Home / Browse projects / Mumbai Suburban, Maharashtra / LOVELY CHS. LTD.,

Registered No litigation declared Residential / Group Housing project

LOVELY CHS. LTD.,

By JINAM REALTORS

RG-MH-28972 · RERA P51800028859 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
22 of 47Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

LOVELY CHS. LTD., is a Residential / Group Housing project by JINAM REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028859 on 5 Apr 2021. Possession is promised by 30 Dec 2026. The completion date has moved by 24 months from the original filing. 25 of the 47 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLOVELY CHS. LTD.,
  • TypeResidential / Group Housing
  • Location
    • KURAR VILLAGE
    • HAWA HEERA PARK
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800028859
  • ReraGenie IDRG-MH-28972

Builder

  • NameJINAM REALTORS
  • Entity typePartnership
  • PartnersVISHWASHREE DEVELOPERS PVT LTD, SHEELA NAVALKISHORE SHARMA, UTPAL SUBHASH SHETH, DHRUV UTPAL SHETH

Key dates

this monthRegisteredApr 2021First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2021
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed114 files

Current status

53%25 of 47 units booked
85.6%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LOVELY CHS LTDNA111047047

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

LOVELY CHS LTD: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Open Space20

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area678 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Aug 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2770.84
Proposed, not sanctioned808 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch104, MANAS RESIDENCY, SUBHASH ROAD, NEAR MAYUR CINEMA, KANDIVALI WEST, MUMBAI 67
Estimated costRs 5.88 cr
Cost incurredRs 5.03 cr
Work done85.58%
BuildingWingEstimatedIncurred
LOVELY CHS LTDNARs 5.56 crRs 4.97 cr
-NARs 32.00 lakhRs 6.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVINAYAK PATIL
EngineerDESAI & ASSOCIATES
EngineerBHANUPRASAD RAVAL
Chartered AccountantPRANAV SHARMA
Chartered AccountantH V JAIN & ASSOCIATES
Chartered AccountantMITESH NAWAL
PartnerRole in project
JINAM REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16092502609Dec 2024 → Dec 2026

Reason as filed by the promoterWe, JINAM REALTORS, hereby declare the following with respect to the project “LOVELY CHS. LTD.” bearing registration number P51800028859 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed 50% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the ongoing structural and finishing activities, which include plastering, flooring, electrical fittings, and other essential internal and external works in a phased manner. 2. Expected Timeline for Completion: We are committed to completing all balance works and

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604655Ambadas ChelimelaJINAM REALTORS25/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 as on December 2025.pdf17 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 as on December 2025.pdf17 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 as on December 2025.pdf17 Apr 2026
Withdrawal Update Form 1File: 17 Form 1 30-06-2025.pdf12 Dec 2025
Withdrawal Update Form 1File: 17 Form 1 30-06-2025.pdf12 Dec 2025
Withdrawal Update Form 2File: 17 Form 2 Jun 25.pdf12 Dec 2025
Withdrawal Update Form 2File: 17 Form 2 Jun 25.pdf12 Dec 2025
Withdrawal Update Form 3File: 17 Form 3 Jun 2025_250822_162632.pdf12 Dec 2025
Withdrawal Update Form 3File: 17 Form 3 Jun 2025_250822_162632.pdf12 Dec 2025
Form 1File: 16 Form 1 31-03-2025.pdf29 Oct 2025
Form 2File: 16 Form 2 Mar 25.pdf29 Oct 2025
Form 3File: 16 Form 3 Mar 2025.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: 16 Sold Unsold Mar 2025.pdf29 Oct 2025
Form 1File: 1 AC 1 June 2021.pdf21 Aug 2025
Form 2File: 1 EC June 21.pdf21 Aug 2025
Form 3File: 1 Form 3 June 21.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Jun 2021.pdf21 Aug 2025
Form 1File: 2 AC Sep 2021.pdf21 Aug 2025
Form 2File: 2 EC Sep 21.pdf21 Aug 2025
Form 3File: 2 Form 3 Sep 2021.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Sep 2021.pdf21 Aug 2025
Form 1File: 3 AC Dec 2021.pdf21 Aug 2025
Form 2File: 3 EC Dec 21.pdf21 Aug 2025
Form 3File: 3 Form 3 Dec 2021.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3 sold unsold Dec 2021.pdf21 Aug 2025
Form 1File: 4 AR 31-03-2022.pdf21 Aug 2025
Form 2File: 4 EC Mar 22.pdf21 Aug 2025
Form 3File: 4 Form 3 Mar 2022.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold unsold Mar 2022.pdf21 Aug 2025
Form 1File: 5 AR 30-06-2022.pdf21 Aug 2025
Form 2File: 5 EC June 22.pdf21 Aug 2025
Form 3File: 5 Form 3 June 2022.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 5 sold unsold Jun 2022.pdf21 Aug 2025
Form 1File: 6 AR 30-09-2022.pdf21 Aug 2025
Form 2File: 6 EC Sep 22.pdf21 Aug 2025
Form 3File: 6 Form 3 Sep 2022.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 6 Sold unsold Sep 2022.pdf21 Aug 2025
Form 1File: 7 AR 31-12-2022.pdf21 Aug 2025
Form 2File: 7 EC Dec 22.pdf21 Aug 2025
Form 3File: 7 Form 3 Dec 2022.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 7 Sold Unsold Dec 2022.pdf21 Aug 2025
Form 1File: 8 AR 31-03-2023.pdf21 Aug 2025
Form 2File: 8 EC Mar 23.pdf21 Aug 2025
Form 3File: 8 Form 3 Mar 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 8 Sold Unsold Mar 2023.pdf21 Aug 2025
Form 1File: 9 AR 30-06-2023.pdf21 Aug 2025
Form 2File: 9 EC June 23.pdf21 Aug 2025
Form 3File: 9 Form 3 Jun 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 9 Sold Unsold Jun 2023.pdf21 Aug 2025
Form 1File: 10 AR 30-09-2023.pdf21 Aug 2025
Form 2File: 10 EC Sep 23.pdf21 Aug 2025
Form 3File: 10 Form 3 Sep 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 10 Sold Unsold Sep 2023.pdf21 Aug 2025
Form 1File: 11 AR 31-12-2023.pdf21 Aug 2025
Form 2File: 11 EC Dec 23.pdf21 Aug 2025
Form 3File: 11 Form 3 Dec 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 11 Sold Unsold Dec 2023.pdf21 Aug 2025
Form 1File: 12 AR 31-03-2024.pdf21 Aug 2025
Form 2File: 12 EC Mar 24.pdf21 Aug 2025
Form 3File: 12 Form 3 Mar 2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 12 sold unsold Mar 2024.pdf21 Aug 2025
Form 1File: 13 AR 30-06-2024.pdf21 Aug 2025
Form 2File: 13 EC Jun 24.pdf21 Aug 2025
Form 3File: 13 Form 3 Jun 2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 13 Sold Unsold Jun 2024.pdf21 Aug 2025
Form 1File: 14 AR 30-09-2024.pdf21 Aug 2025
Form 2File: 14 EC Sep 24.pdf21 Aug 2025
Form 3File: 14 Form 3 Sep 2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 14 Sold Unsold Sep 2024 .pdf21 Aug 2025
Form 1File: 15 AR 31-12-2024.pdf21 Aug 2025
Form 2File: 15 EC Dec 24.pdf21 Aug 2025
Form 3File: 15 Form 3 Dec 2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: 15 Sold Unsold Dec 2024.pdf21 Aug 2025
Form 2A (FY 2021-2022)File: 1 Form 2A Mar 2022.pdf21 Aug 2025
Form 2A (FY 2022-2023)File: 2 Form 2A Mar 2023.pdf21 Aug 2025
Form 2A (FY 2023-2024)File: 3 Form 2A Mar 2024.pdf21 Aug 2025
Form 2A (FY 2024-2025)File: 4 Form 2A Mar 2025.pdf21 Aug 2025
Form 5 (FY 2023-2024)File: 3 Form 5 Mar24.pdf21 Aug 2025
Form 5 (FY 2024-2025)File: 4 Form 5 Mar 25.pdf21 Aug 2025
Form 5 (FY 2021-2022)File: 1 Form 5 Mar 22.pdf20 Aug 2025

How this compares with Mumbai Suburban

53%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LOVELY CHS. LTD., on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HAWA HEERA PARK6,700+ in Mumbai Suburban

2 kmLOVELY CHS. LTD.,Completed 68Lapsed / revoked 55Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 218 registered projects within 2 km.

Builder: JINAM REALTORS

JINAM REALTORS has 1 registration on MahaRERA, including LOVELY CHS. LTD.,. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LOVELY CHS. LTD., is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LOVELY CHS. LTD.,?

The registered promoter entity is JINAM REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LOVELY CHS. LTD.,?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LOVELY CHS. LTD.,?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LOVELY CHS. LTD.,?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LOVELY CHS. LTD.,?

The professionals named in the filing: Architect: VINAYAK PATIL; Engineer: DESAI & ASSOCIATES; Engineer: BHANUPRASAD RAVAL; Chartered Accountant: PRANAV SHARMA; Chartered Accountant: H V JAIN & ASSOCIATES; Chartered Accountant: MITESH NAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LOVELY CHS. LTD.,?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LOVELY CHS. LTD.,. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LOVELY CHS. LTD., to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.