Home / Browse projects / Thane, Maharashtra / M M CITY

Completed No litigation declared Residential / Group Housing project

M M CITY

By FINE CONSTRUCTION COMPANY

RG-MH-04419 · RERA P51700022075 · Last updated on MahaRERA portal: 29 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
15 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

M M CITY is a Residential / Group Housing project by FINE CONSTRUCTION COMPANY in Thane, Maharashtra, registered with MahaRERA as P51700022075 on 25 Aug 2019. The registration is recorded completed; possession was promised by 30 Mar 2026.

At a glance

Project

  • NameM M CITY
  • TypeResidential / Group Housing
  • Location
    • OLD MUMBAI PUNE ROAD
    • NEW SHILL
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700022075
  • ReraGenie IDRG-MH-04419

Builder

  • NameFINE CONSTRUCTION COMPANY
  • Entity typePartnership
  • Partnersadnan mohd Shaikh, mohammed hasan khan, Amirullah Khan, umair mohmmed shaikh, Abdul Salam Khan, Mohd Zahid Motani, Irshadahmed Khan, Abdul Kayyum Khan, Shameem Khan

Key dates

this monthRegisteredAug 2019PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2019
  • Promised completion30 Mar 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed103 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA80000
A2 WING ANA80000
A2 WING BNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

A185%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
A2 WING A84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
A2 WING B84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 29 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18
BuildingClosed/CoveredTotal
A199
A2 WING A44
A2 WING B55

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,543 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
NEW SHEELL CO OP HOU SOC LTDThane (M Corp.)Thane

Approvals and building plan

Permissible FSI6681.93
Proposed, not sanctioned6,216 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBRA KAUSA DIST THANE 400612

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER S LOTKE ASSOCIATES
EngineerSS CONS
Chartered AccountantSHABBAR & ASSOCIATES
Chartered AccountantAS SUTERWALA & CO
PartnerRole in project
FINE CONSTRUCTION COMPANY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Dec 2024

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q1.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q1.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25-Q1.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory FY 24-25-Q1.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory FY 24-5-Q1.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance.pdf3 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q4.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 23-24-Q4.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report - Fine Construction Co.pdf19 Nov 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Legal.pdf13 Feb 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Legal.pdf13 Feb 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate FY 23-24-Q3.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 23-24-Q3.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 23-24-Q3.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q3.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Audit Declaration FY 2017-18.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit Declaration FY 2018-19.pdf13 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf13 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf13 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for Sale.pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate FY 22-23-Q3.pdf30 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate FY 22-23-Q4.pdf30 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate FY 23-24-Q1.pdf30 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate FY 23-24-Q2.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 22-23-Q4.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 23-24-Q1.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 23-24-Q2.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA Certificate FY 2022-23.pdf30 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 22-23-Q4.pdf28 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 23-24-Q1.pdf28 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 23-24-Q2.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 22-23-Q4.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q1.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q2.pdf28 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit Report FY 22-23.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Insurance Certificate 31-03-2022.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Q3.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold and Unsold- Q3.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Q3 Upload.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventry.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold and Unsold- 30062022 Upload.pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Audit Report - Form 5.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate.pdf14 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: quality assurance certificate sep-2022.pdf14 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate Fine.pdf14 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE.pdf18 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf18 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf18 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 31-03-2022.pdf29 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Insurance Certificate 31-03-2022.pdf29 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Annual Report on Statement of Accounts.pdf9 Apr 2022
Layout approvalFile: scan0028 LAYOUT PLAN (1).pdf12 Feb 2022
Building plan approvalFile: scan0029 BLDG A1 GR 2 COMMERCIAL.pdf12 Feb 2022
Building plan approvalFile: scan0030 BLDG A1 3RD TO 7TH RESIDENTIAL.pdf12 Feb 2022
Building plan approvalFile: scan0032 BLDG A2 2ND TO 7TH RESIDENTIAL.pdf12 Feb 2022
Building plan approvalFile: Scan0031 BLDG A2 GR 1ST COMMERCIAL.pdf12 Feb 2022
Copy of Layout Approval (in case of layout)File: scan0028 LAYOUT PLAN (1).pdf12 Feb 2022
Building Plan Approval (IOD)File: scan0029 BLDG A1 GR 2 COMMERCIAL.pdf12 Feb 2022
Building Plan Approval (IOD)File: scan0030 BLDG A1 3RD TO 7TH RESIDENTIAL.pdf12 Feb 2022
Building Plan Approval (IOD)File: scan0032 BLDG A2 2ND TO 7TH RESIDENTIAL.pdf12 Feb 2022
Building Plan Approval (IOD)File: Scan0031 BLDG A2 GR 1ST COMMERCIAL.pdf12 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf8 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE 31-12-2021.pdf8 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate.pdf8 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1 Quality Assurance 31-12-2021.pdf8 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventry.pdf8 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf8 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 30-09-2021.pdf29 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance certificate.pdf29 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate fine construction.pdf29 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Upload.pdf23 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold and Unsold Upload.pdf23 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance.pdf15 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Upload.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance 2019-20.pdf26 May 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M M CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEW SHILL7,600+ in Thane

2 kmM M CITYCompleted 32Lapsed / revoked 19Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: FINE CONSTRUCTION COMPANY

FINE CONSTRUCTION COMPANY has 1 registration on MahaRERA, including M M CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if M M CITY is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M M CITY?

The registered promoter entity is FINE CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M M CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for M M CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at M M CITY?

The professionals named in the filing: Architect: SAMEER S LOTKE ASSOCIATES; Engineer: SS CONS; Chartered Accountant: SHABBAR & ASSOCIATES; Chartered Accountant: AS SUTERWALA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in M M CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M M CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M M CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.