Home / Browse projects / Nashik, Maharashtra / MADHOORS ANANDAM
MADHOORS ANANDAM
By Madhoor Buildwell Pvt. Ltd.
RG-MH-00473 · RERA P51600001270 · Last updated on MahaRERA portal: 27 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
- Completion date moved by 69 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MADHOORS ANANDAM is a Others project by Madhoor Buildwell Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600001270 on 27 Jul 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 69 months from the original filing. 37 of the 47 units on this registration are recorded sold or booked, and 44 of 77 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameMADHOORS ANANDAM
- TypeOthers
- Location
- Nasik Pune Road
- Dwarka
- Nashik (M Corp.)
- Nashik
- 422401
- Pincode422401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600001270
- ReraGenie IDRG-MH-00473
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jul 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2021)
- Buildings7 building records
- Documents filed88 files
Current status
Figures as on 27 Dec 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-A | NA | 5 | 5 | 9 | 0 | 9 |
| WING-B | NA | 4 | 4 | 9 | 0 | 9 |
| WING-C | NA | 5 | 5 | 9 | 0 | 9 |
| WING-D | NA | 3 | 3 | 6 | 0 | 6 |
| WING-E | NA | 3 | 3 | 6 | 0 | 6 |
| WING-F | NA | 2 | 2 | 2 | 0 | 2 |
| WING-G | NA | 2 | 2 | 0 | 6 | 6 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 27 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Staircases, at 95%.
WING-A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
WING-B81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING-C90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING-D76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
WING-E75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
WING-F76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
WING-G37%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 58% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 35% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 80% |
Parking filed47
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING-A | 0 | 9 | 9 |
| WING-B | 1 | 9 | 10 |
| WING-C | 1 | 9 | 10 |
| WING-D | 0 | 6 | 6 |
| WING-E | 0 | 6 | 6 |
| WING-G | 0 | 6 | 6 |
Land and ownership10
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ms. Sugrabai Jamal Mansuri | Mumbai City | Mumbai City |
| Ms. Zubeda Jamal Mansuri | Mumbai City | Mumbai City |
| Ms. Hurbanu Jamal Mansuri alias Nurbanoo J.Mansuri | Mumbai City | Mumbai City |
| Smt. Safiyabai Noormohamed Mansuri | Mumbai City | Mumbai City |
| Mrs. Samina Aziz Mamunji | Mumbai City | Mumbai City |
| Mrs. Nasreen Mohd. Ayub Mansoori | Mumbai City | Mumbai City |
| Mr. Javed Aktar Noormohamed Mansuri | Mumbai City | Mumbai City |
| Mr. Sajjad Husain Noormohamad Mansuri | Mumbai City | Mumbai City |
| Smt. Jainabbai Abubakar Mansuri | Mumbai City | Mumbai City |
| Mr. Mohamad Asif Aboobakar Mansuri | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING-A | NA | Rs 3.30 cr | Rs 3.28 cr |
| WING-C | NA | Rs 3.29 cr | Rs 3.27 cr |
| WING-B | NA | Rs 3.26 cr | Rs 3.26 cr |
| WING-D | NA | Rs 2.08 cr | Rs 1.98 cr |
| WING-E | NA | Rs 1.71 cr | Rs 1.57 cr |
| WING-G | NA | Rs 1.60 cr | Rs 78.52 lakh |
| WING-F | NA | Rs 1.34 cr | Rs 1.19 cr |
| - | NA | Rs 1.05 cr | Rs 89.99 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Homework |
| Architect | Pradip Patel & Associates |
| Architect | ADWAIT INAMDAR |
| Engineer | SANTOSH ASAWA |
| Engineer | ANIL BHAULA KUMAVAT |
| Chartered Accountant | PIYUSH VERMA AND ASSOCIATES |
| Chartered Accountant | MUKUND G KOKIL |
| Chartered Accountant | PIYUSH LALIT VERMA |
| Partner | Role in project |
|---|---|
| Madhoor Buildwell Pvt. Ltd. | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera) Residential Project is not completed b) Due to the COVID-19 pandemic, the regular flow of work is hampered on account of the unavailability of labor on a regular basis
Reason as filed by the promoterWe have to state that, though 90% of the work is completed; the said project is getting delayed, mainly because of the following reasons; which were beyond our control. a) Due to Covid-19 Pandemic b) Scarcity of building materials especially Natural Sand in Nasik city. In view of the above we therefore request you to grant us an extension of 9 Months i.e. 31/12/2021 in order to complete the said project.
