ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / LOTUS CHANDAN RESIDENCY

Registration approved No litigation declared Mixed Development project

LOTUS CHANDAN RESIDENCY

By PRANAVA BUILDERS AND DEVELOPERS

RG-KA-60263 · RERA PRM/KA/RERA/1257/333/PR/091026/009006 · Last updated on RERA Karnataka portal: 1 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 76 documents Report an error

LOTUS CHANDAN RESIDENCY is a Mixed Development project by PRANAVA BUILDERS AND DEVELOPERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/333/PR/091026/009006 on 9 Oct 2026. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameLOTUS CHANDAN RESIDENCY
  • TypeMixed Development
  • Location
    • Dakshina Kannada
    • 575006
  • Pincode575006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/333/PR/091026/009006
  • ReraGenie IDRG-KA-60263

Builder

  • NamePRANAVA BUILDERS AND DEVELOPERS
  • Entity typeProprietorship
  • GSTIN29BLVPS8668H1ZS
  • Authorized SignatorySAMPATH KUMAR SHETTY TALAPADYU
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2026PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Oct 2026
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LOTUS CHANDAN RESIDENCY-----38

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 1 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area824 sq m
Named landowners2
LandownerVillageDistrict
CHANDANDAS--
CHANDANDAS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.87 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 9.22 cr-
Payment of taxesRs 1.00 cr-
On-site expenditure-Site OverheadRs 25.00 lakh-
On-site expenditure-Consultants FeesRs 20.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 20.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRIYANKA GANESH SUVARNA
EngineerDHANRAJ
Chartered AccountantRAKSHITHA VINAY SHETTY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed76

