Home / Browse projects / Raigarh, Maharashtra / M/S SKY HEAVEN

Registration lapsed No litigation declared Plotted project

M/S SKY HEAVEN

By GUNAVANT SUPADU PATIL

RG-MH-43796 · RERA P52000018375 · Last updated on MahaRERA portal: 27 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 55 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2022Possession promised55 months past this date
48 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

M/S SKY HEAVEN is a Plotted project by GUNAVANT SUPADU PATIL in Raigarh, Maharashtra, registered with MahaRERA as P52000018375 on 26 Oct 2018. Possession was promised by 17 Mar 2022 and is now 55 months past that date. 14 of the 62 units on this registration are recorded sold or booked.

At a glance

Project

  • NameM/S SKY HEAVEN
  • TypePlotted
  • Location
    • KARJAT MURBAD ROAD
    • KALAMB
    • Karjat
    • Raigarh
    • 421301
  • Pincode421301
  • RERA no.P52000018375
  • ReraGenie IDRG-MH-43796

Builder

  • NameGUNAVANT SUPADU PATIL
  • Entity typeIndividual

Key dates

55 months past promisethis monthRegisteredOct 2018PromisedMar 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Oct 2018
  • Promised completion17 Mar 2022
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed70 files

Current status

23%14 of 62 units booked

Figures as on 27 Mar 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 27 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area23,447 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI23447.0
Proposed, not sanctioned23,447 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAXMI SAGAR APARTMENT , NEAR COMMISSIONER BANGALOW, SAI SECTION , AMBERNATH EAST,

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA
EngineerTHE DESIGN INDIA
PartnerRole in project
GUNAVANT SUPADU PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Mar 2025

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 5 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for27 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: 4.pdf28 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: GetUserDocumentFileContent_organized (1).pdf15 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GetUserDocumentFileContent_organized (2).pdf15 Nov 2024
PAN CardFile: PAN CARD.pdf12 Jul 2023
Details of encumbrances concerned to FinanceFile: no encumbrance LEGAL.pdf12 Jul 2023
Details of encumbrances concerned to LegalFile: no encumbrance LEGAL.pdf12 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Gunvant patil Aannexure sky Heaven.pdf12 Jul 2023
Proforma of Agreement for saleFile: ilovepdf_merged (10)_compressed.pdf12 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about seperate.pdf12 Jul 2023
Deviation Report with respect to Allotment letterFile: no deviation in allotment.pdf12 Jul 2023
Deviation Report with respect to model copy of AgreementFile: No deviation in agreement.pdf12 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TAHASIDARRERA.pdf19 Jun 2023
Status of ConveyanceFile: RERA.pdf7 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sky Heaven .pdf21 Apr 2023
Declaration about Commencement CertificateFile: Circular 32 signed.pdf17 Feb 2022
CERSAI detailsFile: MS Sky Heaven.pdf17 Feb 2022
Disclosure of sold/ booked inventoryFile: Circular 29 signed.pdf17 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Ms Sky Heaven FY 2018-19.pdf17 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Ms Sky Heaven FY 2019-20.pdf17 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Ms Sky Heaven FY 2020-21.pdf17 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration soc signed.pdf17 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 4 ARCHITACT.pdf6 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 ARCHITACT.pdf6 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: archit.pdf9 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: archit.pdf9 Jul 2021
Certificates of CA (Form 3)File: CA Certificate Form 03.pdf4 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architcet certificate (1).pdf20 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer.pdf20 Mar 2019
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf20 Mar 2019
Building plan approval or NA orderFile: Layout Plan.pdf16 Oct 2018
Layout approvalFile: Layout Plan.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_1-3.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_4-6.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_7-9.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_10-12.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_13-15.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_16-18.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_19-21.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_22-24.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_25-27.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_28-30.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_31-33.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_34-36.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_37-39.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_40-42.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_43-45.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_46-48.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_49-50.pdf16 Oct 2018
Copy of the legal title reportFile: SERACH FREPORT_51-end.pdf16 Oct 2018
Details of encumbrancesFile: Encumbrances.pdf16 Oct 2018
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf16 Oct 2018
Building Plan Approval (IOD)File: Layout Plan.pdf16 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER_1-3.pdf16 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER_4-6.pdf16 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER_7-end (3).pdf16 Oct 2018
Declaration in FORM BFile: FORM B.pdf16 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: REVISED ARCHI_1-3.pdf16 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: REVISED ARCHI_4-end.pdf16 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: REVISED ENGINEER_1-3.pdf16 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: REVISED ENGINEER_4-end.pdf16 Oct 2018
Certificates of CA (Form 3)File: revised CA Cert Form 03 Sky Heaven.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_1-3.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_4-6.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_7-9.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_10-12.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_13-15.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_16-18.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_19-21.pdf16 Oct 2018
Proforma of Allotment letterFile: Sky_Heaven_Final_Draft_22-end.pdf16 Oct 2018

How this compares with Raigarh

23%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M/S SKY HEAVEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALAMB5,900+ in Raigarh

Builder: GUNAVANT SUPADU PATIL

GUNAVANT SUPADU PATIL has 1 registration on MahaRERA, including M/S SKY HEAVEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that M/S SKY HEAVEN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if M/S SKY HEAVEN is delayed beyond 17 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M/S SKY HEAVEN?

The registered promoter entity is GUNAVANT SUPADU PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M/S SKY HEAVEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for M/S SKY HEAVEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at M/S SKY HEAVEN?

The professionals named in the filing: Architect: THE DESIGN INDIA; Engineer: THE DESIGN INDIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in M/S SKY HEAVEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M/S SKY HEAVEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M/S SKY HEAVEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.