Reason as filed by the promoterWe sincerely regret the delay in completing the project and submitting this application for an extension under the MahaRERA Act. Despite our consistent efforts, the following unforeseen challenges have significantly impacted the project's timeline: 1. Unfavorable Market Conditions: Prolonged economic uncertainties and reduced consumer demand have directly affected project funding and execution. 2. Labor and Resource Shortages: A sudden scarcity of skilled labor and essential materials due to some reasons caused project interruptions. 3. Unforeseen Technical Issues: On-site technical challenges
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 350/2014/2014 | Civil Judge Senior Division Nashik | Pending |
| 205/2014/2014 | Additional Revenue Commissioner Nashik Division | Pending |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC001000000010156 | Prakash Kewlani | Madhoor Buildwell Pvt Ltd | 29/09/2020 |
| CC001000000010158 | Prakash Kewlani | Madhoor Buildwell PvtLtd | 29/09/2020 |
| CC001000000050292 | NAVEEN MANOHARLAL NAGPAL | MADHOOR BUILDWELL PRIVARE LIMITED | 17/12/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Form B.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 27 Dec 2024 |
| Other - TechnicalFile: Madhoors Anandam reply.pdf | 27 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Anandam 30092024 Final.pdf | 22 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Anandam 30062024 Final.pdf | 22 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Anandam 31032024 Final.pdf | 22 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Anandam 31122023 Final.pdf | 22 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Certificate Anandam 31032024.pdf | 22 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate - Anandam - 31122023.pdf | 20 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate - Anandam - 31032024.pdf | 20 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate - Anandam - 30062024.pdf | 20 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate - Anandam - 30092024.pdf | 20 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate - Anandam - 31122023.pdf | 20 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate - Anandam - 31032024.pdf | 20 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate - Anandam - 30062024.pdf | 20 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate - Anandam - 30092024.pdf | 20 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Engineer Certificate - Anandam - 31032024.pdf | 20 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_March_2023_Anandam.pdf | 13 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Anandam.pdf | 12 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Anandam.pdf | 12 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure 30092023 Anandam.pdf | 12 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3_Anandam.pdf | 12 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 1.pdf | 13 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20 bW.pdf | 10 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21BW.pdf | 10 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22BW.pdf | 10 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22-23BW.pdf | 10 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31032023.pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31032023.pdf | 3 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31032023.pdf | 3 May 2023 |
| Certificates of CA (Form 3)File: CA Certificate as on 31032023.pdf | 3 May 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances to Legal Title 04032023.pdf | 6 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances to Legal Title 04032023.pdf | 6 Mar 2023 |
| Copy of the legal title reportFile: Title Certificate 04032023.pdf | 4 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA Certified 31032022.pdf | 9 Feb 2023 |
| Proforma of Agreement for saleFile: Agreement To Sell 'Anandam' Draft 09 Feb 2023.pdf | 9 Feb 2023 |
| Proforma of Allotment letterFile: Allotment_Letter_Anandam.pdf | 9 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: No Daviation Report to Allotment.pdf | 9 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Sheet_Anandam.pdf | 9 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement.pdf | 5 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 31032022.pdf | 5 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31032021.pdf | 5 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31032022.pdf | 5 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 5 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Orgnaisations PRP A.pdf | 5 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31032020.pdf | 4 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31032021.pdf | 4 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31032022.pdf | 4 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31122022.pdf | 4 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31032019.pdf | 4 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31032019.pdf | 4 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31032020.pdf | 4 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31032021.pdf | 4 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31032022.pdf | 4 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31122022.pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate as on 31032019.pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate as on 31032020.pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate as on 31032021.pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate as on 31032022.pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate as on 31122022.pdf | 4 Feb 2023 |
| Certificates of CA (Form 5)File: Form 5 CA Certified 31032019.pdf | 4 Feb 2023 |
| Certificates of CA (Form 5)File: Form 5 CA Certified 31032022.pdf | 4 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CA Certified 31032019.pdf | 4 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CA Certified 31032020.pdf | 4 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 CA Certified 31032021.pdf | 4 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Anandam.pdf | 25 May 2021 |
| Details of encumbrancesFile: NOC from SBI - Anandam Project.pdf | 4 Aug 2020 |
| Details of encumbrancesFile: Index-II.pdf | 4 Aug 2020 |
| Details of Restarting of Construction work post lockdownFile: Madhoor's_Anandam_Covid_06072020.pdf | 6 Jul 2020 |
| Certificates of CA (Form 5)File: Madhoors Anandam.pdf | 15 Oct 2018 |
| Layout approvalFile: Layout.pdf | 21 Jul 2017 |
| Building plan approvalFile: A-B-C-Wing.pdf | 21 Jul 2017 |
| Building plan approvalFile: D-E-Wing.pdf | 21 Jul 2017 |
| PAN CardFile: PAN Card of Company.pdf | 21 Jul 2017 |
| Copy of the legal title reportFile: Titel Certificate Madhoor Anandam.pdf | 21 Jul 2017 |
| Details of encumbrancesFile: Titel Certificate Madhoor Anandam.pdf | 21 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Details.pdf | 21 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 21 Jul 2017 |
| Building Plan Approval (IOD)File: A-B-C-Wing.pdf | 21 Jul 2017 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Beverlly Hills Phase - II | Lam Road Deolali Nasik 422401 | 27 | Completed | Jun 2017 | May 2017 |
| Beverlly Hills Phase - I | Lam Road Deolali Nasik 422401 | 65 | Completed | Dec 2015 | Late, Aug 2016 |
| Teerthankar Apartment | Opp Gurudwara Near Fire Brigade Office Shingada Talav Nasik 422002 | 30 | Completed | Mar 2013 | Late, Jun 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MADHOORS ANANDAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dwarka4,100+ in Nashik
Meru Heritage
Amit Builders and Developers
SAI PARK
Jay Developers
ASHTAPAD PHASE VII
ARKK BUILDERS AND DEVELOPERS
Sai Nisarg
Devraj Builders & Land Developers
Ayodhya Residency
Akshay Subhash Khalkar
TULASI BAUG
RISHIKESH BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: Madhoor Buildwell Pvt. Ltd.
Madhoor Buildwell Pvt. Ltd. has 4 registrations on MahaRERA, including MADHOORS ANANDAM and BEVERLLY HILLS PHASE - III. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if MADHOORS ANANDAM is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MADHOORS ANANDAM?
The registered promoter entity is Madhoor Buildwell Pvt. Ltd., a company as per the filing. Its CIN U45200MH1994PTC081387 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MADHOORS ANANDAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MADHOORS ANANDAM?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MADHOORS ANANDAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MADHOORS ANANDAM?
The professionals named in the filing: Architect: Homework; Architect: Pradip Patel & Associates; Architect: ADWAIT INAMDAR; Engineer: SANTOSH ASAWA; Engineer: ANIL BHAULA KUMAVAT; Chartered Accountant: PIYUSH VERMA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MADHOORS ANANDAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback