Home / Browse projects / Pune, Maharashtra / LOTUS YOJANGANDHA

Registered No litigation declared Others project

LOTUS YOJANGANDHA

By Lotus Yojangandha Developers

RG-MH-93246 · RERA P52100053370 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 19.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited, Sundaram Alternates
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 60%
93 of 119Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

LOTUS YOJANGANDHA is a Others project by Lotus Yojangandha Developers in Pune, Maharashtra, registered with MahaRERA as P52100053370 on 27 Oct 2023. Possession is promised by 31 Dec 2026. 26 of the 119 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameLOTUS YOJANGANDHA
  • TypeOthers
  • Location
    • Shivthirth Nagar
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053370
  • ReraGenie IDRG-MH-93246

Builder

  • NameLotus Yojangandha Developers
  • Entity typePartnership
  • PartnersSMITA SATISH GIRI, INDRAYANI SATISH GIRI, JAGDISH MANOHAR GHORPADE
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed116 files

Current status

22%26 of 119 units booked
77.8%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA151256561
B wingNA151255358

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 60%.

A WING60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B wing60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered51
BuildingClosed/CoveredTotal
A WING5050
B wing11

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,393 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited, Sundaram Alternates
Secured amountRs 19.00 crore
CERSAI search filedYes
Declared on6 Apr 2026
LandownerVillageDistrict
YOJANGANDHA CO-OP HOUSING SOCIETY LIMITEDKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI14601.05
Proposed, not sanctioned5,310 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKothrud Pune
Estimated costRs 54.02 cr
Cost incurredRs 42.01 cr
Work done77.76%
BuildingWingEstimatedIncurred
A WINGNARs 54.02 crRs 42.01 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCH AMANNULLA INAMDAR
EngineerSATYA PRABHA GIRI
EngineerAnwarulla Sikandar Sutar
Chartered AccountantCA Anant A Dingare
Chartered AccountantCA RUPALI D PAWAR & CO
Chartered AccountantA.S.Gholkar and Company
Chartered AccountantM V JOSHI AND CO
PartnerRole in project
Lotus Yojangandha Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA FORM 1.pdf6 May 2026
Withdrawal Update Form 2File: RERA FORM 2.pdf6 May 2026
Withdrawal Update Form 3File: RERA FORM 3_compressed.pdf6 May 2026
Withdrawal Update Form 1File: RERA FORM 1.pdf22 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2.pdf22 Jan 2026
Withdrawal Update Form 3File: RERA FORM 3_compressed.pdf22 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 _compressed.pdf19 Jan 2026
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 2File: form 2.pdf16 Jan 2026
Withdrawal Update Form 2File: form 2.pdf16 Jan 2026
Withdrawal Update Form 2File: form 2.pdf16 Jan 2026
Withdrawal Update Form 2File: form 2.pdf16 Jan 2026
Withdrawal Update Form 3File: form 3_compressed.pdf16 Jan 2026
Withdrawal Update Form 3File: form 3_compressed.pdf16 Jan 2026
Withdrawal Update Form 3File: form 3_compressed.pdf16 Jan 2026
Withdrawal Update Form 3File: form 3_compressed.pdf16 Jan 2026
Withdrawal Update Form 1File: RERA Form 1.pdf12 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2.pdf12 Jan 2026
Withdrawal Update Form 3File: RERA Form 3_compressed.pdf12 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 Lotus Yojangandha 23-24.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf10 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2.pdf10 Jan 2026
Withdrawal Update Form 3File: RERA Form 3_compressed.pdf10 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf8 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf8 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf8 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf8 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf8 Jan 2026
Withdrawal Update Form 3File: Yojangandha Form 3.pdf8 Jan 2026
Withdrawal Update Form 3File: Yojangandha Form 3.pdf8 Jan 2026
Withdrawal Update Form 3File: Yojangandha Form 3.pdf8 Jan 2026
Withdrawal Update Form 3File: Yojangandha Form 3.pdf8 Jan 2026
Withdrawal Update Form 3File: Yojangandha Form 3.pdf8 Jan 2026
Details of encumbrances concerned to FinanceFile: Annexure A - Declearation cum Undertaking.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf13 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jun 2025
Details of encumbrances concerned to LegalFile: Annexure A - Declearation cum Undertaking.pdf13 Jun 2025
Declaration about Commencement CertificateFile: C C 2058_compressed.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YOJAN FORM 3.pdf31 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf31 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20250117191629.pdf17 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20250117191601.pdf17 Jan 2025
Details of encumbrances concerned to FinanceFile: Aditya Birla Mortgage Deed Index 2.pdf13 Jan 2025
Details of encumbrances concerned to LegalFile: Aditya Birla Mortgage Deed Index 2.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Jan 2025
Building plan approvalFile: 1-5.pdf6 Jan 2025
Building plan approvalFile: 2-5.pdf6 Jan 2025
Building plan approvalFile: 3-5.pdf6 Jan 2025
Building plan approvalFile: 4-5.pdf6 Jan 2025
Building plan approvalFile: 5-5.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-5.pdf6 Jan 2025
Declaration about Commencement CertificateFile: C C 2058.pdf6 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Lotus Yojangandha 23-24.pdf23 Dec 2024
Proforma of Agreement for saleFile: New Agreement.pdf15 Oct 2024
Details of encumbrances concerned to FinanceFile: Charge Encumbrance.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: Charge Encumbrance.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yojangandha Form 3.pdf12 Apr 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf9 Oct 2023
Layout approvalFile: SANCTION LAYOUT 1_3.pdf7 Oct 2023
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT 1_3.pdf7 Oct 2023
Copy of the legal title reportFile: Search ReportYojan.pdf26 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
LOTUS AMANP52100029240Dahnukar Colony, PuneMay 2021CompletedDec 2024Mar 2024

How this compares with Pune

22%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LOTUS YOJANGANDHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kothrud13,700+ in Pune

2 kmLOTUS YOJANGANDHACompleted 94Lapsed / revoked 51Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 300 registered projects within 2 km.

Builder: Lotus Yojangandha Developers

Lotus Yojangandha Developers has 1 registration on MahaRERA, including LOTUS YOJANGANDHA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LOTUS YOJANGANDHA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LOTUS YOJANGANDHA?

The registered promoter entity is Lotus Yojangandha Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LOTUS YOJANGANDHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LOTUS YOJANGANDHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LOTUS YOJANGANDHA?

The professionals named in the filing: Architect: ARCH AMANNULLA INAMDAR; Engineer: SATYA PRABHA GIRI; Engineer: Anwarulla Sikandar Sutar; Chartered Accountant: CA Anant A Dingare; Chartered Accountant: CA RUPALI D PAWAR & CO; Chartered Accountant: A.S.Gholkar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LOTUS YOJANGANDHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LOTUS YOJANGANDHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LOTUS YOJANGANDHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.