ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / M.K Heritage

Registered Litigation declared Residential / Group Housing project

M.K Heritage

By SHAISTA MAJID KHAN

RG-MH-61547 · RERA P51800014952 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 16 cases
  • Completion date moved by 96 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 96 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 45%
15 of 15Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

M.K Heritage is a Residential / Group Housing project by SHAISTA MAJID KHAN in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014952 on 15 Jan 2018. Possession is promised by 31 Dec 2030. The completion date has moved by 96 months from the original filing. 0 of the 15 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameM.K Heritage
  • TypeResidential / Group Housing
  • Location
    • 477B/1/8
    • 477/B/2
    • 477B/3
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014952
  • ReraGenie IDRG-MH-61547

Builder

  • NameSHAISTA MAJID KHAN
  • Entity typeIndividual
  • GSTIN27AGAPK8212G1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2018First promiseDec 2022Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2018
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed102 files

Current status

0%0 of 15 units booked
25.3%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
M K HeritageNA16614115

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 45%.

M K Heritage: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes80%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered18
Open Space8

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area789 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI853.43
Proposed, not sanctioned853 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANGAL MAHAL TURNER ROAD,BANDRA WEST
Estimated costRs 14.15 cr
Cost incurredRs 3.58 cr
Work done25.31%
BuildingWingEstimatedIncurred
M K HeritageNARs 13.45 crRs 3.07 cr
-NARs 70.77 lakhRs 50.71 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJainam Sunil Shah
ArchitectSPACERA
EngineerDIYA HOME SOLUTIONS
EngineerM P PRIME STRUCTURES PRIVATE LIMITED
EngineerS K Consultants & Engineers
Chartered AccountantSANDEEP RATHI & ASSOCIATES
Chartered AccountantA Q SHAIKH & CO LLP
Chartered AccountantN B Sayed & Associates
Chartered AccountantCA Rutuja Narsingh & Associates
PartnerRole in project
SHAISTA MAJID KHAN-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017387Dec 2022 → Dec 2026

Reason as filed by the promoterDue to non availability of manpower and material we were unable to complete the project as per the promised date therefore we would request you to please grant us the extension up to 31-12-2026 and we will try to complete the project before the given timeline.

EA04082622017Dec 2022 → Dec 2030

Reason as filed by the promoterWe, Shaista Majid Khan, the promoter of the project M.K Heritage (Registration No. P51800014952) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We sincerely regret the delay in the completion of the project and the delayed submission of this extension request. The primary reason for the delay is the severe financial constraints faced by the project due to the absence of any unit sales since the commencement of the project. As no residential or commercial units have been sold to date, the project has not generated the expected cash flow req

Litigation declared16

CaseCourtStatus
Civil suit/201918/2017/2017Dindoshi CourtDISPOSED
Civil Suit/202690/2016/2016DINDOSHI COURTRECORDING EVIDENCE
AO/14098/2017/2017BOMBAY HIGH COURTDISPOSED
MA in SESSIONS/200129/2019/2019DINDOSHI COURTHearing
Police cases/PW/186/2018/2018DINDOSHI COURTDISPOSED
Noticecases/1001073/2021/2021Dindoshi CourtDISPOSED
Civil Suit/202739/2016/2016DINDOSHI COURTChambers Summons Hearing
CAA/540/2017/2017BOMBAY HIGH COURTDISPOSED
Civil suit/201918/2017/2017Dindoshi CourtDISPOSED
Civil Suit/202690/2016/2016DINDOSHI COURTDISPOSED
AO/14098/2017/2017BOMBAY HIGH COURTDISPOSED
Noticecases/1001073/2021/2021Dindoshi CourtDISPOSED
Civil Suit/202739/2016/2016DINDOSHI COURTChambers Summons Hearing
CAA/540/2017/2017BOMBAY HIGH COURTDISPOSED
MA in SESSIONS/200129/2019/2019DINDOSHI COURTDISPOSED
Police cases/PW/186/2018/2018DINDOSHI COURTDISPOSED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf13 Aug 2026
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 as on June 2026.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 as on June 2026.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf13 Aug 2026
Withdrawal Update Form 1File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 2File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 2File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 2File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 2File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 2File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 2File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 2File: MAR 23.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 as on June 2026.pdf4 Aug 2026
Form 2A (FY 2025-2026)File: MKH Form 2A FY 2025-26.pdf4 Aug 2026
Declaration in FORM BFile: FORM B.pdf23 Aug 2023
Layout approvalFile: CFO 1.pdf18 Aug 2023
Building plan approvalFile: CFO 2.pdf18 Aug 2023
Building plan approvalFile: CFO 3.pdf18 Aug 2023
Layout approvalFile: CFO 1 (1).pdf18 Aug 2023
Copy of Layout Approval (in case of layout)File: CFO 1.pdf18 Aug 2023
Copy of Layout Approval (in case of layout)File: CFO 1 (1).pdf18 Aug 2023
Building Plan Approval (IOD)File: CFO 2.pdf18 Aug 2023
Building Plan Approval (IOD)File: CFO 3.pdf18 Aug 2023
Disclosure of sold/ booked inventoryFile: new inventory final.pdf18 Aug 2023
Certificates of CA (Form 3)File: MAR 18.pdf18 Aug 2023
Certificates of CA (Form 3)File: MAR 19.pdf18 Aug 2023
Certificates of CA (Form 3)File: MAR 20.pdf18 Aug 2023
Certificates of CA (Form 3)File: MAR 21.pdf18 Aug 2023
Certificates of CA (Form 3)File: DEC 21.pdf18 Aug 2023
Certificates of CA (Form 3)File: MAR 22.pdf18 Aug 2023
Certificates of CA (Form 3)File: JUN 22.pdf18 Aug 2023
Certificates of CA (Form 3)File: SEPT 22.pdf18 Aug 2023
Certificates of CA (Form 3)File: DEC 22.pdf18 Aug 2023
Certificates of CA (Form 3)File: MAR 23.pdf18 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR 18.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR 19.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR 20.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR 21.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC 21.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR 22.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JUN 22.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEPT 22.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC 22.pdf17 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR 23.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR 18.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR 19.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR 20.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR 21.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC 21.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR 22.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUN22.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEPT 22.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC 22.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR 23.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MAR 20.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MAR 21.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: DEC 21.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MAR 22.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: JUN 22.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SEPT 22.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: DEC 22.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MAR 23.pdf17 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 18-18.pdf17 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf17 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf17 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
M K ChamberP51800019724Bandra, Mumbai Suburban13Mar 2019Certificate SignedDec 2024Registered original: Dec 2023Dec 2024

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 96 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M.K Heritage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmM.K HeritageCompleted 118Lapsed / revoked 66Other 121Dot size: filed unitsN

Filed coordinates, straight-line distance. 305 registered projects within 2 km.

Builder: SHAISTA MAJID KHAN

SHAISTA MAJID KHAN has 4 registrations on MahaRERA, including Yakub Apartment and M.K Heritage. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if M.K Heritage is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M.K Heritage?

The registered promoter entity is SHAISTA MAJID KHAN, an individual as per the filing. Its GSTIN 27AGAPK8212G1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M.K Heritage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for M.K Heritage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at M.K Heritage?

The professionals named in the filing: Architect: Jainam Sunil Shah; Architect: SPACERA; Engineer: DIYA HOME SOLUTIONS; Engineer: M P PRIME STRUCTURES PRIVATE LIMITED; Engineer: S K Consultants & Engineers; Chartered Accountant: SANDEEP RATHI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in M.K Heritage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M.K Heritage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M.K Heritage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.