Registered Litigation declared Residential / Group Housing project

Luma Tower C

By ECC-KONARK JOINT VENTURE

RG-MH-07281 · RERA P51800054472 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 13 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 80%
86 of 173Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Luma Tower C is a Residential / Group Housing project by ECC-KONARK JOINT VENTURE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054472 on 25 Jan 2024. Possession is promised by 30 Sep 2027. 87 of the 173 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameLuma Tower C
  • TypeResidential / Group Housing
  • Location
    • Sahar Airport Road
    • Andheri
    • Bapnale
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054472
  • ReraGenie IDRG-MH-07281

Builder

  • NameECC-KONARK JOINT VENTURE
  • Entity typeOthers
  • Named personsEversmile Construction Company Private Limited, Konark Conwell LLP
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2024PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

50%87 of 173 units booked
35.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale Building - 1 - Wing CNA19161730173

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

Sale Building - 1 - Wing C: 14% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)40%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed173

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots173
Closed/Covered173

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,049 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI14867.58
Proposed, not sanctioned14,668 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchConwood House Yashodham General A K Vaidya Marg Goregaon East Mumbai 400063
Estimated costRs 128.76 cr
Cost incurredRs 45.95 cr
Work done35.69%
BuildingWingEstimatedIncurred
Sale Building - 1 - Wing CNARs 114.59 crRs 38.05 cr
-NARs 14.17 crRs 7.90 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architects & Consultants
EngineerJ W Consultants LLP
EngineerVP Consultants
EngineerZakirhusain Chaugule
Chartered AccountantN. A. Shah Associates LLP
Chartered AccountantNehali & Co.
Chartered AccountantNehali & Co
PartnerRole in project
ECC-KONARK JOINT VENTURE-

