M K Chamber

By SHAISTA MAJID KHAN

RG-MH-69558 · RERA P51800019724 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Completion date moved by 51 months
  • 2 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 51 months from the original
5 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

M K Chamber is a Residential / Group Housing project by SHAISTA MAJID KHAN in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800019724 on 5 Mar 2019. Possession is promised by 31 Mar 2028. The completion date has moved by 51 months from the original filing. 13 of the 13 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameM K Chamber
  • TypeResidential / Group Housing
  • Location
    • Guru Nanak Road
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800019724
  • ReraGenie IDRG-MH-69558

Builder

  • NameSHAISTA MAJID KHAN
  • Entity typeIndividual
  • GSTIN27AGAPK8212G1ZN
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2019First promiseDec 2023Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Mar 2019
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed96 files

Current status

100%13 of 13 units booked

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
M K ChamberNA8813013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

M K Chamber: 54% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,212 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jun 2026
LandownerVillageDistrict
Shri Abdul Samad Adam MahimiAndheriMumbai Suburban
Shri. Abdul Munaf Adam MahimiAndheriMumbai Suburban
Mohammed Shafi Alimohhamad Bangdiwalla and 5 otherAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI2970.53
Proposed, not sanctioned2,971 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOff Linking Road, Bandra West - 400050

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS Spacera Architects
EngineerDIYA HOME SOLUTIONS
EngineerM.P.PRIME STRUCTURES PRIVATE LIMITED
Chartered AccountantSANDEEP RATHI & ASSOCIATES
Chartered AccountantA Q SHAIKH & CO LLP
PartnerRole in project
SHAISTA MAJID KHAN-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017544Dec 2023 → Dec 2024

Reason as filed by the promoterAs per the current scenario the project is completed with the structure and only the CFO work is pending. Since the matter is to be decided by the HON HIGH COURT, I am not able to apply for the Occupancy Certificate. Therefore, I would like to inform the authority to please grant us the extension in the above matter so that we can apply for occupancy certificate and close the project as per the RERA Rules and Regulations.

EA02072621661Dec 2023 → Mar 2028

Reason as filed by the promoterThe project is fully completed on site but due to High-court order and uncertainty about the full occupancy certificate. We are asking for extension up to 31.03.2028. Once the high court will allow the BMC to issue the full occupancy we will submit the same to Maharera and close the project.

Litigation declared3

CaseCourtStatus
SUIT/103460/2012/2012City Civil CourtDisposed
418/2018High CourtDisposed
632/2012High CourtDisposed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: FORM5 FY 2023-24.PDF22 Jun 2026
Form 5 (FY 2024-2025)File: FORM5 FY 2024-25.PDF22 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf5 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf5 Jun 2026
Form 1File: Form 1 30-06-2023.pdf1 Jun 2026
Form 2File: Form 2 30-06-2023.pdf1 Jun 2026
Form 3File: FORM 3 30-06-2023.pdf1 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD 30-06-2023.pdf1 Jun 2026
Form 1File: FORM 1 30-09-2023.pdf1 Jun 2026
Form 2File: FORM 2 30-09-2023.pdf1 Jun 2026
Form 3File: FORM 3 30-09-2023.PDF1 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD 30-09-2023.pdf1 Jun 2026
Form 1File: FORM 1 31-12-2023.pdf1 Jun 2026
Form 2File: FORM 2 31-12-2023.pdf1 Jun 2026
Form 3File: FORM 3 31-12-2023.PDF1 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD 31-12-2023.pdf1 Jun 2026
Form 1File: FORM 1 31-03-2024.pdf1 Jun 2026
Form 2File: FORM 2 31-03-2024.pdf1 Jun 2026
Form 3File: FORM 3 31-03-2024.PDF1 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD 31-03-2024.pdf1 Jun 2026
Form 1File: FORM 1 30-06-2024.pdf1 Jun 2026
Form 2File: FORM 2 30-06-2024.pdf1 Jun 2026
Form 3File: FORM 3 30-06-2024.PDF1 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD 30-06-2024.pdf1 Jun 2026
Form 1File: FORM 1 30-09-2024.pdf1 Jun 2026
Form 2File: FORM 2 30-09-2024.pdf1 Jun 2026
Form 3File: FORM 3 30-09-2024.PDF1 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD 30-09-2024.pdf1 Jun 2026
Form 1File: FORM 1 31-12-2024.pdf1 Jun 2026
Form 2File: FORM 2 31-12-2024.pdf1 Jun 2026
Form 3File: FORM 3 31-12-2024.PDF1 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD 31-12-2024.pdf1 Jun 2026
Disclosure of sold/ booked inventoryFile: new sold inventory.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 19.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 20.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 21.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DEC 21.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 22.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 JUN 22.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SEPT 22.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DEC 22.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MAR 23.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A DEC 21.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A MAR 22.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A JUNE 22.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A SEPT 22.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A DEC 22.pdf17 Aug 2023
Certificates of CA (Form 3)File: Form 3 DEC 21.pdf17 Aug 2023
Certificates of CA (Form 3)File: Form 3 MAR 22.pdf17 Aug 2023
Certificates of CA (Form 3)File: Form 3 JUN 22.pdf17 Aug 2023
Certificates of CA (Form 3)File: Form 3 SEPT 22.pdf17 Aug 2023
Certificates of CA (Form 3)File: Form 3 DEC 22.pdf17 Aug 2023
Certificates of CA (Form 3)File: Form 3 MAR 23.pdf17 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf17 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23.pdf17 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Bank Letter.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 18.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 19.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 20.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 21.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DEC 21.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 22.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JUNE 22.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SEPT 22.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DEC 22.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 23.pdf16 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A MAR 23.pdf16 Aug 2023
Layout approvalFile: APPROVED DRAWING.pdf23 Jun 2023
Copy of Layout Approval (in case of layout)File: APPROVED DRAWING.pdf23 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf23 Jun 2023
Declaration about Commencement CertificateFile: CC DECL.pdf20 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: Circular 29 M K Chamber.pdf25 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE M K Chambers.pdf23 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-2020 Site Supervisor Letter for RERA Submission M K Chambers scan copy.pdf23 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-2021 Site Supervisor Letter for RERA Submission M K Chambers scan copy.pdf23 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-2022- Site Supervisor Letter for RERA Submission M K Chambers scan copy.pdf23 Nov 2022
Declaration in FORM BFile: FORM B NOTARISED.pdf22 Feb 2019
Proforma of Allotment letterFile: Agreement Undertaking.pdf1 Feb 2019
OtherFile: Declaration for phase.pdf1 Feb 2019

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 51 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M K Chamber on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra6,700+ in Mumbai Suburban

2 kmM K ChamberCompleted 96Lapsed / revoked 46Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 278 registered projects within 2 km.

Builder: SHAISTA MAJID KHAN

SHAISTA MAJID KHAN has 4 registrations on MahaRERA, including Yakub Apartment and M.K Heritage. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if M K Chamber is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M K Chamber?

The registered promoter entity is SHAISTA MAJID KHAN, an individual as per the filing. Its GSTIN 27AGAPK8212G1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M K Chamber?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for M K Chamber?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at M K Chamber?

The professionals named in the filing: Architect: MS Spacera Architects; Engineer: DIYA HOME SOLUTIONS; Engineer: M.P.PRIME STRUCTURES PRIVATE LIMITED; Chartered Accountant: SANDEEP RATHI & ASSOCIATES; Chartered Accountant: A Q SHAIKH & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in M K Chamber?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M K Chamber. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M K Chamber to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.