Home / Browse projects / Pune, Maharashtra / LOTUS SHEETAL

Registered No litigation declared Others project

LOTUS SHEETAL

By Lotus Landmarks

RG-MH-88897 · RERA P52100052702 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 37 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2030Possession promisedmoved 37 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 0%
21 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

LOTUS SHEETAL is a Others project by Lotus Landmarks in Pune, Maharashtra, registered with MahaRERA as P52100052702 on 22 Sep 2023. Possession is promised by 31 Jan 2030. The completion date has moved by 37 months from the original filing. 0 of the 21 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameLOTUS SHEETAL
  • TypeOthers
  • Location
    • Shivthirth Nagar
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052702
  • ReraGenie IDRG-MH-88897

Builder

  • NameLotus Landmarks
  • Entity typePartnership
  • PartnersSMITA SATISH GIRI, INDRAYANI SATISH GIRI, JAGDISH MANOHAR GHORPADE
  • Other registrations2 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredSep 2023First promiseDec 2026Revised toJan 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion31 Jan 2030
  • Revised completionRevised to 31 Jan 2030 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed71 files

Current status

0%0 of 21 units booked
14.1%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lotus SheetalNA9412921

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Lotus Sheetal: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Open Space106

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,473 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Dec 2025
LandownerVillageDistrict
SHEETAL COMPLEX CO-OP HOUSING SOCIETY LTDKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI12995.55
Proposed, not sanctioned2,087 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAundh Pune
Estimated costRs 35.84 cr
Cost incurredRs 5.05 cr
Work done14.09%
BuildingWingEstimatedIncurred
Lotus SheetalNARs 35.84 crRs 5.05 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCH AMANNULLA INAMDAR
ArchitectJAY AERAM
EngineerMR SATISH WAMAN GIRI
EngineerANWARULLA SIKANDAR SUTAR
Chartered AccountantCA PRAVIN M SHIVNECHARI
Chartered AccountantCA Anant A Dingare
Chartered AccountantA S Gholkar and Company
Chartered AccountantM V JOSHI AND CO
Chartered AccountantPravin E Pise
PartnerRole in project
Lotus Landmarks-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20062621463Dec 2026 → Jan 2030

Reason as filed by the promoterThe subject project was originally proposed as a redevelopment project of Sheetal Complex Cooperative Housing Society Ltd. Based on the said proposal, the Promoter obtained the necessary sanctions and obtained RERA certificate. Thereafter, Laxmi kavach Cooperative Housing Society Ltd. and Sulakshana Heights Cooperative Housing Society Ltd. joined the redevelopment project, resulting in the amalgamation of all three societies into a single project. Due to this change, the Promoter was required to obtain fresh and revised approvals from the competent authorities. Accordingly, the Promoter obtain

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2030

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: 1.pdf23 Jul 2026
Form 2A (FY 2024-2025)File: 2.pdf23 Jul 2026
Form 2A (FY 2025-2026)File: 3.pdf23 Jul 2026
Form 2A (FY 2026-2027)File: 4.pdf23 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf22 Jul 2026
Withdrawal Update Form 3File: Form 3_compressed.pdf22 Jul 2026
Form 5 (FY 2023-2024)File: Form 5.pdf22 Jul 2026
Form 5 (FY 2024-2025)File: Form 5.pdf22 Jul 2026
Withdrawal Update Form 1File: LOTUS SHEETAL FORM 1.pdf11 May 2026
Withdrawal Update Form 2File: LOTUS SHEETAL FORM 2.pdf11 May 2026
Withdrawal Update Form 3File: LOTUS SHEETAL FORM 3.pdf11 May 2026
Withdrawal Update Form 1File: Form 1.pdf16 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 (3).pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 (3).pdf16 Jan 2026
Withdrawal Update Form 1File: FORM1.pdf8 Dec 2025
Withdrawal Update Form 1File: FORM1.pdf8 Dec 2025
Withdrawal Update Form 1File: FORM1.pdf8 Dec 2025
Withdrawal Update Form 1File: FORM1.pdf8 Dec 2025
Withdrawal Update Form 1File: FORM1.pdf8 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Dec 2025
Withdrawal Update Form 3File: FORM 3 (2).pdf8 Dec 2025
Withdrawal Update Form 3File: FORM 3 (2).pdf8 Dec 2025
Withdrawal Update Form 3File: FORM 3 (2).pdf8 Dec 2025
Withdrawal Update Form 3File: FORM 3 (2).pdf8 Dec 2025
Withdrawal Update Form 3File: FORM 3 (2).pdf8 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3_compressed.pdf16 Sep 2023
Copy of the legal title reportFile: Legal Title report.pdf4 Sep 2023
Proforma of Agreement for saleFile: New Agreement V1.pdf4 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 20230902201432.pdf2 Sep 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf2 Sep 2023
Other - TechnicalFile: PMC SHEETAL.pdf1 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Sheetal complex.pdf31 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf29 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Shital Apart NA order.pdf29 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 2 A and FORM 5.pdf29 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account declaration.pdf29 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account declaration.pdf29 Aug 2023
Layout approvalFile: 1.pdf28 Aug 2023
Building plan approvalFile: 2.pdf28 Aug 2023
Details of encumbrances concerned to FinanceFile: NIL ENCUMBRANCE CERTIFICATE.pdf28 Aug 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE CERTIFICATE.pdf28 Aug 2023
Details of encumbrances concerned to LegalFile: NIL ENCUMBRANCE CERTIFICATE.pdf28 Aug 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE CERTIFICATE.pdf28 Aug 2023
Copy of Layout Approval (in case of layout)File: 1.pdf28 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf28 Aug 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf28 Aug 2023
Declaration in FORM BFile: FORM B Declaration_Develper.pdf28 Aug 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Shital Apart Registration Letter.pdf28 Aug 2023
Deviation Report with respect to Allotment letterFile: Devation to Allotment letter and agreement.pdf28 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Devation to Allotment letter and agreement.pdf28 Aug 2023
CERSAI detailsFile: CERSAI_report.pdf25 Aug 2023
PAN CardFile: Lotus Sheetal pan card.pdf24 Aug 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 37 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LOTUS SHEETAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kothrud13,700+ in Pune

2 kmLOTUS SHEETALCompleted 77Lapsed / revoked 41Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 274 registered projects within 2 km.

Builder: Lotus Landmarks

Lotus Landmarks has 3 registrations on MahaRERA, including LOTUS SHEETAL and LOTUS SEVA. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LOTUS SHEETAL is delayed beyond 31 Jan 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LOTUS SHEETAL?

The registered promoter entity is Lotus Landmarks, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LOTUS SHEETAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LOTUS SHEETAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LOTUS SHEETAL?

The professionals named in the filing: Architect: ARCH AMANNULLA INAMDAR; Architect: JAY AERAM; Engineer: MR SATISH WAMAN GIRI; Engineer: ANWARULLA SIKANDAR SUTAR; Chartered Accountant: CA PRAVIN M SHIVNECHARI; Chartered Accountant: CA Anant A Dingare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LOTUS SHEETAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LOTUS SHEETAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LOTUS SHEETAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.