Up To 31 Dec.pdf5 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Nandhurbar commencment Certificate.pdf27 Mar 2018
Building plan approvalFile: Bungalow Type - B.pdf30 Jul 2017
Building plan approvalFile: Bungalow Type - A.pdf30 Jul 2017
Building plan approvalFile: Tower - 1 Wing - A B C Sheet 2.pdf30 Jul 2017
Building plan approvalFile: Tower - 1 Wing - A B C Sheet 2.pdf30 Jul 2017
Layout approvalFile: Total Layout Plan.pdf30 Jul 2017
Layout approvalFile: PHASE WISE LAYOUT.pdf30 Jul 2017
PAN CardFile: Chhoriya and Kela Developers.pdf30 Jul 2017
Copy of the legal title reportFile: Nandhurbar Search Report.pdf30 Jul 2017
Details of encumbrancesFile: Nandurbar Encumbrances certificate_1.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Total Layout Plan.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: PHASE WISE LAYOUT.pdf30 Jul 2017
Building Plan Approval (IOD)File: Bungalow Type - B.pdf30 Jul 2017
Building Plan Approval (IOD)File: Bungalow Type - A.pdf30 Jul 2017
Building Plan Approval (IOD)File: Tower - 1 Wing - A B C Sheet 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: Tower - 1 Wing - A B C Sheet 2.pdf30 Jul 2017
Declaration in FORM BFile: Nandhurbar Phases 2 Deceleration Form - B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cer Nandurbar Phase - 2.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Nandhubar Phase 2.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Nandhurbar Phase - 2.pdf30 Jul 2017
Proforma of Allotment letterFile: Nandurbar Allotment ATS _RERA Draft PDF.pdf30 Jul 2017

Keep Chhoriya Residency Nandurbar Phase - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nandurbar17 in Nandurbar

2 kmChhoriya Residency NanduLapsed / revoked 4Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: Chhoriya and Kela Developers

Chhoriya and Kela Developers has 3 registrations on MahaRERA, including Chhoriya Residency Nandurbar Phase - 2 and Chhoriya Residency Nandurbar Phase -4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nandurbar district page.

Frequently asked questions

What are my rights if Chhoriya Residency Nandurbar Phase - 2 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chhoriya Residency Nandurbar Phase - 2?

The registered promoter entity is Chhoriya and Kela Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chhoriya Residency Nandurbar Phase - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chhoriya Residency Nandurbar Phase - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chhoriya Residency Nandurbar Phase - 2?

The professionals named in the filing: Architect: SUBHA ARCHITECTS; Engineer: RAKESH JAIN & ASSOCIATES; Chartered Accountant: Ayush S. Kankariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chhoriya Residency Nandurbar Phase - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chhoriya Residency Nandurbar Phase - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chhoriya Residency Nandurbar Phase - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.