Home / Browse projects / Thane, Maharashtra / MAANSAROVAR

Registration lapsed No litigation declared Others project

MAANSAROVAR

By MERIDIAN BUILDPRO PRIVATE LIMITED

RG-MH-20955 · RERA P51700003643 · Last updated on MahaRERA portal: 10 May 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

MAANSAROVAR is a Others project by MERIDIAN BUILDPRO PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700003643 on 6 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date.

At a glance

Project

  • NameMAANSAROVAR
  • TypeOthers
  • Location
    • ALMEIDA ROAD
    • PANCHPAKKHADI
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700003643
  • ReraGenie IDRG-MH-20955

Builder

  • NameMERIDIAN BUILDPRO PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsANIL NAGRAJ MUTHA, SURESH BABULAL JAIN

Key dates

46 months past promisethis monthRegisteredAug 2017PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAANSAROVARNA360000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MAANSAROVAR: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed354

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots354
Closed/Covered341
Open Space13

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,258 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI30074.36
Proposed, not sanctioned30,035 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGAUTAM HOUSE CHS OPP RELIANCE WEBWORLD NXT TO PNB THANE WEST 400602

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS TEN FOLDS ARCHITECT & CONSULTANTS
PartnerRole in project
MERIDIAN BUILDPRO PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Oct 2021

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Maansarovar.pdf10 May 2024
CERSAI detailsFile: CERSAI_Search_Report_200227145777_For_Debtor_Based_Search_01_01_2022_15_25_52_235.pdf1 Jan 2022
Certificates of CA (Form 3)File: Form 3 CA working Sep 21-Maansarovar.pdf11 Oct 2021
Details of encumbrancesFile: Encumbrancess - Maansarovar Compressed.pdf5 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Flat Maansarovar- Compressed.pdf5 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf2 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Signed.pdf29 Sep 2021
Certificates of CA (Form 3)File: MBPL FORM - 3 till March 2021-compressed.pdf27 Sep 2021
Certificates of CA (Form 3)File: MBPL FORM - 3 till June 2021_compressed.pdf27 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 21.pdf18 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 21.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf23 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf23 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A June 21.pdf23 Aug 2021
Details of encumbrancesFile: Incumbrance Cert june 21.pdf21 Aug 2021
Details of encumbrancesFile: Incumbrance Cert mar 21.pdf21 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory-2.pdf21 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 21.pdf19 Aug 2021
Certificates of CA (Form 3)File: Mar 21.pdf19 Aug 2021
Certificates of CA (Form 3)File: Dec-20.pdf18 Aug 2021
Certificates of CA (Form 3)File: Dec-20.pdf18 Aug 2021
Certificates of CA (Form 3)File: RERA Certificate Maansarovar Dec 2020.pdf6 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE_compressed.pdf3 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE_compressed.pdf3 Mar 2021
Certificates of CA (Form 3)File: FORM 3.pdf3 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Statement.pdf3 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf3 Mar 2021
Details of encumbrancesFile: Encumbarances.pdf2 Jan 2020
Layout approvalFile: Revised Layout.pdf5 Nov 2019
Details of encumbrancesFile: Encumbrances.pdf5 Nov 2019
Copy of Layout Approval (in case of layout)File: Revised Layout.pdf5 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf5 Nov 2019
Certificates of CA (Form 5)File: CA Certificate - SIVANTA FORM 5 RERA .pdf16 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf29 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf29 Aug 2019
Certificates of CA (Form 3)File: CA Certificate_Sivanta.pdf29 Aug 2019
Details of encumbrancesFile: Encumbrance.pdf15 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf14 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Sivanta.pdf14 Feb 2019
Certificates of CA (Form 3)File: CA Certificate_Sivanta.pdf14 Feb 2019
Details of encumbrancesFile: Encumbrances Certificate.pdf19 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sivanta.pdf17 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Sivanta.pdf17 Nov 2018
Certificates of CA (Form 3)File: CA Certificate_Sivanta 04.pdf17 Nov 2018
Certificates of CA (Form 5)File: CA Certificate - SIVANTA FORM 5.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sivanta.pdf12 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Sivanta.pdf12 Jul 2018
Certificates of CA (Form 3)File: CA Certificate_Sivanta.pdf12 Jul 2018
Details of encumbrancesFile: Details of Encumbrances - Sivanta Feb 18.pdf12 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-SIVANTA.pdf11 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sivanta Feb 18.pdf11 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -Sivanta Carpet Area.pdf11 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Sivanta Sale.pdf11 Apr 2018
Certificates of CA (Form 3)File: CA Certificate_Sivanta-Feb 18.pdf11 Apr 2018
Certificates of CA (Form 3)File: CA Certificate - Sivanta 1-4.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA Certificate - Sivanta 5-8.pdf26 Jul 2017
Building plan approvalFile: sheet 1 .pdf25 Jul 2017
Building plan approvalFile: sheet 2.pdf25 Jul 2017
Building plan approvalFile: sheet 3.pdf25 Jul 2017
Building plan approvalFile: sheet 4.pdf25 Jul 2017
Building plan approvalFile: sheet 5.pdf25 Jul 2017
Building plan approvalFile: sheet 6.pdf25 Jul 2017
Building plan approvalFile: sheet 7.pdf25 Jul 2017
Building plan approvalFile: sheet 8.pdf25 Jul 2017
Building plan approvalFile: CC.pdf25 Jul 2017
Layout approvalFile: sheet 1 .pdf25 Jul 2017
PAN CardFile: PAN card.pdf25 Jul 2017
Copy of the legal title reportFile: SIVANTA-TITLE CERT 1-4.pdf25 Jul 2017
Copy of the legal title reportFile: SIVANTA-TITLE CERT 5-8.pdf25 Jul 2017
Details of encumbrancesFile: Details of Encumbrances.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: sheet 1 .pdf25 Jul 2017
Building Plan Approval (IOD)File: CC.pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 1 .pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 2.pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 3.pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 4.pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 5.pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 6.pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 7.pdf25 Jul 2017
Building Plan Approval (IOD)File: sheet 8.pdf25 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAANSAROVAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANCHPAKKHADI7,600+ in Thane

2 kmMAANSAROVARCompleted 128Lapsed / revoked 77Other 184Dot size: filed unitsN

Filed coordinates, straight-line distance. 389 registered projects within 2 km.

Builder: MERIDIAN BUILDPRO PRIVATE LIMITED

MERIDIAN BUILDPRO PRIVATE LIMITED has 1 registration on MahaRERA, including MAANSAROVAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that MAANSAROVAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MAANSAROVAR is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAANSAROVAR?

The registered promoter entity is MERIDIAN BUILDPRO PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAANSAROVAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAANSAROVAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAANSAROVAR?

The professionals named in the filing: Architect: MS TEN FOLDS ARCHITECT & CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAANSAROVAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAANSAROVAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAANSAROVAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.