Litigation declared13

CaseCourtStatus
1558/2011City Civil Court at DindoshiAdjourned for hearing of Chamber Summons
2294/2002High Court at BombayMatter kept for final hearing and final disposal
174/2016Apex Grievance Redressal CommitteeMatter is closed for orders and settled
3011/2002High Court at BombayPending for final hearing
23/2014Hight Court at BombayPending for final hearing
1782/2006High Court at BombayHearing of Notice of Motion
170/2020Debt Recovery TribunalDebt is repaid and therefore the matter is infructuous
110/2023Apex Grievance Redressal CommitteeMatter is closed for orders and is settled
1005/2023Additional Collector Western SuburbsMatter is due for withdrawal
1004/2023Additional Collector Western SuburbsMatter is due for withdrawal
NA/2023Apex Grievance Redressal CommitteePending
19898/2023High Court at BombayPending without relief
1558/2011City Civil Court at DindoshiOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: IOA letter - 30-07-2024.pdf20 Apr 2026
Layout approvalFile: IOA Letter - 27-09-2024.pdf20 Apr 2026
Withdrawal Update Form 1File: Luma Tower C - Form 1 - 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Luma Tower C - Form 2 - 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Luma Tower C - Form 3 - 31-03-2026.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Luma Tower C - Form 2A - 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 1File: Form1 - Luma Tower C - 31-12-2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form1 - Luma Tower C - 31-12-2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 - Luma Tower C - 31-12-2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 - Luma Tower C - 31-12-2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - Luma Tower C - 31-12-2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - Luma Tower C - 31-12-2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 - Luma C - 30-09-2025.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 - Luma C - 30-09-2025.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 - Luma C - 30-09-2025.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 2024 2025.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Luma C Form 1 - 31-03-2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Luma C Form 3 - 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Luma C Form 2 - 31-03-2025.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Luma C - Sold-Unsold Inventory - 31-03-2025.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Luma C Form 2A - 31-03-2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Luma Tower C - Form 3 - 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Luma Tower C - Form 2 - 31-12-2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Luma Tower C - Form 1 - 31-12-2024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Luma Tower C - Discl of Sold Inventory - 31-12-2024.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: Luma C - Details of Fin Encumbrances.pdf2 Dec 2024
Details of encumbrances concerned to LegalFile: Luma C - Details of Fin Encumbrances.pdf2 Dec 2024
CERSAI detailsFile: CERSAI_Asset Based Report_Luma.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Luma C - Form 1 - 30-09-24.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Luma C - Form 3 - 30-09-24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Luma C - Form 2 - 30-09-24.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Luma Tower C - Sold-Unsold Inventory - 30-09-2024.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Luma C - 2023-2024.pdf8 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: Luma Tower C_2024073112584168.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Revised Luma C - Form 2A - 31-03-2024.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Luma Tower C Form 2 30-06-2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Luma Tower C Form-3 - 30-06-2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Luma C - 30-06-2024.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Engross - Luma Tower C Sold Unsold Inventory - 31-03-2024.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Engross - Luma Tower C - Sold-Unsold Inventory - 30-06-2024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Luma C - Form - 1- 31-03-2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Luma C - Form 2 - 31-03-2024.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Luma C - Form 2A - 31-03-2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Luma C - Form 3 - 31-03-2024.pdf20 Apr 2024
Other - LegalFile: 2 Comp - Deed of Admission of ECC-DB-KONARK - 26-05-2012.pdf12 Jan 2024
Other - LegalFile: Deed of Confirmation between ECCPL Konark Conwell LLP and DBRL.pdf12 Jan 2024
Proforma of Agreement for saleFile: 6 RERA UPLOAD 4 AFS - Luma Tower C - 05-01-2024.pdf5 Jan 2024
Deviation Report with respect to model copy of AgreementFile: 6 Engross - AFS Deviation Report - 05-01-2024.pdf5 Jan 2024
Copy of the legal title reportFile: 10 Revised Engross MAHA RERA Title Report - Luma Tower C.pdf4 Jan 2024
Building plan approvalFile: Luma Tower C - FSI - Highlighted - 01-09-2022.pdf22 Dec 2023
Details of encumbrances concerned to FinanceFile: Comp_Engross - Details of Litigation Encumbrances - 18-12-2023.pdf22 Dec 2023
Details of encumbrances concerned to LegalFile: Comp_Engross - Details of Litigation Encumbrances - 18-12-2023.pdf22 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Luma Tower C - FSI - Highlighted - 01-09-2022.pdf22 Dec 2023
CERSAI detailsFile: Details of Financial Encumbrances - 18-12-2023.pdf22 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Engross - Revised - CA certificate - Luma Tower C - 22-12-2023.pdf22 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosures of Int - Luma Tower C - 22-12-2023.pdf22 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Engross Declaration about Separate Bank Account - 22-12-2023.pdf22 Dec 2023
Other - LegalFile: Part I - Deed of Conveyance - Reg - 02-07-2010.pdf22 Dec 2023
Other - LegalFile: Part II - Deed of Conveyance - Reg - 02-07-2010.pdf22 Dec 2023
Other - LegalFile: Part III - Deed of Conveyance - Reg - 02-07-2010.pdf22 Dec 2023
Other - LegalFile: Part IV - Deed of Conveyance - Reg - 02-07-2010.pdf22 Dec 2023
Other - LegalFile: Joint Venture Agrement - 07-03-2007.pdf22 Dec 2023
Deviation Report with respect to Allotment letterFile: Engross - Allotment Deviation Report - 18-12-2023.pdf19 Dec 2023
Other - TechnicalFile: Declaration about Plot Area - 18-12-2023.pdf19 Dec 2023
Details of encumbrances concerned to FinanceFile: Details of Financial Encumbrances - 18-12-2023.pdf18 Dec 2023
Details of encumbrances concerned to LegalFile: Details of Financial Encumbrances - 18-12-2023.pdf18 Dec 2023
Declaration about Commencement CertificateFile: CC Declaration - 18-12-2023.pdf18 Dec 2023
Declaration in FORM BFile: Form B - Luma Tower C - 18-12-2023.pdf18 Dec 2023
Proforma of Allotment letterFile: 3 Allotment Letter -Luma Tower C - 15-12-2023.pdf18 Dec 2023
Layout approvalFile: APPROVED LAYOUT - 01-09-2022.pdf12 Dec 2023
Layout approvalFile: Proposed Layout_20231207_LAYOUT - 07-12-2023.pdf12 Dec 2023
Building plan approvalFile: IOA Sale bldg Letter _01-09-2022.pdf12 Dec 2023
Building plan approvalFile: 3 BASEMENT 03 - 01-09-2022.pdf12 Dec 2023
Building plan approvalFile: 2 BASEMENT 02 - 01-09-2022.pdf12 Dec 2023
Building plan approvalFile: 1 BASEMENT 01 - 07-12-2023.pdf12 Dec 2023
Building plan approvalFile: 4 Ground Floor - 01-09-2022.pdf12 Dec 2023
Building plan approvalFile: 5 First and Second Floor Plan - 01-09-2022.pdf12 Dec 2023
Building plan approvalFile: 6 Typical Floor Plan.pdf12 Dec 2023
Building plan approvalFile: 7 Refuge Floor Plan.pdf12 Dec 2023
Building plan approvalFile: LAYOUT WITH WING C PLINTH AREA MARKED - 07-12-2023.pdf12 Dec 2023

How this compares with Mumbai Suburban

50%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Luma Tower C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmLuma Tower CCompleted 100Lapsed / revoked 55Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: ECC-KONARK JOINT VENTURE

ECC-KONARK JOINT VENTURE has 2 registrations on MahaRERA, including LUMA TOWERS A & B and Luma Tower C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Luma Tower C is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Luma Tower C?

The registered promoter entity is ECC-KONARK JOINT VENTURE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Luma Tower C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Luma Tower C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Luma Tower C?

The professionals named in the filing: Architect: Aakar Architects & Consultants; Engineer: J W Consultants LLP; Engineer: VP Consultants; Engineer: Zakirhusain Chaugule; Chartered Accountant: N. A. Shah Associates LLP; Chartered Accountant: Nehali & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Luma Tower C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Luma Tower C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Luma Tower C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.