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/333/PR/091026/009006 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
ADVOCATE SEARCH REPORTFile: Legal Opinion - Lotus Chandan Residency.pdf1 Oct 2026
flow of titles in favour of landownersFile: FLOW OF TITLE DEED - LOTUS CHANDAN RESIDENCY.pdf25 Sep 2026
Title Deed of Current Landowner 14/3 Part 1File: TITLE DEED - CHANDAN DAS - 14-3 -P1.pdf25 Sep 2026
Title Deed of Current Landowner 14/3 Part 2File: TITLE DEED - CHANDAN DAS - 14-3 P2.pdf25 Sep 2026
EC from 1-4-2011 to till dateFile: EC From 01-04-2011 till Date.pdf25 Sep 2026
E khata ClarrificationFile: E Khatha Clarrification.pdf25 Sep 2026
Advocate search reportFile: Advocate Search Report.pdf25 Sep 2026
approval cost ClarrificationFile: Approval Cost Clarrification.pdf25 Sep 2026
structural engineer licence of the engineer who has signed the structural stability certificateFile: Structural Engineer Licence Along with M Tech Certificate - Lotus Signature.pdf25 Sep 2026
MESCOM NOCFile: Mescom NOC- Lotus Chandan Residency.pdf25 Sep 2026
TITLE DEED/ FLOW OF TITLE OF LANDOWNERSFile: Title Deed -Flow of Title of Landowners.pdf7 Sep 2026
EC FROM 2011File: ECC - LOTUS CHANDAN RESIDENCY.pdf7 Sep 2026
E KHATHAFile: E KHATHA - LOTUS CHANDAN RESIDENCY.pdf7 Sep 2026
ADVOCATE SEARCH REPORTFile: CHANDAN SEARCH REPORT.pdf7 Sep 2026
Single Plot layout/Development plan ApprovedFile: Single Site Order Plan.pdf7 Sep 2026
Single Plot layout/Development OrderApprovedFile: Single Site Order.pdf7 Sep 2026
ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Certified Sketch.pdf7 Sep 2026
demarcation of land dedicated for the project along with its boundaries including latitude and longiFile: Latitude and Longitude of the end points of the project.pdf7 Sep 2026
all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Sanctioned Drawings and Floor Plans.pdf7 Sep 2026
commencement certificate.File: Commencement Certificate.pdf7 Sep 2026
Demarcation of proposed land in Approved Master plan Certified by the competent authorityFile: Approved Master Plan.pdf7 Sep 2026
Village map certified by the competent authorityFile: Village Map - Lotus Chandan Residency.pdf7 Sep 2026
KSPCB NOC NOT APPLICABLE ATTACHED GUIDLINESFile: STP mandatory notification by GoK.pdf7 Sep 2026
Approval/NOC under section 14 or 69 of the KTCP Act from competent AuthorityFile: Approval NOC under section 14 or 69 of the KTCP Act.pdf7 Sep 2026
Brochure of the project with amenities detailsFile: Lotus Chandan Residency Brochure.pdf7 Sep 2026
structural stability certificateFile: Structural Stability Certificate - Lotus Chandan Residency.pdf7 Sep 2026
possession clause in allotment letterFile: ALLOTMENT LETTER - LOTUS CHANDAN RESIDENCY.pdf7 Sep 2026
project section 3(1) notarised affidavit with project name and project addressFile: Project Section 3(1) notarised Affidavit.pdf7 Sep 2026
MESCOM NOCFile: MESCOM NOC WITH PAYMENT CHALLAN - LOTUS CHANDAN RESIDENCY.pdf7 Sep 2026
WATER NOCFile: WATER NOC - LOTUS CHANDAN RESIDENCY.pdf7 Sep 2026
Land cost calculation sheet as per the guidance value(Self-attested copy) along with guidance certiFile: Land Cost Calculation along with Guidance Certificate.pdf7 Sep 2026
Sewer line drawing with full project name and address along with engineer sFile: Sewer Line Drawing with full project name and address along with engineer signature.pdf7 Sep 2026
brief project estimation with licenced engineer signatureFile: ABSTRACT ESTIMATE - LOTUS CHANDAN RESIDENCY.pdf7 Sep 2026
RTC, survey 14/3(Part 1)-
Mutation, survey 14/3(Part 1)-
Encumbrance Certificate, survey 14/3(Part 1)-
Conversion/Alienation Order, survey 14/3(Part 1)-
Sale/Title/Gift Deed, survey 14/3(Part 1)-
JDA, survey 14/3(Part 1)-
Khatha, survey 14/3(Part 1)-
RTC, survey 14/3(Part 2)-
Mutation, survey 14/3(Part 2)-
Encumbrance Certificate, survey 14/3(Part 2)-
Conversion/Alienation Order, survey 14/3(Part 2)-
JDA, survey 14/3(Part 2)-
Khatha, survey 14/3(Part 2)-
Registration CertificateFile: TRADE LICENSE.pdf-
GST CertificateFile: GST CERTIFICATE PRANAVA BUILDERS.pdf-
Certificate issued by CA Form 1File: Form-1 - CA Certificate - Lotus Chandan Residency.pdf-
Certificate issued by Architect Form 2File: Form -2, Architect Certificate -Chandan Residency.pdf-
Certificate issued by Engineer Form 3File: Form -3, Engineer Certificate - Chandan Residency.pdf-
TDR Purchase Deed / Sale DeedFile: TDR Sale Deed - Chandan.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit - No litigation.pdf-
Balance Sheet 2024 - 2025File: BS, P&L, SCH - 2024-25_compressed.pdf-
Balance Sheet 2023 - 2024File: BS, P&L, SCH-2023-24.pdf-
Balance Sheet 2022 - 2023File: BS, P&L, SCH-2022-23.pdf-
Audited Profit and Loss Statement 2024 - 2025File: BS, P&L, SCH - 2024-25_compressed.pdf-
Audited Profit and Loss Statement 2023 - 2024File: BS, P&L, SCH-2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: BS, P&L, SCH-2022-23.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: SAMPATH KUMAR SHEETY - INCOME TAX RETURN - 2024-25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: SAMPATH KUMAR SHEETY - INCOME TAX RETURN - AY 2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: SAMPATH KUMAR SHETTY - INCOME TAX RETURN - 2022-23.pdf-
LICENSE LOTUS CHANDAN-
APPROVED BUILDING PLAN-
SANCTIONED DRAWING OF THE APARTMENTS-
LOTUS CHANDAN- SPECIFICATIONS-
Lotus Chandan Residency Brochure_compressed-
RELIQUISHMENT DEED - CHANDAN RESIDENCY-
AFS - Pranava Builders and Developers-
ALLOTMENT LETTER-
Affidavit - Form B-
Joint Affidavit - Lotus Chandan Residency-
ADVOCATE SEARCH REPORT-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationStatusPromisedDelivered
LOTUS GOWRISHANKARURVA MANGALOREOngoingDec 2029Not due yet
LOTUS PEARLASHONAGAR MANGALOREOngoingAug 2028Not due yet

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep LOTUS CHANDAN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmLOTUS CHANDAN RESIDENCYOther 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: PRANAVA BUILDERS AND DEVELOPERS

PRANAVA BUILDERS AND DEVELOPERS has 3 registrations on RERA Karnataka, including LOTUS CHANDAN RESIDENCY and LOTUS GOWRISHANKAR. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if LOTUS CHANDAN RESIDENCY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of LOTUS CHANDAN RESIDENCY?

The registered promoter entity is PRANAVA BUILDERS AND DEVELOPERS, a proprietorship as per the filing. Its GSTIN 29BLVPS8668H1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in LOTUS CHANDAN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at LOTUS CHANDAN RESIDENCY?

The professionals named in the filing: Architect: PRIYANKA GANESH SUVARNA; Engineer: DHANRAJ; Chartered Accountant: RAKSHITHA VINAY SHETTY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LOTUS CHANDAN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LOTUS CHANDAN RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LOTUS CHANDAN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.