Home / Browse projects / Pune, Maharashtra / M J OPERA
M J OPERA
RG-MH-23082 · RERA P52100032413 · Last updated on MahaRERA portal: 24 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 8 months past the filed date
- 5 complaints at MahaRERA
- Completion date moved by 4 months
- 1 extension taken
- Rs 24.00 crore secured on the land, in favour of STATE BANK OF INDIA
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
M J OPERA is a Others project by M/S SHIVDAN CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100032413 on 4 Jan 2022. Possession was promised by 28 Feb 2026 and is now 8 months past that date. The completion date has moved by 4 months from the original filing. 214 of the 248 units on this registration are recorded sold or booked, and 36 of 44 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameM J OPERA
- TypeOthers
- Location
- WAKAD
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032413
- ReraGenie IDRG-MH-23082
Builder
- NameM/S SHIVDAN CONSTRUCTIONS
- Entity typePartnership
- PartnersSURESH SHIVANDAS JETHWANI, BHAGWAN SHIVANDAS JETHWANI, SHYAM ARJUNDAS MENGHRAJANI, MUKESH SHIVANDAS JETHWANI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Jan 2022
- Promised completion28 Feb 2026
- Revised completionRevised to 28 Feb 2026 (originally 31 Oct 2025)
- Buildings4 building records
- Documents filed181 files
Current status
Figures as on 24 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 23 | 21 | 78 | 0 | 78 |
| B BUILDING | NA | 23 | 21 | 78 | 0 | 78 |
| COMMERCIAL BUILDING | NA | 5 | 1 | 0 | 16 | 16 |
| C BUILDING | NA | 23 | 21 | 76 | 0 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 24 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 90%.
A BUILDING95%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
B BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
COMMERCIAL BUILDING86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
C BUILDING97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 24 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed739
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A BUILDING | 76 | 166 | 242 |
| B BUILDING | 75 | 165 | 240 |
| COMMERCIAL BUILDING | 0 | 17 | 17 |
| C BUILDING | 75 | 165 | 240 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A BUILDING | NA | Rs 34.22 cr | Rs 32.51 cr |
| C BUILDING | NA | Rs 33.49 cr | Rs 28.46 cr |
| B BUILDING | NA | Rs 20.35 cr | Rs 19.33 cr |
| - | NA | Rs 7.14 cr | Rs 5.36 cr |
| COMMERCIAL BUILDING | NA | Rs 4.10 cr | Rs 3.69 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUPA ASSOCIATES |
| Architect | A B ARCHITECTS |
| Engineer | MR UMESH SHINDE |
| Engineer | AMIR MULANI |
| Chartered Accountant | R D KABRA AND ASSOCIATES |
| Chartered Accountant | NITISH VAIDYA & ASSOCIATES |
| Chartered Accountant | PGMJ & ASSOCIATES |
| Partner | Role in project |
|---|---|
| M/S SHIVDAN CONSTRUCTIONS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThrough Order dated December 12th, 2025- REGULATORY CASE NO. 435 OF 2025 Severe Rains, labour shortage, Cost escalation, impact of inflation. Request you to please grant extension till 28/02/2026 under Order 40 through hearing.
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600398 | Rahul Khankari | M/S SHIVDAN CONSTRUCTIONS | 21/01/2026 |
| CC12600634 | VISHAL MURLIDHAR JADHAV | M/S SHIVDAN CONSTRUCTIONS | 03/02/2026 |
| CC12601723 | Vishal Dhamde | M/S SHIVDAN CONSTRUCTIONS | 25/03/2026 |
| CC12602270 | Harshil Vaishnav | M/S SHIVDAN CONSTRUCTIONS | 17/04/2026 |
| CC12602414 | Vishal Shrikant Varkhede | M/S SHIVDAN CONSTRUCTIONS | 25/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed181
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 24 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Mar 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 24 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 upload final.pdf | 8 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 upload final.pdf | 8 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 upload.pdf | 8 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A upload.pdf | 8 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Final.pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3SEP 23 ok.pdf | 17 Oct 2025 |
| Form 1File: Form 1.pdf | 15 Oct 2025 |
| Form 2File: Form 2.pdf | 15 Oct 2025 |
| Form 3File: Form 3 upload.pdf | 15 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf | 15 Oct 2025 |
| Form 1File: Form 1.pdf | 3 Sep 2025 |
| Form 2File: Form 2.pdf | 3 Sep 2025 |
| Form 3File: Form 3.pdf | 3 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold circular.pdf | 3 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1 FY 24-25.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 FY 24-25.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 FY 24-25.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 FY 24-25 Q 1.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 FY 24-25 Q 2.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-6-2024.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-9-2024.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold sheet.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold sheet.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Flat List_Final.pdf | 5 May 2025 |
| Layout approvalFile: Approved Plans.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layoun 1.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 2.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 3.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 4.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 5.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 6.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 7.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 8.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 9.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building layout 10.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 11.pdf | 9 Dec 2024 |
| Building plan approvalFile: Building Layout 12.pdf | 9 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Approved Plans.pdf | 9 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CER.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 3.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 12.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 11.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building layout 10.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 9.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 8.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 7.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 6.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 5.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 4.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 2.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layoun 1.pdf | 9 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 - Shivdan Construction.pdf | 5 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: FORM-2 SEP 23 ok.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 Q 3.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- Q 4-Final.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SEP 23 ok.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to LegalFile: FORM-2 SEP 23 ok.pdf | 4 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A 2023-24.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3SEP 23 ok.pdf | 3 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shivdan rera form 3 as of 05-07-2022 dt 18-09-2022_compressed.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-09-2022.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-2022.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-03-2023.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 11-07-2023.pdf | 10 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2023.pdf | 10 Oct 2023 |
| Building plan approvalFile: HPSC0283 (1) (1)_compressed.pdf | 17 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0283 (1) (1)_compressed.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shivnandan mj opera jun 23.pdf | 17 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: _ARCHITECT CERTIFICATE.pdf | 14 Jul 2023 |
| Proforma of Agreement for saleFile: Rera Draft agreement.pdf | 7 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 7 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 181 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep M J OPERA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAKAD13,700+ in Pune
Filed coordinates, straight-line distance. 226 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: M/S SHIVDAN CONSTRUCTIONS
M/S SHIVDAN CONSTRUCTIONS has 1 registration on MahaRERA, including M J OPERA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that M J OPERA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if M J OPERA is delayed beyond 28 Feb 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of M J OPERA?
The registered promoter entity is M/S SHIVDAN CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in M J OPERA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against M J OPERA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for M J OPERA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at M J OPERA?
The professionals named in the filing: Architect: SUPA ASSOCIATES; Architect: A B ARCHITECTS; Engineer: MR UMESH SHINDE; Engineer: AMIR MULANI; Chartered Accountant: R D KABRA AND ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in M J OPERA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback