Home / Browse projects / Thane, Maharashtra / M M VALEY A2

Completed No litigation declared Residential / Group Housing project

M M VALEY A2

By ALFA ENTERPRISES

RG-MH-54511 · RERA P51700010237 · Last updated on MahaRERA portal: 20 Jan 2023

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 98%
2Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

M M VALEY A2 is a Residential / Group Housing project by ALFA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700010237 on 24 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 2 complaints are on record with the regulator.

At a glance

Project

  • NameM M VALEY A2
  • TypeResidential / Group Housing
  • Location
    • THANE
    • Chavindra
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010237
  • ReraGenie IDRG-MH-54511

Builder

  • NameALFA ENTERPRISES
  • Entity typePartnership
  • PartnersMOHAMMED MUSTAFA MOHAMMED MASROOR SHAIKH, MOHAMMED MASROOR MOHAMMED IDRIS SHAIKH
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredAug 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-2 MM VALLEY PREMIUMNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

A-2 MM VALLEY PREMIUM: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%

Progress on shared amenities17

As on 20 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes33%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Solar PanelsYes0%
PodiumYes90%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,865 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4284.64
Proposed, not sanctioned2,045 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR MAYFLOWER CHS LTD OPPOSITE MUKUND STEEL LBS ROAD KURLA WEST MUMBAI 400070

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJOSHI DESHAWARE & ASSOCIATES
EngineerASSOCIATED CONSULTANTS Vikas Gokhale
Chartered Accountantshashank jain
Chartered AccountantW.S USMANI & Co
PartnerRole in project
ALFA ENTERPRISES-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000197040AMJAD AZIZ MEHERBAKSHM/s. Alfa Enterprises21/05/2021
CC12601061ALFA ENTERPRISESSanjay Babulal Sharma26/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 May 2022

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5_MM VALLEY A2_2021-22.pdf20 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-2 Engineer Certificate signed_compressed.pdf16 Jul 2022
Disclosure of sold/ booked inventoryFile: A-2 Sold Unsold flats_compressed.pdf16 Jul 2022
Certificates of CA (Form 3)File: A2_Form 3_30062022_Part 1_compressed.pdf16 Jul 2022
Certificates of CA (Form 3)File: A2_Form 3_30062022_Part 2_compressed.pdf16 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_compressed.pdf30 May 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.PDF30 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Signed_compressed.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_A2_compressed.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf10 May 2022
Disclosure of sold/ booked inventoryFile: A-2 List of sold unsold flats shops_compressed.pdf10 May 2022
Certificates of CA (Form 3)File: Form 3_Merged.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf5 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q3_compressed.pdf31 Mar 2022
Disclosure of sold/ booked inventoryFile: List of Sold and Unsold Flats_compressed.pdf31 Mar 2022
Disclosure of sold/ booked inventoryFile: A2-revised sold and unsold flats_compressed.pdf31 Mar 2022
Certificates of CA (Form 3)File: Form 3_compressed.pdf31 Mar 2022
Layout approvalFile: Club House, Podium 1 and 2.pdf22 Mar 2022
Layout approvalFile: A2 - Floor Plan.pdf22 Mar 2022
Layout approvalFile: A-2 Refuge floor 9,12,17 and 22nd_compressed.pdf22 Mar 2022
Layout approvalFile: Club House, Podium 1 and 2.pdf22 Mar 2022
Copy of Layout Approval (in case of layout)File: A2 - Floor Plan.pdf22 Mar 2022
Copy of Layout Approval (in case of layout)File: A-2 Refuge floor 9,12,17 and 22nd_compressed.pdf22 Mar 2022
Copy of Layout Approval (in case of layout)File: Club House, Podium 1 and 2.pdf22 Mar 2022
Copy of Layout Approval (in case of layout)File: Club House, Podium 1 and 2.pdf22 Mar 2022
Copy of the legal title reportFile: Alfa Title Certificate 230222_compressed.pdf16 Mar 2022
Proforma of Allotment letterFile: A-2 Draft Agreement 070322.pdf16 Mar 2022
Proforma of Allotment letterFile: A-2 - Draft Allotment Letter.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: A2 - MM Valley_Final Form 5_FY 20-21.pdf26 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A2 March 2020 Final Form-5.pdf25 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Uploaded.pdf26 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-2 ARCHITECT CERTIFICATE_ Uploaded.pdf22 Nov 2021
Certificates of CA (Form 3)File: A-2 ARCHITECT CERTIFICATE_ Uploaded.pdf22 Nov 2021
Certificates of CA (Form 3)File: A-2 ARCHITECT CERTIFICATE_ Uploaded.pdf22 Nov 2021
Certificates of CA (Form 3)File: A2 Cost Sheet 300921 Uploaded.pdf22 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A as on 31-03-2021.pdf9 Aug 2021
Declaration about Commencement CertificateFile: Declaration about CC.pdf6 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Compressed.pdf6 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers Certificate_1_Compressed.pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory_Compressed.pdf6 Aug 2021
Certificates of CA (Form 3)File: Final Form-3 CA_Compressed.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A2 RERA Certificate_Compressed.pdf29 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ALFA RERA - A2_Compressed.pdf28 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineer Certificate_Compressed.pdf28 May 2021
Certificates of CA (Form 3)File: Form-3 CA Final_Compressed.pdf28 May 2021
OtherFile: LOA Alfa-19-03-20_Compressed.pdf1 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE PHASE 3_Compressed.pdf25 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER_S CERTIFICATE (2)_Compressed.pdf25 Feb 2021
Certificates of CA (Form 3)File: MM Valley A-2 CA Final Form-3.pdf25 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_.pdf28 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf28 Jan 2021
Certificates of CA (Form 3)File: FORM 3_Compressed.pdf28 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Certificate 040120.pdf30 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 31 03 2020 A2_Compressed.pdf27 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 30 06 2020 A2.pdf27 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Compressed.pdf25 Jul 2020
Certificates of CA (Form 3)File: Form - 3 Final.pdf25 Jul 2020
Certificates of CA (Form 3)File: Form - 3 Final.pdf25 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf21 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Alfa 2 - Form-2_Compressed.pdf21 Jan 2020
Certificates of CA (Form 3)File: Form-3_Compressed.pdf21 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf6 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA FORM-5 A-2.pdf30 Oct 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA FORM-5 A-2.pdf30 Oct 2019
Certificates of CA (Form 5)File: A2 RERA Certificate-2019_Compressed.pdf29 Oct 2019
Certificates of CA (Form 5)File: A2 RERA Certificate-2019_Compressed.pdf29 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf4 Oct 2019
Certificates of CA (Form 3)File: FORM 3.pdf4 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf2 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: CC UPTO 23 FLOOR.pdf20 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Compressed.pdf10 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Compressed.pdf10 May 2019
Certificates of CA (Form 3)File: Form-3_Compressed.pdf10 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM - 1.pdf25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf25 Jan 2019
Certificates of CA (Form 3)File: form 3.pdf25 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf30 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf30 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf30 Oct 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M M VALEY A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE7,600+ in Thane

2 kmM M VALEY A2Completed 52Lapsed / revoked 29Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 133 registered projects within 2 km.

Builder: ALFA ENTERPRISES

ALFA ENTERPRISES has 4 registrations on MahaRERA, including M M VALLEY C1 and M M VALEY A2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if M M VALEY A2 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M M VALEY A2?

The registered promoter entity is ALFA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M M VALEY A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against M M VALEY A2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for M M VALEY A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at M M VALEY A2?

The professionals named in the filing: Architect: JOSHI DESHAWARE & ASSOCIATES; Engineer: ASSOCIATED CONSULTANTS Vikas Gokhale; Chartered Accountant: shashank jain; Chartered Accountant: W.S USMANI & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in M M VALEY A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M M VALEY A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M M VALEY A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.